Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical HOSHIARPUR | HOSHIARPUR | PUNJAB | Accepted-Technical Responsive |
Tender Value
₹23.5 L
EMD Value
₹47,000
Closing Date
9 Apr 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer Construction Division No 1 PWD b and R Br Hoshiarpur
Construction of AAC at Village Ghorewaha Block Tanda Distt Hoshiarpur
2026_CEPW_165104_1
Construction of AAC at Village Ghorewaha Block Tanda Distt Hoshiarpur
Open Tender
Civil Works - Buildings
Percentage
30 days
Hoshiarpur
Please refer Tender documents.
11 documents required · 11 mandatory
₹5,000
₹47,000
Yes
22 Apr 2026
1 Apr 2026
9 Apr 2026
1 Apr 2026
9 Apr 2026
1 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS
Dismantling Floor tiles (to be carefully removed).(CSR 8.35) | - | Sqm | - | - |
| 2 | Dismantling of cement Concrete
Cement concrete plain 1:4:8 or 1:5:10 (CSR 8.6 b) | - | Cum | - | - |
| 3 | Scraping of Cement Plaster (CSR 8.31 c) | - | Sqm | - | - |
| 4 | Dismantling brick or flagged stone flooring
including concrete base. (CSR 8.18) | - | Cum | - | - |
| 5 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.(CSR 6.6) | - | Cum | - | - |
| 6 | Cement concrete 1:5:10 mixing by mechanical means using concrete
mixer volumetric type. (CSR 10.9 a (ii)) | - | Cum | - | - |
| 7 | First class burnt brick work laid in cement sand mortar 1:5 in foundation and plinth (CSR 11.5) | - | Cum | - | - |
| 8 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. (CSR 10.15) | - | Cum | - | - |
| 9 | Damp proof course 2.5cm thick of cement concrete 1:2:4 with 2 coats of bitumen 20/30 penetration at 1.65 Kg per sqm laid hot and sanded. (CSR 10.28) | - | Sqm | - | - |
| 10 | Shuttering for faces of concrete foundations and foundation beam & plinth beamb (vertical or battering). (CSR 9.1) | - | Sqm | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.48 MB
TN1.pdf
Tender Documents • 1.00 MB
BOQ_334830.xls
BOQ • 0.49 MB
Conditions.pdf
Tender Documents • 23.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .