| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAdmitted-Finance UTTAR PRADESH UP | ₹8.2 L | L1 | Admitted-Finance |
| 2 | L2₹8.8 LAdmitted-Finance | ₹8.8 L | L2 | Admitted-Finance |
| 3 | L3₹9.2 LAdmitted-Finance | ₹9.2 L | L3 | Admitted-Finance |
| 4 | L4₹9.5 LAdmitted-Finance | ₹9.5 L | L4 | Admitted-Finance |
| 5 | L5₹10.5 LAdmitted-Finance | ₹10.5 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BABALU CONSTRUCTION L6 | Shiv Prasad L4 | M/S NIRMALA RAI CONTRACTOR L1 | UDBHAV CONSTRUCTIONS AND SUPPLIERS L2 | MANJU L3 | SANTOSH KUMAR L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation of foundation in kankar & Bajari, mixed soil including initial lead & lift with all cost of labour T&P etc with proper completion of work as per direction of Engineer-in-charge | 40.73 | Cum | 95 ₹3,868.88 | 82.35 ₹3,353.70 | 97 ₹3,950.33 | 74 ₹3,013.65 | 95 ₹3,868.88 | 75.03 ₹3,055.60 |
| 2.00 | Sand filling in foundation and under floor including all cost of material laour T&P etc. all complete. | 38.92 | Cum | 2,000 ₹77,842 | 1,901.76 ₹74,018.40 | 370 ₹14,400.77 | 1,759 ₹68,462.04 | 1,200 ₹46,705.20 | 2,199 ₹85,587.28 |
| 3.00 | Laying C.C. in 1:3:6 in foundation & floor with coarse sand & 25 mm to 50 mm stone ballast including cost of all material labour T&P etc.alll complete. | 58.73 | Cum | 5,100 ₹3.0 L | 4,358.77 ₹2.6 L | 5,700 ₹3.3 L | 4,024 ₹2.4 L | 4,200 ₹2.5 L | 5,027 ₹3.0 L |
| 4.00 | 1st class brick work in 1:6 CM with coarse sand including all cost of material labour t&p etc. all complete. | 51.25 | Cum | 7,200 ₹3.7 L | 6,333.54 ₹3.2 L | 5,200 ₹2.7 L | 5,851 ₹3.0 L | 6,600 ₹3.4 L | 7,013 ₹3.6 L |
| 5.00 | R.C.C. in 1:2:4 with 10 to 20 mm stone grite and course sand including cost of all material labour T&P etc. all complete. | 3.27 | Cum | 7,000 ₹22,897 | 5,993.94 ₹19,606.18 | 7,000 ₹22,897 | 5,533 ₹18,098.44 | 6,600 ₹21,588.60 | 6,957 ₹22,756.35 |
| 6.00 | Steel reinforecement for R.C.C. work including cutting bending & placing with cost of all material labour T&P etc. all complete. | 0.25 | MT | 70,000 ₹17,430 | 61,128 ₹15,220.87 | 60,000 ₹14,940 | 56,448 ₹14,055.55 | 70,000 ₹17,430 | 71,000 ₹17,679 |
| 7.00 | Centering and shuttering for R.C.C. work including all cost of material, labour t&p all complete. | 29.69 | Sqm | 400 ₹11,874.80 | 357.43 ₹10,611.02 | 350 ₹10,390.45 | 329 ₹9,767.02 | 300 ₹8,906.10 | 381 ₹11,310.75 |
| 8.00 | 12 MM thick cement plaster in 1:4 CM with coarse sand including all cost of material, labour t&p etc. all complete. | 493.79 | Sqm | 170 ₹83,944.98 | 146.88 ₹72,528.46 | 125 ₹61,724.25 | 134 ₹66,168.40 | 160 ₹79,007.04 | 161 ₹79,500.83 |
| 9.00 | 40 mm thick C.C. in 1:2:4 flooring with 4.75 mm to 10 mm stone grite and course sand including cost of all material labour T&P etc. all complete. | 337.94 | Sqm | 400 ₹1.4 L | 346.39 ₹1.2 L | 150 ₹50,691.60 | 322 ₹1.1 L | 300 ₹1.0 L | 341 ₹1.2 L |
| 10.00 | Supplying and fixing of window gril including cost of all material labour T&P etc. all complete. | 118.8 | Kgs | 160 ₹19,008 | 141.78 ₹16,843.46 | 150 ₹17,820 | 131 ₹15,562.80 | 150 ₹17,820 | 146 ₹17,344.80 |
Tender Value
Refer Docs
EMD Value
₹23,000
Closing Date
15 Jan 2026, 2:00 pmClosed
EE K.C.P.D-4, DUDDHI
EE KANHAR CANAL PROJECT DIVISION 4, DUDDHI SONEBHADRA
Construction of Kachnarwa store outer wall with sleeper and construction of chaukidar room at Kachnarwa
2025_UPIDC_1102628_5
03/EE/2025-26
Open Tender
Civil Works
120 days
Duddhi Sonebhadra
Please refer tender documents
2 documents required · 2 mandatory
₹944
₹23,000
5 May 2026
2 Jan 2026
16 Jan 2026
2 Jan 2026
15 Jan 2026
2 Jan 2026
Earth work excavation of foundation in kankar & Bajari, mixed soil including initial lead & lift with all cost of labour T&P etc with proper completion of work as per direction of Engineer-in-charge
Sand filling in foundation and under floor including all cost of material laour T&P etc. all complete.
Laying C.C. in 1:3:6 in foundation & floor with coarse sand & 25 mm to 50 mm stone ballast including cost of all material labour T&P etc.alll complete.
1st class brick work in 1:6 CM with coarse sand including all cost of material labour t&p etc. all complete.
R.C.C. in 1:2:4 with 10 to 20 mm stone grite and course sand including cost of all material labour T&P etc. all complete.
Steel reinforecement for R.C.C. work including cutting bending & placing with cost of all material labour T&P etc. all complete.
Centering and shuttering for R.C.C. work including all cost of material, labour t&p all complete.
12 MM thick cement plaster in 1:4 CM with coarse sand including all cost of material, labour t&p etc. all complete.
40 mm thick C.C. in 1:2:4 flooring with 4.75 mm to 10 mm stone grite and course sand including cost of all material labour T&P etc. all complete.
Supplying and fixing of window gril including cost of all material labour T&P etc. all complete.
Supplying and fixing of door chaukhat 50x50x5 mm angle including cost of all material labour T&P etc.all complete.
Supplying and fixing of 35 mm thick plywood door shutter including cost of all material labour T&P etc.all complete.
Supplying and fixing of mosquito proof jali with Sheesham wood batten around the jali including cost of batten, nail, screw etc. required for proper completeion of work.
Distempering two coat of oil bound distemper with one coat primer on new surface including all cost of material, labour, T&P with preparation of surface all complete
Two coat synthetic enamel paint on iron and wood work including cost of all material labour T&P etc. all complete.
Earth work in filling for protection of ground around chaukidar/guard room lead up to 1.0 Km by tractor trolly with proper laying, dressing and manual compaction required for proper completion of work as per direction of Engineer-in-charge.
Engaging Beldar/Labour for jungle clearance and preparation site with cleaning after work through Shramik Mukhiya
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
DocL2.pdf
Tender Documents • 2.91 MB
BOQ_2035285.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid