Loading…
Loading…
Tender ID
Tender Value
₹4.5 Cr
EMD Value
₹9.1 L
Closing Date
24 Mar 2026, 3:00 pmClosed
General Manager, Zone-5
General Manager, Zone-5, U.P. Projects Corporation Ltd. Gomti Barrage, Left Bank, Gomti Nagar, Lucknow
Fire Fighting work for Girls, Boys, J.R.S.R and Auditorium for Government Medical College, Orai, District-Jalaun, (U.P.)
2026_UPPRC_1114399_2
51/UPPCL/GM-5/E-TENDER/2025-26
Open Tender
Civil Works - Buildings
Percentage
270 days
District-Jalaun, (U.P.)
Fire Fighting work for Girls, Boys, J.R.S.R and Auditorium for Government Medical College, Orai, District-Jalaun, (U.P.)
2 documents required · 2 mandatory
₹17,700
₹9.1 L
6 Apr 2026
19 Mar 2026
24 Mar 2026
19 Mar 2026
24 Mar 2026
19 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Fire Fighting work for Girls, Boys, J.R.S.R and Auditorium for Government Medical College, Orai, District-Jalaun, (U.P.) | |||||
| 2OVER HEAD WATER TANK (civil work) 10 Nos. | |||||
| 3Providing and laying in position ready mixed or sitebatched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana /Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement..All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum R.C.C. work in slab (A) Ground Floor | |||||
| 4Providing and laying in position ready mixed or sitebatched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana /Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement..All works above plinth level upto floor V level Concrete of M25 grade with minimum cement c ontent of 330 kg /cum R.C.C. work in Beam (A) Ground Floor | |||||
| 5Providing and laying in position ready mixed or sitebatched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana /Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement..All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum R.C.C.work in column (A) Ground Floor | |||||
| 6TMT Fe-500 iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. (A) Ground Floor | |||||
| 7First Floor | |||||
| 8Centering and shuttering including strutting, propping etc. and removal of form for all heights : Columns,Pillars, Piers, Abutments, Posts and Struts. | |||||
| 9Lintels, beams, plinth beams, girders, bressumers and cantilevers. | |||||
| 10Suspended floors, roofs, landings, balconies and access platform. | |||||
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
cancelled_1.pdf
pdf • 0.47 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
BID.pdf
Tender Documents • 6.97 MB
BOQ_2102147.xls
BOQ • 0.92 MB
Corrigendum.pdf
PDF • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .