Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.2 LAccepted-AOC | L1 | Accepted-AOC Due to L1 | |
| 2 | L2₹31.9 L+₹1.9 L (6.46%)Rejected-Finance ROWRIAH KB ROAD PO CHALIHA JORHAT 785004 ASSAM | JORHAT | JORHAT | ASSAM | 785004 | L2 | Rejected-Finance Quoted rate more than L1 | |
| 3 | L3₹32.7 L+₹2.7 L (9.13%)Rejected-Finance | L3 | Rejected-Finance Quoted rate more than L1 | |
| 4 | L4₹33.3 L+₹3.3 L (11.2%)Rejected-Finance | L4 | Rejected-Finance Quoted rate more than L1 | |
| 5 | L5₹33.6 L+₹3.6 L (12.0%)Rejected-Finance | L5 | Rejected-Finance Quoted rate more than L1 |
| Sl No | Description | Qty | Unit | M/S DHAR AND DHAR L2 | M/S PAUL CONSTRUCTION L6 | MS J B CONSTRUCTION AND CO L5 | A M CHOUDHURY AND CO L7 | MD ABIDUR ALI L4 | M/S D J ENTERPRISE L1 | M/S GOPAL ROY AND CO L8 | M/S DILIP GOSWAMI L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00NOTE:- (i) The bidders/contractors are advised to read tender document & all corrigendum / amendments and General conditions of contracts before entrying/quoting the rates. (ii) It is highlighted that the certain condition of General Condition of Contracts (IAFW-2249) has been modified as per direction of MoD i.e. inclusssion of Performance Security, deletion of Risk & Cost Provisions and increase in defect liability period all as per tender documents. The tenderers should keep in mind while quoting their offer. (iii) (Applicable for all items/parts):- The bidders/contractors are advised to refer Notes on BOQ/SCH'A' before entry/quoting the rates. | |||||||||||
| 2.00 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quions, arches, pillers etc complete all as specified and as directed. | 30 | Cum | 625 ₹18,750 | 688 ₹20,640 | 686 ₹20,580 | 680 ₹20,400 | 685 ₹20,550 | 620 ₹18,600 Lowest | 683 ₹20,490 | 682 ₹20,460 |
| 3.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed. | 250 | Sqm | 35 ₹8,750 | 70 ₹17,500 | 65 ₹16,250 | 50 ₹12,500 | 60 ₹15,000 | 30 ₹7,500 Lowest | 60 ₹15,000 | 63 ₹15,750 |
| 4.00 | Taking down cement plaster of any description built in cement mortar on brick or stone walls etc including racking out joints, hacking for Key, scrubbing down with water etc. complete all as specified and as directed. | 195 | Sqm | 30 ₹5,850 | 47 ₹9,165 | 48 ₹9,360 | 30 ₹5,850 | 45 ₹8,775 | 25 ₹4,875 Lowest | 44 ₹8,580 | 48 ₹9,360 |
| 5.00 | Demolition of cement concrete (reinforced) of any description and any position not otherwise specifically provided for (reinforcement cut as required to facilitate demolition) and removal of rubbish from the site complete all as specified and as directed. | 7.5 | Cum | 655 ₹4,912.5 | 697 ₹5,227.5 | 699 ₹5,242.5 | 690 ₹5,175 | 695 ₹5,212.5 | 650 ₹4,875 Lowest | 700 ₹5,250 | 696 ₹5,220 |
| 6.00 | Demolition of cement concrete (unreinforced) in ground floors and paving not exceeding 15cm thick (below or above ground level) and removal of rubbish from the site complete all as specified and as directed. | 83 | Cum | 655 ₹54,365 | 697 ₹57,851 | 699 ₹58,017 | 695 ₹57,685 | 695 ₹57,685 | 650 ₹53,950 Lowest | 710 ₹58,930 | 696 ₹57,768 |
| 7.00 | Demolition and breaking up drain pipes (Salt glazed stone ware, AC or reinforced concrete) of internal dia 150mm set in cement mortar and removing unserviceable materials from site of work complete all as specified and as directed. | 270 | RM | 55 ₹14,850 | 74 ₹19,980 | 75 ₹20,250 | 55 ₹14,850 | 70 ₹18,900 | 50 ₹13,500 Lowest | 68 ₹18,360 | 58 ₹15,660 |
| 8.00 | Excavation in trenches not exceeding 1.50m wide and not exceeding 1.50m in depth for foundations or for shafts, wells, cesspits, manholes, pier holes etc. not exceeding 10Sqm on plan and not exceeding 1.50m in depth and getting out in soft/loose soil complete all as specified and as directed. | 135.3 | Cum | 195 ₹26,383.5 | 210 ₹28,413 | 209 ₹28,277.7 | 265 ₹35,854.5 | 210 ₹28,413 | 190 ₹25,707 Lowest | 300 ₹40,590 | 204 ₹27,601.2 |
| 9.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm on soft/loose soil complete all as specified and as directed. | 37.26 | Cum | 95 ₹3,539.7 | 115 ₹4,284.9 | 110 ₹4,098.6 | 110 ₹4,098.6 | 105 ₹3,912.3 | 90 ₹3,353.4 Lowest | 105 ₹3,912.3 | 97 ₹3,614.22 |
| 10.00 | Removing excavated materials not exceeding 50 m and depositing where directed at a level not exceeding 1.5 m above the starting point complete all as specified and as directed. | 98.04 | Cum | 145 ₹14,215.8 | 152 ₹14,902.08 | 148 ₹14,509.92 | 155 ₹15,196.2 | 150 ₹14,706 | 135 ₹13,235.4 Lowest | 250 ₹24,510 | 148 ₹14,509.92 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
22 Jun 2026, 6:00 pmClosed
GARRISON ENGINEER JORHAT
GARRISON ENGINEER JORHAT
CLEANING OF SEWER LINE, SEPTIC TANK, SOKAGE WELL, REPAIR / REPLACEMENT OF BROKEN, DAMAGE SEWER LINE, SEPTIC TANK, SOAKAGE WELL AT ROWRIAH, SARAIBARI AND BHALUKMARA UNDER GE JORHAT.
2026_MES_768336_1
8330/GE/E8
Open Tender
Civil Works - Others
Item Rate
180 days
GE JORHAT
As Per NIT
7 documents required · 7 mandatory
₹500
GARRISON ENGINEER JORHAT
₹60,000
Yes
9 Aug 2026
1 Jun 2026
24 Jun 2026
1 Jun 2026
22 Jun 2026
15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quions, arches, pillers etc complete all as specified and as directed. | 30 | Cum | - | - |
| 3 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed. | 250 | Sqm | - | - |
| 4 | Taking down cement plaster of any description built in cement mortar on brick or stone walls etc including racking out joints, hacking for Key, scrubbing down with water etc. complete all as specified and as directed. | 195 | Sqm | - | - |
| 5 | Demolition of cement concrete (reinforced) of any description and any position not otherwise specifically provided for (reinforcement cut as required to facilitate demolition) and removal of rubbish from the site complete all as specified and as directed. | 7.5 | Cum | - | - |
| 6 | Demolition of cement concrete (unreinforced) in ground floors and paving not exceeding 15cm thick (below or above ground level) and removal of rubbish from the site complete all as specified and as directed. | - | Cum | - | - |
| 7 | Demolition and breaking up drain pipes (Salt glazed stone ware, AC or reinforced concrete) of internal dia 150mm set in cement mortar and removing unserviceable materials from site of work complete all as specified and as directed. | 270 | RM | - | - |
| 8 | Excavation in trenches not exceeding 1.50m wide and not exceeding 1.50m in depth for foundations or for shafts, wells, cesspits, manholes, pier holes etc. not exceeding 10Sqm on plan and not exceeding 1.50m in depth and getting out in soft/loose soil complete all as specified and as directed. | 135.3 | Cum | - | - |
| 9 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm on soft/loose soil complete all as specified and as directed. | 37.26 | Cum | - | - |
| 10 | Removing excavated materials not exceeding 50 m and depositing where directed at a level not exceeding 1.5 m above the starting point complete all as specified and as directed. | 98.04 | Cum | - | - |
| 11 | Material and labour for providing cement concrete 1:4:8 type D-2 (using 40 mm graded crushed stone aggregate) as in foundation, filling and mass concreting complete all as specified and as directed. | 7.25 | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
Tender_8330_1_CONTENT_TO_NOTE_8330.pdf
Tender Documents • 0.67 MB
Tender_8330_2_General_Condition_8330.pdf
Tender Documents • 0.78 MB
Tender_8330_3_Spl_Con_8330.pdf
Tender Documents • 0.37 MB
Tender_8330_4_PS_8330.pdf
Tender Documents • 1.34 MB
BOQ_860435.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .