Hubli Electricity Supply Company Limited
NAGAPPA C BELAKERI
Providing additional 3rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Kallolli in Gokak Taluk, Belagavi District in 33KV S&L Division, Belagavi on PTK Basis (5 MVA Power Transformer and other allied materials will be supplied by departmentally) (Reserved for CATII(A) category)
HESCOM/2025-26/EL/WORK_INDENT1107
HESCOM/2025-26/EL/WORK_INDENT1107
Reserved
Electrical
Two Tender Document System(Two Cover)
HESCOM Superintending Engineer (PMC)Corporate Office Hubli
21 documents required · 21 mandatory
The bidder should have executed work of installation and commissioning of minimum of One No. 5MVA and above higher capacity power transformers of 33/11KV and above voltage class with associated switchgears and ODS on Total Turnkey or Partial turnkey or labour Contract basis in any one of the in the last Five Financial Years.(i.e.,2019-20, 2020-21,2021-22,2022-23 and 2023-24) on Total Turnkey/Partial Turnkey Basis/ Labour contract basis /self-execution basis in any State/ Central Govt. Distribution Companies / PSUs.Such works shall be in successful operation for a period of at least 1(One) year as on date of submission of bid.As a proof of documentary evidence Award copies and work completion certificates duly mentioning date of work completion and Executed cost issued by the competent authority not below the rank of Executive Engineer (Ele) of any State/Central Govt. Distribution Companies / PSUs shall be uploaded. The Experience certificate shall be submitted as per Annexure-IV
The Bidder should have achieved in at least one financial year, an annual financial turnover of not less than the amount put to tender in the last five financial years in the last five financial years (i.e., 2020-21 2021-22, 2022-23, 2023-24 & 2024-25).The bidder shall upload the downloaded Form GSTR-9/9C, 3CA/3CB & 3CD from the portal along with Copies of Annual turnover certificate and audited balance sheet of profit and loss account duly mentioning the UDIN No duly certified by Chartered Accountant as applicable.Documents without UDIN No, GSTR-9/9C, 3CA/3CB & 3CD downloaded from portal are liable for rejection.Note: Updated to the FY in which the tenders are invited. Financial turnover of previous years shall be given a weight of 10% (say) per year to bring them to the price level of the FY in which the tenders are invited.
The cash at bank, term deposits and availability of fund based credit facilities shall not be less than 30% of the amount put to tender (Rs. 21.32Lakhs)shall be supported by a certificate issued by Nationalized/ scheduled Bank as per the Annexure format attached shall be uploaded.If the Tenderer has banking with more than one Bank, then the available liquid assets mentioned above on a particular date i.e., as on date of bid submission or at a later date before the last date for bid submission of tender shall be the same date for all the banks.The said Credit Facility Certificate should possess the name of the Firm and tender Indent number and the credit facility to be issued in the name of Superintending Engineer (Ele),PMC, Corporate Office,HESCOM, Navanagar, Hubli. The credit facility certificate should be in the Format Annexed to this bid.ANNEXURE.The conditional credit certificates are liable for rejection.
The bidder should have Satisfactorily completed (at least 90% of the contract value), as prime a contractor, at least one contract involving work of installation and commissioning of 5MVA and above higher capacity power transformers 33/11KV and above voltage class of value not less than 25% of the amount put to Tender of Rs. 17.77Lakhs in any State/Central Govt./ Distribution Companies/PSUs in the last Five Financial Years (i.e.,2019-20, 2020-21,2021-22,2022-23 and 2023-24).As a proof of documentary evidence Award copies and work completion certificates duly mentioning date of work completion and Executed cost issued by the competent authority not below the rank of Executive Engineer (Ele) of any State/Central Govt. Distribution Companies / PSUs shall be uploaded. The Experience certificate shall be submitted as per Annexure-IV.Note- Updated to the FY in which the tenders are invited. The value of the completed works shall be given a weight of 10% per year to bring them to the price level of the FY in which the tenders are invited
The bidder shall be a sole proprietorship firm or a partnership firm or a company incorporated under companies Act 1956/2013. Copy of the Certificate of Incorporation in case of Registered Company/ Partnership deed in case of Partnership Firm/GST or PAN registration in case proprietor ship firm is to be uploaded.
The bidder should possess valid Class-I / Super grade Electrical Contractor license issued by the Electrical Inspectorate, Govt. of Karnataka. The validity of the license should be in force at the time of submission of Bids. The bidder should possess valid Class-I / Super grade Electrical Contractor license issued by the Electrical Inspectorate, Govt. of Karnataka. The validity of the license should be in force at the time of submission of Bids.(Note: Firm name in the license as well as all the statutory documents should be same otherwise bid is liable for rejection).Scanned original copy of the Class-1 / Super grade Electrical Contractors License issued by Electrical Inspectorate, Government of Karnataka is to be uploaded by the bidder.
The bidder should upload original scanned copy of ESI issued by the respective competent authorities of the concerned department.
The bidder should upload original scanned copy of EPF Reg. No issued by the respective competent authorities of the concerned department
The bidder should upload original scanned copy of Pan No issued by the respective competent authorities of the concerned department.
The bidder should upload original scanned copy of GST No. issued by the respective competent authorities of the concerned department.
The bidder should possess valid original scanned copy of Registration Certificate of Establishment FORM C (Labour Reg.) issued by Department of Labour, Government of Karnataka. The bidder should upload original scanned copy of Registration Certificate of Establishment FORM C (Labour Reg.) issued by Department of Labour, Government of Karnataka
The bidder should not have been Black-Listed by ESCOMs/ KPTCL/ any other Government Distribution/ Transmission utilities including PSUs as on date of bid submission. Self-declaration for the same shall be uploaded (Annexure-I).
The bidder should not have been defaulted & Terminated due to non-performance in execution of works against the order placed by ESCOMs/KPTCL/any other Government Distribution/Transmission utilities including PSUs as on date of bid submission. Self-declaration for the same shall be uploaded (Annexure-II)
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years with /KPTCL/ESCOMS. A history of awards involving litigations against the bidder or any part may result in rejection of bid. Self-declaration for the same shall be uploaded (Annexure-III)
Tender Capacity: The bidder should upload available tender capacity calculated in the prescribed format through e-procurement portal within due date of submission of bids. The available tender capacity shall be more than the total tender value.
Pre Survey: The bidder at his own responsibility must visit and examine the site of works & its surroundings and obtain all information that may be necessary for participating in the tender. The cost of the visiting/survey of the proposed works shall be at the bidders own expenses.The site inspection survey certificate of the proposed works issued by the concerned Executive Engineer (Ele).33KV S&L Division, HESCOM should be obtained by the bidder and shall be uploaded
The bidder from Nations sharing Border with India should upload the certificate issued by GOI.OR Self-declaration for not from Nations sharing Border with India.Registration certificate issued by the competent authority shall be uploaded. OR If not Self-declaration in the prescribed format as per Annexure-VII shall be uploaded.The self-declaration shall clearly indicate the tender enquiry number & date on which declaration is done.
Bidder shall upload caste certificate issued by the competent authority as a proof for CAT-II(A)
Bidder shall upload domicile certificate issued by the competent category for residing 10 years in state of Karnataka
₹1,780
₹71,200
8 Sept 2026
4 Apr 2026
24 Apr 2026
9 Apr 2026
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Providing additional 3rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Kallolli in Ghataprabha Taluk, Belagavi District in 33KV S&L Division, Belagavi on PTK basis (5 MVA Power Transformer and other allied materials will be supplied by departmentally)
Sl. No Particulars Material Labour Civil Total
1 Materials cost (Exclusive of GST) 4667798.42 4667798.42
2 Labour charges+ Decommissioning (Exclusive of GST) 520800.47 520800.47
3 Civil Engineering Charges (Exclusive of GST) 1919467.80 1919467.80
5 Area Specific Loading @ 3% on SI No 4 0 0 0 0.00
% age of tender compenents included
Executive Engineer (EL), Superintending Enginner (El),
Projects - 1 , HESCOM, Hubli PMC, HESCOM, Hubli
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Providing additional 3rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Kallolli in Ghataprabha Taluk, Belagavi District in 33KV S&L Division, Belagavi on PTK basis (5 MVA Power Transformer and other allied materials will be supplied by departmentally)
PART-A (Material portion)
Sl. No. Particulars Unit Qty Rate Amout in Rs. Remarks Remarks
HESCOM PORTION-A
AA.1 L.C. (B1) Power Transformers:
a) 33/11KV, 5 MVA, DELTA/STAR, DY 11, 3Ph, 50Hz,Core type winding with OLTC, RTCC panel etc., complete filled with Transil Oil and 10 % spare Oil in Non Returnable Drums (Power Transformer shall be supplied by departmentaly) (As per ESCOM's CSR- 2023-24 33KV Material. page No- 69 of 81 SL.No-1, Item No-1.01 ,Material Code-1.01) Nos 0 8381013.60 0.00
AA2 L.C. (B5) 11kV NCTs 600-300/1-1-1A KPTCL SR- 2023-24 page No-31 SL.No-5, Item No-5.2.19 HSN Code-8504, RS-47190 No's 0 50000.00 0.00 Individual material's written down value not available from released good 33/11KV STATION , Hence SR rates taken and Material will be taken from idle good 33/11KV STATION ARALIMATTI/HALLUR/TIGADI
AA3 L.C. (B8) b) 11KV 400A Double break GOS with H frame for mounting Structure(Dwg No. BESCOM/GM/QS&S/22 Dtd 24.11.2018),(As per ESCOMs SR- 2025-26, Page No- 10 of 50, SL.No-205) Set 0 23134.8 0.00
AA4 L.C. (B1) b) S.M. Rail angle for Transformer plinth ( 2 nos. of 3m long) SM rail. (As Per KPTCL SR-2023-24, Page No:116, Sl.No.10, Set Rs=1626.00) and .M.S angle 75 x 75 x 6 mm angle iron 8 mtr long 0.2 MT each.(As Per PWD Electrical SR-2023-24, Page No:19, Sl.No.5.40, Item No:5.41.3, Per Mtr Rs:555 X 8 = Rs.4440.00) ,(1626+4440=6066.00) Set 0.000 6016 0.00 52.5
AA5 L.C. (B11) Conductors
a) Lynx ACSR (30/2.79 mm Al + 7/2.79 mm St), Std Wt: 842 Kg/KM As per KPTCL SR- 2025-26, No- 02, SL.No-23) Kms. 0.000 213000.00 0.00 -120 Individual material's written down value not available from released good 33/11KV STATION , Hence SR rates taken and Material will be taken from idle good 33/11KV STATION ARALIMATTI/HALLUR/TIGADI
b) Coyote ACSR (26/2.54 mm Al + 7/1.90 mm St), Std Wt: 521 Kg/KM As per KPTCL SR- 2025-26, No- 02, SL.No-24) Kms. 0.000 155000.00 0.00
AA6 L.C. (B10) 33 kV side Station Structure
a) Station structures Tower - 3T1 with peak and Fabrication, galvanising and supply of Mild Steel tower materials As per KPTCL SR- 2025-26, No- 02, SL.No-16) t 0.000 124000.00 0.00 0.522 Individual material's written down value not available from released good 33/11KV STATION , Hence SR rates taken and Material will be taken from idle good 33/11KV STATION ARALIMATTI/HALLUR/TIGADI
b) Station structures Beam - 3B1 (6M Width), As per KPTCL SR- 2025-26, No- 02, SL.No-16) t 0.000 124000.00 0.00
Deloaded by 21% on Departmentally supplied material cost.Rs.6648721.12/1.21=Rs.5494810.84 0.00
Total cost 0.00
HESCOM PORTION-B (material with Written Down Value RATES)
BA.1 L.C. (B2) 33KV SF-6/ VCB Breakers:
a) 36KV, 800A, 25KA SF6 Circuit breaker with spring type semi pneumatic/ pneumatic operating mechanism, including mounting arrangements, rigid bi-metallic terminal connector complete suitable for Coyote ACSR with capacitor trip devices for instantaneous tripping in case of DC failure for power transformer. (As per written down value of released good 33KV circuit breaker from idle 33/11KV MUSS Aralimatti. calculation sheet enclosed, material value=164995/2=82497.5) Nos 0 82497.50 0.00 82497.5
BA.2 L.C. (B3) Control and relay panels Simplex type as per technical specifications (Control Voltage 110V DC)
b) 5MVA, 33/11KV Transformer Panel (As per written down value of released good 5MVA, 33/11KV Transformer C&R Panel, from idle 33/11KV MUSS Aralimatti. calculation sheet enclosed, material value:234382/2=117191) panel 0 117191.00 0.00 117191
BA.3 L.C. (B4) 33KV Current Transformers For Transformer
a) 36KV, 20KA CT of ratio 200-100/1-1-1A with rigid terminal connector suitable for Coyote ACSR conductor with marshallling Box for power transformer. (As per written down value of released good 33KV Current Transformers from idle 33/11KV MUSS Aralimatti. calculation sheet enclosed, material value:24523/6=4087.17) Nos 0 4087.17 0.00 4087.166667
BA.4 L.C. (B7) Surge Arrestors, Metal Oxide, as per Technical Specification.
a) 30KV, 10KA normal duty Polymeric with terminal connectors suitable for Coyote Conductor (As per written down value of released good 33KV LAs from idle 33/11KV MUSS Aralimatti. calculation sheet enclosed, material value:4140/9=460) No's 0 460.00 0.00 460
BA.5 L.C. (B8) 33 KV Isolators :
1) 33KV, 800A, 25 KA Class Double Break manually operated isolators with Pad connectors suitable for Coyote ACSR Conductor, as per technical specification with Solid Core, cylindrical post insulators
a) a) 33 kV, 800 A, 25 kA Upright without Earth Switch (As per written down value of released good 33KV isolator from idle 33/11KV MUSS Aralimatti. calculation sheet enclosed, material value:25136/5=5027.20) Nos 0 5027.20 0.00
2) 11 KV Isolators 400A with manually operated isolators with Pad connectors suitable for Lynx ACSR Conductor, as per technical specification with cylindrical post insulators 5027.2
c) 11KV 400A Special Roaster switch with H frame for mounting Structure.(As per written down value of released good 11KV roaster S/B GOS from idle 33/11KV MUSS Aralimatti. calculation sheet enclosed, material value:14039/12=1169.92) Set 0 1169.92 0.00
BA.6 L.C. (B09) 11kV Switch Gear
a) 11 kV PCVCB, 350 MVA, 25 kA, 1250 A incomer, 800 A feeder (SCADA compatible) comprising of INCOMER ( MEI MAKE ) (As per written down value of released good 11KVBank PCVCB from idle 33/11KV MUSS Aralimatti. calculation sheet enclosed, material value:122857/11=11168.8) No 0 11168.80 0.00 11168.81818 (2banks +6Fdr+2CB+ap3)=11
b) 11 kV PCVCB, 350 MVA, 25 kA, 1250 A Feeder 800 A feeder (SCADA compatible) comprising of Feeder( MEI MAKE ) (As per written down value of released good 11KV FEEDER PCVCB from idle 33/11KV MUSS Aralimatti. calculation sheet enclosed, material value:122857/11=11168.8) No 0 11168.80 0.00
c) Annunciator Panel for the following combinations (for both MCVCB & PCVCB), 1IC+4F+1CB (As per written down value of released good 11KV Announciator Panel from idle 33/11KV MUSS Aralimatti. calculation sheet enclosed, material value:122857/11=11168.8) No 0 11168.80 0.00
TOTAL MATERIAL COST TO BE SUPPLIED BY HESCOM
AGENCY PORTION-C
CA.3 L.C. (B3) Control and relay panels Simplex type as per technical specifications (Control Voltage 110V DC)
b) 33KV Panel for Overhead Line (KPTCL SR-2023-24, Page No:41,Sl. No-16 Item No:16.2.8,HSN Code,8537 Rs:214170 (33KV Panel rate) panel 1 214170.00 214170.00 Not updated in new SR
CA.2 L.C. (B 4) 33KV Current Transformers for 33KV LINE 0.00
c) 36KV, 20KA CT of ratio 400-200/1-1-1A with rigid terminal connector suitable for Coyote ACSR conductor with marshallling Box for Incomer. KPTCL SR- 2023-24 page No- 31 SL.No-5, Item No-5.2.14 ,HSN Code-8504, RS-42350 Nos 3 45000.00 135000.00
CA.3 L.C. (B7) Surge Arrestors, Metal Oxide, as per Technical Specification. 0.00
b) 10 kV, 5 kA Lightning Arrester Polymeric type with GROUND DISCONNECTOR),(,(As per ESCOM's SR-2023-24 Page No.8 of 5 SL.No.174 Set (3 Nos) 4 1785.60 7142.40 Not updated in new SR
CA.4 CAPACITOR BANK with 0.2% Series Reactor & NCT 0.00
a) Design, engineering, supply, erection of Capacitor Bank with internal fuses, terminal connector, Neutral CTs & 0.2% series reactors on neutral side with elevating/mounting structure and with 10% spare capacitors complete, 12.1 kV, 2.9 MVAr Star connected Capacitor Bank (This does not include breaker, panel, civil works like excavation and foundation concreting works),(As per KPTCL SR 2023-24,Volume-6,Page No.39,Sl.No.12,Item No.12.1.7) Set 1 538450.00 538450.00 Not updated in new SR
b) 11 kV PCVCB, 500 MVA, 25 kA, 1250 A feeder (SCADA compatible) Feeder Panel for Capacitor Bank (As per KPTCL SR- 2023-24, No- 12, SL.No-220) No. 1 741843.00 741843.00 Not updated in new SR
CA.5 L.C. (B10) MOUNTING STRUCTURES: With including fabrication and galvanisation. 0.00
a) Mounting Structure: 33KV, 800A, 25 KA Class Double Break manually operated ISOLATOR Live point height 3750 mm - 2Nos. (As per KPTCL SR- 2023-24, No- 02, SL.No-16) ii) (The weight of structure is 0.240t X2 Nos=480t) t 0.240 124000.00 29760.00
b) Mounting Structures:33KV Current Trasformers- 0.142x 3Nos =0.426 t As per KPTCL SR- 2023-24, No- 02, SL.No-16) t 0.426 124000.00 52824.00
c) Mounting Structures:33KV Lightning Arrestors - 0.082 x 3 Nos =0.0.246 tAs per KPTCL SR- 2023-24, No- 02, SL.No-16) t 0.246 124000.00 30504.00 0.261
d) Mounting Structures: P.I. Support (33kv side): 0.082x 9 Nos =0.738 t As per KPTCL SR- 2023-24, No- 02, SL.No-16) t 1.23 124000.00 152520.00 1.23
e) Mounting Structures:11KV NCT 1 No. 0.146x 1 No =0.146 t As per KPTCL SR-2023-24, No- 02, SL.No-16) t 0.146 124000.00 18104.00
f) Mounting Structures:High P.I. Support (11kv side),2 Nos Harizontal cross arm for support of 11 KV 3CX400 Sq.mm XLPE U.G cable 0.22x 2 Nos =0.44 t As per KPTCL SR- 2023-24, No- 02, SL.No-16) t 0.44 124000.00 54560.00 265.5
CA.6 i) Bolts & Nuts for all Station Mounting Structures, such as, I)3T1- (0.017t), 3B1 (0.010t), As per KPTCL SR 2023-24, Page No. 244, Sl. No. I; Item No. (D)(i.ii). II)a)33KV ISO (0.008t X 1 =0.008t)Asper KPTCL SR 2023-24, Page No. 245,Sl. No. I; Item No.(E)3(d). b) 33KV CT (0.010t X 3 =0.03t) Asper KPTCL SR 2023-24, Page No.245,Sl. No.I; Item No.(E)2(d). c) 33KV LAs( 0.005X3=0.015) Asper KPTCL SR 2023-24, Page No.245,Sl. No.I; Item No. E) 4(d). d) 33KV PI (0.005x15 =0.75 t) ( Asper KPTCL SR 2023-24,Page No-247 Sl.NO:II, Item.No:E (iv), e)11KV NCT(0.011x 1 No =0.011t) (Asper KPTCL SR 2023-24, Page No-247 Sl.NO:II, Item.No:D(viii), f)11KV high PI(0.011x 2No =0.022t) (Asper KPTCL SR 2023-24, Page No-247 Sl.NO:II, Item.No:D(viii), TOTAL=0.88MT (Bolts & Nuts Rate, As per KPTCL SR 2023-24; Page No-43;Sl.No.18 Item No.18.3) Rs 142780.00t t 0.880 142780.00 125646.40 0.034 0.01 0.008 0.03 0.015 0.75 0.011 0.022 0.88 Not updated in new SR
a) 9 Mtr. Long, 145kg RCC pole for 11KV ODS.( As per KPTCL SR- 2023-24, No- 02 of 50, SL.No-01) Nos 20 7531.20 150624.00 Not updated in new SR
b) RCC Pole - 8 Mtr Long, 115 Kg WL for LED Light ( As per ESCOMs SR- 2023-24, No- 02 of 50, SL.No-03) Nos 5 5647.20 28236.00 Not updated in new SR
CA.8 L.C. (B10) 33 kV side Station Structure 0.00
a) Station structures Tower - 3T1 with peak and Fabrication, galvanising and supply of Mild Steel tower materials As per KPTCL SR- 2023-24, No- 02, SL.No-16) t 0.174 124000.00 21576.00 0.174 0.030276
CA.9 L.C. (B14) 11 KV D.P.Structures: 0.00
a) D.P. Structures with hardware consisting of double power X-arms, horizonontal cross brace, cross braces, back cleat, strain plate, bolt & nuts, painted with two coats of metal primer and aluminium paint, etc as per drawing. As per ESCOMs SR- 2023-24, No- 10 of 50, SL.No-214) Set 4 6164 24657.60 Not updated in new SR
CA.10 L.C. (B15) Control Cable with Accessories: (With glands/lugs/ferruels) 0.00
a) 19 Core 2.5 Sq.mm (As per KPTCL SR-2023-24,As per KPTCL SR- 2023-24, No- 10, SL.No-181) . Kms. 0.681 585000.00 398385.00
b) 4 Core 6 Sq.mm (As per KPTCL SR-2023-24, Page No:40 Sl No-13, Item No:13.8, HSN Code:8544, Rs:247*1000=.247000 Total Rs =247000) Kms. 0.578 247000.00 142766.00 Not updated in new SR
c) 4 core 2.5 Sq.mm As per KPTCL SR- 2023-24, No- 10, SL.No-176) Kms. 0.110 153000.00 16830.00
d) 2 core 2.5 Sq.mmAs per KPTCL SR- 2023-24, No- 10, SL.No-175) Kms. 0.450 99000.00 44550.00
e) 10 Core 2.5 Sq.mm As per KPTCL SR- 2023-24, No- 10, SL.No-179) Kms. 0.080 344000.00 27520.00
CA.11 Insulators & Hardware materials: 0.00
a) Pad clamp for Coyote ACSR As per KPTCL SR- 2023-24, No- 3, SL.No-45) Nos 16 848.00 13568.00
b) Pad clamp for Lynx ACSR As per KPTCL SR- 2023-24 No- 3, SL.No-45) Nos 48 849.00 40752.00
Pad clamp for Rabbit ACSR (As per KPTCL SR-2023-24, Page No:67, Sl.No-76 Item No:10.08, Material Code:285723 Rs:583 Nos 12 583.00 6996.00 Not updated in new SR
c) C - Type Wedge Connector for Coyoteto Coyote ACSR (As per KPTCL SR-2023-24, Page No:15, Sl.No,284 Nos 12 742 8904.00 Not updated in new SR
d) C - Type Wedge Connector for Lynx to Lynx ACSR(As per KPTCL SR-2023-24, Page No:15, Sl.No,287 Nos 39 1551 60489.00
Pad clamp for Lynx ACSR As per KPTCL SR- 2023-24, No- 3, SL.No-45) Nos 24 849.00 20376.00
e) 33KV CT bimetalic clamps for Lynx ACSR (As per present market rate) Nos 12 1000.00 12000.00
f) NCT Pad Clamp (As per KPTCL SR-2023-24, Page No:71, Sl.No-47 Item No:47.13, material code:7318 Rs:864 Nos 2 977.00 1954.00
g) Post Insulator Clamps (for Single Lynx ACSR Conductor 127/76 mm,110/66/33 kV (Asper KPTCL SR-2023-24, Page No69, Sl.No-47 Item No:47.5.6, HSN Code:7318 Total Rs =943) Nos 15 991.00 14865.00
h) Terminal Connector Clamps Suitable for 36 kV class bushing to suit Coyote / Lynx conductor for HV Bushings of Power Transformers (Asper KPTCL SR-2023-24, Page No 135, Sl.No-E Item No-viii HSN Code:8536 Total Rs =512) Nos 3 508 1523.31
h) Terminal Connector Clamps Suitable for 12.1 kV class bushing to suit Drake conductor for Bushings of Power Transformers (As per KPTCL SR-2023-24, Page No 135, Sl.No.2E Item No-ix HSN Code:8536 Total Rs.1113/-) Nos 4 1113.00 4452.00 78.75
i) Strain Clamp for Lynx ACSR, ( ((As per ESCOMs SR- 2025-26, Page No- 3 of 50 SL.No-46) Nos 42 707 29694.00
Bolted type Strain Clamp for Coyote ACSR, (As per KPTCL SR 23-24, Page No.68, Sl. No.: 47, Item No.47.1.11) Rs-1326 Nos 24 1326 31824.00
Bolted type Suspension clamps for Lynx(KPTCL SR 23-24, P-4 I-65) Nos 3 1326.00 3978.00
j) Solid Core Bus Post Insulator 33 kV (As per KPTCL SR-2023-24, Page No:45, Sl.No-21 Item No:21.1.5, HSN Code- 8546 Rs:3653 Nos 15 3663.00 54945.00
k) 70 KN Disc Insulators Ball and socket type(As per KPTCL SR-2023-24, Page No:45, Sl.No-21 Item No:21.44, HSN Code- 8546 Rs:518/-) Nos 153 519.00 79407.00
i) I bolts (As per present market rate) Nos 80 55.00 4400.00
CA.12 Ground Mat & Earthing : 0.00
a) Grounding of equipment by providing Cast iron pipe of 100 mm ID 13 mm thickness, 2.75 metre long with 2 part clamp out of G.I. Flat 50 X 6 mm continuously welded alround the pipe using cast iron welding electrodes as per drawing including the cost of excavation (All materials to be supplied by the contractor) (As per KPTCL SR-2023-24, Page No:115, Sl.No-6 Item No:c Material Rs-12792+3491 Labour Set 14 16283.00 227962.00 47+4 21 Not updated in new SR
b) Supplying & providing 450 mm dia 450 mm height 1.5" to 2" thick hume pipe collar (non pressure type) for earth pits including all lead and lifts etc.,.(As per KPTCL SR-2023-24, Page No:124, Sl.No-26 Item No:i Material Rs-1499.00 Each 14 1499.00 20986.00 47+4 159 Not updated in new SR
c) Grounding of equipment with 50X6 mm GI flat & connecting equipment to the earth mat / ground pit. Each point of Earthing with all formation works like bending, twisting, drilling of holes & conncting by welding (inclusive of all T & P consumables) to the earth mat/ ground pit/point of earth connection, all the materails supplied by the contractor (As per KPTCL SR-2023-24, Page No:123, Sl.No-26 Item No:i Material Rs-335.00 Rmt 271 335.00 90785.00 Not updated in new SR
d) Supplying and laying of MS Flats of various sizes, welding and applying ACB paint to welded portion and covering with sodium bentonite clay as per the drawing/standard specification and consolidation (MS Flat of size 50x6 ) (As per KPTCL SR-2023-24, Page No:123, Sl.No-26 Item No:f Material Rs-404.00 m 395 404.00 159580.00 Not updated in new SR
CA.13 L.C. (B16) 11kV, 3X400 Sqmm Core, XLPE HTUG Cable (ROUND Armoured Cable) 0.00
a) 11 kV, 3x400Sqmm Core, XPLE HTUG Cable with pressure extruded inner sheeth, ROUND WIRE ARMOURED as per IS-7098 (Part-2) Armouring wires dia and Resistivity as per IS-3975 As per ESCOMs SR- 2023-24, No- 15 of 50, SL.No-323) (RL=80 Mtrs X 2 Runs=160 Mtr). Kms. 0.160 2990892 478542.72
b) Cable Covering Tiles 250x125x40 mm or 125x125x40mm. As per KPTCL SR- 2023-24, No- 31 of 50, SL.No-675 & 676) Nos 600 11 6468.48
c) Artificial/Manufacture Sand (Extracted from Vol-1, PWD SR Sl No. 62),(As per BESCOM's SR-2023 CDS-24,Sl.No.257,CDS-21,Item No.6) Cmt 20 1771 35424.79
d) GI Pipe, 150 mm Dia for drain crossing, cable raising etc., (As per BESCOM's Cost data sheet-23, Sl No-9 (Extracted from Vol-5, BWSSB SR Item No. 177) Mtr 16 1839 29418.84
e) Route and Joint indicating stones As per KPTCL SR- 2023-24, No- 31 of 50, SL.No-677 & 676) Nos 10 140 1404.00
11kV Jointing and Cable Termination Kits 0.00
f) Heat Shrinkable Outdoor Type Cable Termination Kit for XLPE Cable 3X400 Sqmm ( As per ESCOMs SR- 2023-24, No- 20 of 50, SL.No-419) Per Kit 4 5633 22531.20
CA.14 Miscellaneous items 0.00
a) Caution/Danger Board (As per KPTCL SR- 2023-24, No- 31 of 50, SL.No-687) Nos 4 157.20 628.80
b) Phase plates (As per KPTCL SR 2023-24, Page No.43, Sl. No.19, Item No,19.1, Rs.528/- Set (3 Nos) 3 528.00 1584.00
c) Name Plates for equipment/Earth Pit (As per present market rate due to non availability of rates in the current SR) Nos 28 250.00 7000.00
d) Earth bond 450mm long (As per KPTCL SR 2023-24, Page No.43, Sl. No.19, Item No,19.4, Rs.538/- Nos 8 538.00 4304.00
d) Name plate for feeders and banks (As per present market rate due to non availability of rates in the current SR) Nos 7 250.00 1750.00
CA.15 L.C. (B18) a) Station yard LED outdoor light fitting Higher end Philips / Havells / Equivalent complete fitting set.
Supply of 90W LED yardlight with pressure die cast aluminium housing body with optimal heat sink for better thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output. Rated life Burning Hrs 50000 hr & Lumen Mainanance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT > 5500K, IP 66 optiical and electrical compartment & impact resistance of complete luminare > IK08. Power Factor > 0.9 with mains Surge Protection - Min 5KV along with over Voltage / Overload, short circuit / miswiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60 Hz application. Overload & Short circuit protection ensures reliable operation in spite of problem in output side. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintanance at the sight location with minimized minimal tools. LED light fixture with ...90 W System Power Consumption. LED Efficiency>130lm/w nominal CRI. 75. LImunaire manufacturer should have in-house facilitty accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing / Body part. warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacture & Cree/Nichia/Lumileds/Osram make LED Source. Elec. KPWD Ele SR 23-24 (Pg No.45 of 105, item No 11.8.4) Nos 5 8860.00 44300.00
b) 2 Core , 6 Sq. mm, 1.1KV class armoured Al. Cable including PVC pipes for Yard Lighting complete. ,Material Page No: 4 of 28, Sl No.1,item no.1.12.2,Material Rate Rs.120.32 Mtrs 100 155 15471.28
c) 32 Amps, DP Switch for Yard Lighting complete.(As per PWD SR 2023-24 Pg no.9 of 105,Sl.no.3.6,item no.3.6.9)Supplying and fixing. Rs-326 Nos. 4 326.00 1304.00
d) MCB 6-32 A DP (Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898 ) (As per PWD SR 2023-24 Pg no.17 of 105,Sl.no.5.18,item no.518.4). Rs-739.00 Nos. 4 739.00 2956.00
CA.16 FIRE FIGHTING EQUIPMENT (with necessary mounting stand) 0.00
a) Foam type extinguisher (Mech) 9.00 Ltr. Capacity. (As per KPTCL SR 2023-24, Page No.74 Sl.No.51, Item No,51.1.2, Rs.4118/- Nos 2 4118.00 8236.00
b) Carbon dioxide type 4.5Kg. Capacity (As per KPTCL SR 2023-24, Page No.74 Sl.No.51, Item No,51.5.2, Rs8691/-) Nos 2 8691.00 17382.00
CA.17 Station Service Equipments: 0.00
a) Single line diagram Photo sheet paper (Size 20x20 inch) (As per present market rate) Nos 2 2000.00 4000.00
b) Supplying and installation of Rubber mat 1mtr x 1mtr -1Omm thick.complete including cost of materials, labour, usage charges of machinery complete as per specifications. (As per PWD SR 2023-24, Page No.93 of 105 Sl.No.15, Item No,15.117, Rs 1900/-) Nos 8 1900.00 15200.00
CA.18 Maintenance Tools and Plant 0.00
a) SF6 Gas filled in 50 kg Cylinders (including non returnable carbon steel cylinders (As per KPTCL SR-2023-24, Page No:54, Sl.No:35.32, Item No:35.32 HSN code- 8543 Rs-67812 Nos 1 67812 67812.00
b) Rubber hand gloves : 15 kV tested (As per KPTCL SR-2023-24, Page No:54, Sl.No:35.10, Item No:35.32 HSN code- 4015 Rs- 293 Pairs 2 293 586.00
C) Insulation Tester Digital type (Megger) : 2.5 kV - 5 kV (As per KPTCL SR-2023-24, Page No:54, Sl.No:35.27, Item No:35.32 HSN code- 8207 Rs- 55308 No 1 55308 55308.00
TOTAL MATERIAL COST Y 4667798.42 4522261.32
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Providing additional 3rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Kallolli in Ghataprabha Taluk, Belagavi District in 33KV S&L Division, Belagavi on PTK basis (5 MVA Power Transformer and other allied materials will be supplied by departmentally)
PART-B (Electricals Erection Works)
Sl. No. Particulars Unit Qty Rate Amout in Rs.
B.1 a) Power Transformers: Moving the Transformer to the plinth. (15 MT for 20 mtrs) on ramp. (As per KPTCL SR-2023-24 Page No-116, Sl.No-9, Item No-(a)) Rs-80/- per MT/ mtr 300 80.00 24000
b) Assembly of Transformer parts like bushings, radiators, filling oil into Transformer etc., for the total weight of the Transformer. (As per KPTCL SR-2023-24 Page No-116, Sl.No-9, Item No-(b)) 1134.00 MT 15 1134.00 17010
c) Filtration of oil using filter set of the contractor, to bring the insulation value to I.E. Specifications.(As per KPTCL SR-2023-24 Page No-116, Sl.No-9, Item No-(d)) Rs-7.00 ltrs 3500 7.00 24500
d) 5 MVA to 6.3/8 MVA Tr Wiring: Identification of wires,Wiring of Transformer marshalling box, bucholtz relay, OLTC upto control panel Ferruling crimping and termination of wires. Wiring of Protective Devices, OLTC, RTCC , fixing Thermometer, etc.,including assisting in Testing & Commissioning: (As per KPTCL SR-2023-24 Labour,Page No-116, Sl.No-9, Item No-(f&i)) 6708 per transfor mer 1 6708.00 6708
e) Fabrication of Transformer railing & embedding in Transformer plinth. (As per KPTCL SR-2023-24 Labour, Page No-116, Sl.No-10,Rs-1626 Set 1 1626.00 1626
B.2 a) 33KV SF-6/ VCB Breakers: Breaker Erection, assembly, alignment & wiring of breakers with its connected equipments including movement from the point of unloading to the point of erection. (As per KPTCL SR-2023-24 Labour,Page No-117, Sl.No-13, Item No-(a) Rs-5934 Per Set 1 5934.00 5934
b) Assisting in Testing & Commissioning: (As per KPTCL SR-2023-24 Labour, Page No-117, Sl.No-13, Item No-(b) Rs-1938.00 Set 1 1938.00 1938
c) Wiring : Identification, Ferruling crimping and termination of wires in Breaker & Wiring up to control panel/Relay panels. (As per KPTCL SR-2023-24 Labour,Page No-117, Sl.No-13, Item No-(c) Rs-8487 Set 1 8487.00 8487
B.3 a) Control Panels : Erection of control panel, auxilary panel, carrier cabinet etc., alignment and fixing properly to foundation base including movement from the point of unloading to the point of erection.(As per KPTCL SR-2023-24 Labour,Page No-120, Sl.No-23, Item No-(a) Rs-4191) Nos. 2 4191.00 8382
b) Wiring & Assisting in Testing & Commissioning: (As per KPTCL SR-2023-24 Labour,Page No-120, Sl.No-23, Item No-(b) Rs-7612.00 Nos. 2 7612.00 15224
B.4 a) Erection of CTs and wiring including movement from the point of unloading to the point of erection. (As per KPTCL CSR 23-24, Labour, Page No: 118, Sl No.: 14 a) Rs-2199 Set (3 Nos) 2 2199.00 4398
b) Assisting in Testing & Commissioning: (As per KPTCL CSR 23-24, Labour, Page No: 118, Sl No.: 14 (b) Rs-768.00 Set (3 Nos) 2 768.00 1536
c) Welding work for alteration of existing PI mounting structure to errect the incomer Current Transformers (As per present market rates) No's 3 500.00 1500
B.5 a) Erection of NCTs including movement from the point of unloading to the point of erection with grounding connections (As perKPTCL CSR 23-24, Labour, Page No: 118, Sl No.:15(a) Rs-733.00 Set 1 733.00 733
b) Assisting in Testing & Commissioning:(As per KPTCL CSR 2023-24, Labour, Page No: 118, Sl No.:15(c) Rs-99.00 Set 1 99.00 99
B.7 a) Erection of Lightning arrestors and wiring including movement from the point of unloading to the point of erection (33 KV) (As per KPTCL CSR 23-24, Labour, page No119, Sl.No:18 )Rs.333/- Set 1 330 330
b) 9 KV, 5 KA class (Station type) (11kv) (As per ESCOMS SR 23-24, Labour, page No: 48 of 81, Sl.No:101, item no: 13.06) Rs-119.00 Set (3 Nos) 12 333.00 3996
B.8 1) 33 KV Isolators : 119.00 0
a) Erection of Isolators (33 KV) Assembly, Errection alignment and wiring including movement from the point of unloading to the point of erection.(Upright type),( As per KPTCL CSR 23-24, Labour, Pg No: 119, Sl No.: 17 A(i) ,) Rs-1319.00 ) Set 2 1319.00 2638
b) Assisting in Testing and Commissioning ( KPTCL CSR 23-24, Labour, Pg No:119 , Sl No.: 17 E(i) ,) Rs-191/- Nos 2 191.00 382
2) 11KV Isolators: 0
a) Erection of 400A, special roster switch with H-frame & clamps to be mounted on DP (As per ESCOM SR- 23-24, Labour, Pg No:48 of 81 Sl No.: 98 ,itme no:13.03 ) Rs-1214 Nos 4 1298.40 5194
b) Erection of 11 kV, 400 Amps Double Break GOS (As per ESCOM SR- 23-24, Labour, Pg No:48 of 81 Sl No.: 98 ,itme no:13.03 ) Rs-1214/- Nos 6 1298.40 7790
B.9 a) 11 KV Switchgear : Erection, alignment and fixing to the foundation, indoor/outdoor 11KV switchgear Panel/unit including movement from the point of unloading to the point of erection. (1Bank+4 feeders+1CB+1AP3) (As per KPTCL SR 23-24, Labour, page No: 121, Sl.No:24 a (i) ) Rs-2081/-) Per Panel 7 2081.00 14567
b) Wiring and assisting in Testing & Commissioning: (As per KPTCL SR 23-24, Labour, page No: 122, Sl.No:24 b (i) ) Rs-941.00 Per Panel. 7 941.00 6587
B.10 a) 33KV Station structures: 0 0
Erection, alignment & assembly of fabricated steel lattice structure, pedestal structures & Mounting structures, for 3T1 Tower ,3B1 Beam,G.O.S., CTs, PTs LAs, 11KVNCT, High P.I, etc. (As per KPTCL SR 23-24, Labour, Page No: 116, Sl No.: 8, (b) , Rs-5723.00 t 2.90 5723.00 16608 0.27
B.11 a) Bus Formation 0 0
Formation of cross bus in each individual bay using Lynx/Coyote -Single/Double conductor with fixing of insulators, spacers, levelling the strung conductors to the required height above the equipment including providing jumps to inter-connect different segments of the main bus. ( As per KPTCL SR 23-24, Labour, Page No: 122, Sl No.: 25) Rs-7364.00 (Incuding 33KV Bus Formation) Per bay 7 7364.00 51548
B.12 a) 11KV ODS: 0 0
1) Digging of Pit 1.8 Mtr depth (Hard Soil) for errection of 9Mtr 11KV ODS pole- ESCOMs Labour SR-23-24 Page No- 43 of 81 Sl.No-2 Item No-1.1.2 RS- 11322) Errection of 9 Mtr. Long, 145kg RCC pole for 11KV ODS.As per ESCOMs Labour SR-23-24 Page No- 44 of 81 Sl.No-29 Item No-2.01 RS-922 Total Rs-2054 Nos 12 2400 28800
b) 1) Digging of Pit 1.6 Mtr depth (Hard Soil) for erection of 7.5/8 Mtr Long Steel/RCC pole for LED Light ( As per ESCOMs Labour SR-23-24 Page No- 43 of 81 Sl.No-6 Item No-1.2.2 RS-1006 ) 2) Errection of RCC Pole - 8 Mtr Long, 115 Kg WL. (As per ESCOMs Labour SR-23-24 Page No- 44 of 81 Sl.No-29 Item No-2.01 RS-922 Total Rs-1928 Nos 5 2266 11328
c) Supplying and fixing angle iron frame work fabricated out of M.S. angle iron.. and M.S. Flat......with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint for 11 KV ODS mounting structure using 50 x 100 x 50 x 6 mm C channel MS, each 4.0 mtr long , As per PWD Electrical Page 19 Sl.No-5.41.4 Rs-Per Mtr-756.00 28NosX4Mtr=112 Mtr Mtr 220 756.00 166320 112
