Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 CrAdmitted-Finance | -7.55% | ₹2.7 Cr | L1 | Admitted-Finance |
Tender Value
₹2.9 Cr
EMD Value
₹1.4 L
Closing Date
30 Apr 2026, 5:30 pmClosed
SANJEEV GUPTA
GWALIOR MUNICIPAL CORPORATION
Survey, Designs and Preparation of Drawings for laying of main trunk from Sagartal Chauraha to Hathiyapour and branch lateral sewers in nearby areas including other works in Gwalior Vidhansabha as per approved designs and drawings within Gwalior Muni
2026_UAD_480570_2
MPGMC/24/26X9/1/PHE/2025-26
Open Tender
Miscellaneous Works
180 days
PHE DEPARTMENT
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
₹1.4 L
14 May 2026
15 Apr 2026
4 May 2026
16 Apr 2026
30 Apr 2026
23 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation for foundation, trenches for pipes / cables or drains etc. by mechanical means / manual means (exceeding 30cm in depth. ) Including ramming of bottom, dressing of sides, disposal of excavated earth including of all lift and lead upto 50m. Disposed earth to be levelled and neatly dressed. All kinds of ordinary soil 0 to 1.5m | - | cum | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | 1.5m to 3m | - | cum | 1 | - | BI01010001010000000000000515BI0100001113 |
| 3 | 3m to 4.5m | - | cum | 1 | - | BI01010001010000000000000515BI0100001113 |
| 4 | 4.5m to 6m | - | cum | - | - | BI01010001010000000000000515BI0100001113 |
| 5 | 6m to 7.5m | - | cum | - | - | BI01010001010000000000000515BI0100001113 |
| 6 | In or under water and/or liquid mud, including pumping out water as required. (All water that may accumulate in excavations during the progress of the work from seepage, (not due to the negligence of the contractor), shall be bailed, pumped out or otherwise removed. The contractor shall take adequate measures for bailing and/or pumping out water from excavations and/or pumping out water from excavations and construct diversion channels, bunds, sumps, etc) Muddy soil 0 to 1.5m | - | cum | 1 | - | BI01010001010000000000000515BI0100001113 |
| 7 | 1.5m to 3m | - | cum | 1 | - | BI01010001010000000000000515BI0100001113 |
| 8 | 3m to 4.5m | - | cum | 0.2 | - | BI01010001010000000000000515BI0100001113 |
| 9 | 4.5m to 6m | - | cum | - | - | BI01010001010000000000000515BI0100001113 |
| 10 | 6m to 7.5m | - | cum | 1 | - | BI01010001010000000000000515BI0100001113 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
TenderDocument.pdf
Tender Documents • 1.95 MB
BOQ_602863.xls
BOQ • 0.27 MB
NIT2.pdf
Additional Documents • 1.17 MB
Drawing.pdf
Additional Documents • 0.52 MB
Estimate.pdf
Additional Documents • 4.72 MB
Download all tender documents and submit your bid