B.14 Erection of 2 Pole DP Structure using RCC/PSCC Pole 9 to 10 Mtr long As Per Escoms SR-2023-24 Page No-44 of 81, Sl.No-34, Item No-2.06 Rs-4134 Per Structure 4 4418 17674 1403 only dp 1341
B.15 Laying of control cables from equipments to control panels. 0
a) 19 Core 2.5 Sq.mm (As per KPTCL SR 23-24, Labour, page No: 120, Sl.No:22, (b) Rs- Per Mtr-15.00 Rmtr 681 15.00 10215
b) 4 Core 6 Sq.mm (As per KPTCL SR 23-24, Labour, page No: 120, Sl.No:22, (b) Rs- Per Mtr-15.00 Rmtr 578 15.00 8670
c) 4 core 2.5 Sq.mm (As per KPTCL SR 23-24, Labour, page No: 120, Sl.No:22, (b) Rs- Per Mtr-15.00 Rmtr 110 15.00 1650
d) 2 core 2.5 Sq.mm (As per KPTCL SR 23-24, Labour, page No: 120, Sl.No:22, (b) Rs- Per Mtr-15.00 Rmtr 450 15.00 6750
e) 14 core 2.5 Sq.mm (As per KPTCL SR 23-24, Labour, page No: 120, Sl.No:22, (b) Rs- Per Mtr-15.00 Rmtr 90 15.00 1350
B.16 11kV, 3 Core, XLPE HTUG Cable (ROUND Armoured Cable) 0
a) a) Cable trench excavation, 22x0.6x1=13.2, Ordinary soil (BESCOM SR-2023-24,Labour, Cost data sheet-23, Sl No- 11 (a) Rs:262.00) . Cmt 13.2 260 3430
b) Laying of cable in trench. (As per KPTCL SR- 2023-24, Page No- 42 of 50, SL.No-173) KM 0.150 70639 10596
c) Refilling and consolidation (BESCOM SR-2023-24,Labour Cost data sheet-23, Sl No- 11 (c) Rs:160, . Cmt 13.2 160.00 2112 40000
d) Heat Shrinkable Outdoor Type Cable Termination Kit for XLPE Cable 3X400 Sqmm ((BESCOM SR-2023-24,Labour , Cost data sheet-23 Sl.No-11(e) Rs:2658.00) . Per Kit 4 2658.00 10632
e) Covering the cable with tile (BESCOM SR-2023-24,Labour,Cost data sheet-23, Sl No- 11 (f) Rs:4367 KM 0.150 4669 700
f) Spreading Sand and forming with Sand round the Cable (BESCOM SR-2023-24,Labour,Cost data sheet-23, Sl No- 11 (g) Rs:14810 KM 0.150 15864 2380
g) Laying of GI Pipe (BESCOM SR-2023-24,Labour ,Cost data sheet-23, Sl No- 11 (i) Rs:93 Mtr 16 93 1488
h) Laying of Route and Joint indicating stone (As per ESCOM SR- 2023-24, Page No- 34 of 50, SL.No-2, 55 of 50, SL.No-258) Nos 10 124 1236
B.17 Miscellaneous items 0
a) Fixing Caution/Danger Boards ((As per KPTCL SR- 2023-24, Page No- 34 of 50, SL.No-2, 35 of 50, SL.No-30) Nos 4 85 341
b) Fixing Phase Plates As per KPTCL Labour SR 23-24,Pg No.113 ,Sl No.3(c) Rs-238 Set (3Nos) 3 238.00 714 71.5986
c) Fixing Name Plates for equipment/Earth Pit ,KPTCL SR 21-22, page No-09 of 27 Sl No-7 Item No:- (d), Labour Charge Rs.54 Nos 28 54.00 1512
d) Name plate for feeders and banks KPTCL SR 21-22 , Labour Charge No-09 of 27 Sl No-7, Item No:- (d),Rate Rs.54 Nos 7 54.00 378
B-18 Fixing halogen/metal halide /SVL/IL/LED floodlight fitting over existing pole / wall ceiling including clamps, bolts, nuts and wiring using suitable capacity wires. As per PWD Ele SR 2-2023-24 Page No-56 Of 105,Item No:13.5 Each 5 162.00 810
B-19 Unseen works like , Welding drilling Holes, Alteration of Angles/Sheets according to requirement, all lead & lifts .etc L/S 0 0 463942.096
Total cost 520800.47
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Providing additional 3rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Kallolli in Ghataprabha Taluk, Belagavi District in 33KV S&L Division, Belagavi on PTK basis (5 MVA Power Transformer and other allied materials will be supplied by departmentally)
PART-C-(CIVIL WORKS)
Sl No. Item Description Unit Qty Unit Price (Rs) Total Price (Rs)
C SCHEDULE OF ITEMS FOR ASSOCIATED CIVIL WORKS AND STRUCTURES:
C.1 Cable Trenches including road crossing :
a) RCC Cable duct for laying of control cables with cable tray.(Duct size:1 mtr WidthX 1 mtr DepthX85 Mtr Length including 33 KV and 11 KV side) Mtrs 85.00 7665.00 651525.00
b) b) Providing and Laying RCC Hume pipe sub ducts using NP 2 class 300mm dia Hume pipe including cost of Excavation, laying charges and back filling wherever required as per technical specification and enclosed drawings including cost of all materials, labour, etc., complete. Rmtrs 60.00 853.00 51180.00
c) Cable duct covers RCC made with suitable size to cover the duct length of 85 Mtrs ( of Size 1m x 1m x 0.15m) Nos 85.00 1694.00 143990.00
C.2 SITE SURFACING: Jelly Spreading (20-25 mm) : Supplying and providing jelly in the station yard of uniform thickness of 100 mm including the cost of materials, labour charges, required tools and plants etc., complete. Work shall be carried out as per the instructions of Engineer- in-charge of works as per the standard procedure(As per KPTCL SR 2023-24,Page No.158,Sl.No.1) Cmt 71.60 1773.00 126946.80 71.6 216
C.3 Foundations: Engineering, supply of all labour,material and construction of RCC footing including the cost of excavation, cement concreting, reinforcement, backfilling, waterproof cement painting, for all works, grouting underpinning etc ,for the following works 0.00 500
a) 9 mtrs long RCC poles for ODS (As per ESCOM's SR 2023-24,Base concreting Rs.312+Pole concreting Rs.3434,Coping Rs.312) No's 20 4058.00 81160.00 8116 716
b) 8 mtrs long RCC poles for station Yard lights (As per ESCOM's SR 2023-24,Base concreting Rs.312+Pole concreting Rs.1498+Coping Rs.312) No's 5 2112.00 10560.00 71.6
c) 33KV CT support structure (0.95 mtrX0.55 mtr X 1mtr Depth),with M-20 Concreting,PCC of M-10 and FE-550 TMT steel Nos 3 5650.00 16950.00
d) 33KV Surge arrestor support structure (0.95 mtrX0.55 mtr X 1mtr Depth),with M-20 Concreting,PCC of M-10 and FE-550 TMT steel Nos 3 5650.00 16950.00
e) PI support structure (0.95 mtrX0.55 mtr X 1mtr Depth),with M-20 Concreting,PCC of M-10 and FE-550 TMT steel Nos 15 5650.00 84750.00
f) 11 KV NCT mounting structure (0.95 mtrX0.55 mtr X 1mtr Depth),with M-20 Concreting,PCC of M-10 and FE-550 TMT steel Nos 1 5941.00 5941.00
g) 33KV Isolators support structure(0.95 mtr X 0.45 mtr X 1mtrDepth),with M-20 Concreting,PCC of M-10 and FE-550 TMT steel Set 1 5674.00 5674.00
h) PI support structure for raising the U.G cable (0.95 mtrX0.55 mtr X 1mtr Depth),with M-20 Concreting,PCC of M-10 and FE-550 TMT steel No. 1 5650.00 5650.00
i) 3T1 Tower Foundation with M-20 Concreting,PCC of M-10 and FE-550 TMT steel (1.2 m X 1.2 m x 2.5 m ) including excavation. Nos 2 35950.00 71900.00
C.4 Transformer foundation and associated rail track: 0.00
Design, Engineering,supply of material / equuipment, labour and construction of Tr. Foundation by providing all associated works, rail tracks jacking pads, anchor block RCC, PCC misscellanellaneous structural steel including MS, grouting gravel filling pylon support system and other items not mentioned herein, but required for the completion of the work as per the technical spcfication and drawings 0.00
a) 5 MVA, 33/11 KV Transformer (3.3 mtr Width X 3.3 mtr Length X 3 mtr Depth) Nos 1.00 307207.00 307207.00
C.5 a) SF-6 Breaker foundation, 33KV SF-6 Breaker foundation as per approved design and drawing including supply of material and labour Nos 1.00 26247.00 26247.00
C.6 Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For: 0.00 129.6
a) PVC pipes 63mm dia., 6 kg/sqcm & class 3 Mtrs 150.00 161.00 24150.00 5.7992
b) PVC pipes 75mm dia., 6 kg/sqcm & class 3 Mtrs 100.00 220.00 22000.00 118.5 9.345
C.7 a) Earth mat formation : 0.00
Excavation, formation, refilling. CMT 118.50 202.00 23937.00
C.8 a) Design, Engineering,supply of material / equuipment, labour and construction of 11 KV out door PCVCB foundation by providing all associated works as per standard and approved specification. No's 5.00 43226.00 216130.00
b) Design, Engineering,supply of material / equuipment, labour and construction of 11 KV out door Capacitor Bank cells foundation by providing all associated works as per standard and approved specification. Set 1.00 26620.00 26620.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Self-Declaration statement of Bidder/Contractor for works Done…as on date of Bid submission.
Note: Please fill all required data and upload the signed copy in e-procurrement portal.
Bid Indent No: HESCOM/2025-26/EL/WORK_INDENT1107 Format-I
Work done certificate details as per QR.
Sl.No. Year of Completion Name of the Department Work Done Certificate No.& Date. Work Done Certificate issued by (Executive Engineer, Superintending Engineer .,.etc.,) Station voltage Class (220kV, 110kV, 66kV, 33kV) Station Capacity (MVA) 33 KV Line in R.Kms 33KV ROC in R.Kms 11 KV & above in R.Kms Others Cost of the work/project Rs.in Lakhs
Note:Works completed during the period from (i.e.,2019-20, 2020-21,2021-22,2022-23 and 2023-24) shall only be furnished, others will not be accepted.
I/We hereby declare that I/We had carried out above works and completed in all respects and are in successful operation for the last 1 (One) year i.e.,as on date of Bid submission. Further notice for defects in executed works is not received from concerned Department/recieved and same have been attended within the time. Any information, if found to be incorrect, wrong, misleading or misrepresenting , I/We am/are aware that I/We may be held liable for it.
Tender Capacity Format
Details of work Executed during last 05 years ( To asses the value of A)
Sl No Year Work Executed Other related Electrical Works if any Cost of executed work in Rs Lakhs
New substations / Augmentation in Nos HT line in Rkms(11KV & above) DTC in Nos
Details of existing commitments and on-going works to be completed during next '13 months ( To asses the value of B) Attached in the next sheet
SL No Details of On Going works Award amount Rs in Lakhs Amount of work to be completed during next "13 months" Rs in Lakhs Completion period as per award Completion period remaining
Tender Capacity Formula= A*N*5-B
Where 'N'=13months of completion period for above subject work
Seal and signature of the Bidder
A= Maximum value of Distribution network work executed in any one year during the last 5 years i.e 2020-21,2021-22 ,2022-23,2023-24,2024-25 ( UP dated to __________________ price level) taking into account the completed as well as works in progress
N= Number of years/months prescribed for completion of the works for which Tenders are invited
B= Value,at________price level, of existing commitments and on-going works to be completed during the 'N'
Note: 1) The available tender capacity shall be more than the total tender value 2) Documentary Proof in support of value ‘A’, the Total value of works executed and payments received annually in the last 5 years shall be uploaded in the form of certificates issued by Chartered Accountant. In case if the same is not uploaded, then the maximum value of annual payments received towards the works executed which is indicated in the audited balance sheet in any one year during the last five years will be considered.
Tender Capacity Format
Details of existing commitments and on-going works to be completed during next "13 months ( To asses the value of B)
SL No Details of On Going works Award amount Rs in Lakhs Amount of work to be completed during next "13 months" Rs in Lakhs Completion period as per award Completion period remaining
Where 'N'= 13 months of completion period for above subject work
Note: The statement showing the value of existing commitments and ongoing works as well as the stipulated period of completion remaining for each of the works listed shall be countersigned by the Employer in charge, not below the rank of Executive Engineer or equivalent.( Note: L-1 in any of the recently called tender amount is also be considered as value of B along with the above)
Seal and signature of the Executive Engineer(Ele)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
2 section 1 IFB 1107.doc
Others - 2 section 1 IFB 1107 • 1.41 MB
15 KPTCL Cicrcular insurance surety bond.pdf
Others - 15 KPTCL Cicrcular insurance surety bond • 1.59 MB
7 Annexures 1107.doc
Others - 7 Annexures 1107 • 0.16 MB
8 technical specification 1107.doc
Others - 8 technical specification 1107 • 0.58 MB
12 Advisory NOte.pdf
Others - 12 Advisory NOte • 0.67 MB
6 section v SCC INDENT 1107.doc
Others - 6 section v SCC INDENT 1107 • 0.11 MB
4 section iii GCC INDENT 1107.doc
Others - GCC • 0.14 MB
11 Kallolli 3rd 5MVA Final Indent 1107.xlsx
Others - estimate • 0.94 MB
10 work done.xls
Others - 10 work done • 0.03 MB
14 Stamp Duty Circular.pdf
Others - 14 Stamp Duty Circular • 0.09 MB
3 section ii ITB 1107.doc
Others - 3 section ii ITB 1107 • 0.11 MB
9 tender capacity.xlsx
Others - 9 tender capacity • 0.02 MB
13 FD417EXP Circular.pdf
Others - 13 FD417EXP Circular • 0.12 MB
1 NIT INDENT 1107.doc
Others - 1 NIT INDENT 1107 • 0.14 MB
5 section iv ECC INDENT 1107.doc
Others - 5 section iv ECC INDENT 1107 • 0.09 MB
Amendment PV.pdf
pdf • 0.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .