| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹92.2 LAccepted-AOC VPO DODA SHRI MUKATSAR SAHIB | ₹92.2 L | L1 | Accepted-AOC Lowest Quoted Amount as a single bidder |
Tender Value
₹92.2 L
EMD Value
₹1.9 L
Closing Date
18 May 2026, 12:00 pmClosed
DSCO Keshav Kumar
Opposite Aggarwal Hospital, Kishanpura Road, Sangrur
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV, Construction of Haudies and all other allied works.
2026_DOA_165612_4
DSWC/SAN/2025-2026/36
Open Tender
Pipe Laying Works
Percentage
365 days
Sangrur
Please refer tender documents.
3 documents required · 3 mandatory
₹2,000
₹1.9 L
30 Aug 2026
11 May 2026
18 May 2026
11 May 2026
18 May 2026
11 May 2026
FINANCIAL BID NO.: DSWC/SAN/2025-2026/36
Rates for Civil Works (Approved by CCS Punjab Chandigarh)
Name of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs.
Quoted by Contractor (As % less of Estimated Amount) Quote (+/-%)
Note: Please quote only figure (upto 2 decimal points) in above blue colour box in minus or plus. Do not put %age sign after this figure. Please check Quoted Rate in Next cell.
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 500 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Fatehgarh Channa (C/o 9300/TR Extension) Tehsil-Sangrur, District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 378.94 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 215 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 86 /Joints 297.57 Rupees Two Hundred Seven and Fifty Seven Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (500 mm) 1 /Cut hole 127 One Hundred Five Rupees And Zero Paisa Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 1 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 500 mm) 1 /Riser & Valve 893.82 Seven Hundred One Rupees And One Paisa Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) 1 /Air pipe 287.37 Two Hundred Eighty Four Rupees And Ninety Paisa Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Cost of Other Items
Nimar for jointing the pipe 18.16 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 33.23 Ton 209.86 One Hundred Seventy Two Rupees And Ninety Four Paisa Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Harkisanpura(C/o 29350/R ) Tehsil-Bhawanigarh, District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 10287.31 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 6706 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 2682 /Joints 208.05 Rupees Two Hundred Eight and Five Paise Only
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (400mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 10 /Meter 2777.03 Two Thousand Seven Hundered Seventy Seven Rupees and Three Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 42 /Cut hole 105 One Hundred Five Rupees And Zero Paisa Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 32 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 400 mm) 42 /Riser & Valve 704.59 Seven Hundred Four Rupees And Fifty Nine Paisa Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) 32 /Air pipe 285.73 Two Hundred Eighty Five Rupees And Seventy Three Paisa Only
Fixing of pump stand with C.C 1:2:4 (1000 mm) 1 /pump stand 2402 Two Thousand Four Hundred Two Rupees Only
Fixing of Gate valves with C.C 1:2:4 (400 mm) 15 /Gate Valve 2042.5 Two Thousand Forty Two Rupees And Fifty Paisa Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
B.B.C 1:8:16 0.6 cum 3892.16 Three Thousand Eight Hundred Ninety Two Rupees And Sixteen Paise Only
Plain Cement Concrete 1:2:4 0.14 cum 5156 Five Thousand One Hundered Fifty Six Rupees Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5033.13 Five Thousand Thirty Three Rupees And Ninety Thirteen Paisa Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.89 Two Hundred Two Rupees And Eighty Nine Paisa Only
RCC Slab 1:2:4 0.21 cum 8200 Eight Thousand Two Hundred Rupees Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for Thirteen Haudis
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Three Thousand Only
Nimar for jointing the pipe 370.171 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 659.776 Ton 172.94 One Hundred Seventy Two Rupees And Ninety Four Paisa Only
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 450 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village Bhawanigarh And Balial (C/o 53250/L), Tehsil-Bhawanigarh and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 2334.5 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1450 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 580 /Joints 234 Rupees Two Hundred Thirty Four Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (450 mm) 14 /Cut hole 116 Rupees One hundered Sixteen Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 8 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (450mm) 14 /Riser & Valve 760.8 Rupees Seven Hundred Sixty and Fifty Eighty Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 8 /Air pipe 284.1 Rupees Two Hundred Eighty Four and Ten Paise Only
Fixing of gatevalve(450mm) 3 /Air pipe 2159.3 Rupees Two Thousand One Hundred Fifty Nine and Thirty Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
B.B.C 1:8:16 0.6 cum 3848.69 Rupees Three Thousand Eight Hundred Forty Eight And Sixty Nine Paise Only
Plain Cement Concrete 1:2:4 0.14 cum 5045.4 Rupees Five Thousand Forty Five and Forty Paise Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5037.12 Rupees Five Thousand Thirty Seven and Twelve Paise Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.97 Rupees Two Hundred Two and Ninety Seven Paise Only
RCC Slab 1:2:4 0.21 cum 8147.08 Rupees Eight Thousand One Hundred Forty Seven And Eight Paise Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for Two Haudis
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Four Thousand Only
Nimar for jointing the pipe 88.856 Per kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 174.926 per tonnes 172.94 Rupees One Hundred Seventy Two and Ninty Four paise only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Naraingarh,Kahangarh,Talwandi Malak(C/o 2873/L) Tehsil-Bhawanigarh, District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 10918.93 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 7225 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 2890 /Joints 208.16 Rupees Two Hundred Eight and Sixteen Paise Only
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (400mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 40 /Meter 2777.03 Two Thousand Seven Hundered Seventy Seven Rupees and Three Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 52 /Cut hole 105 One Hundred Five Rupees And Zero Paisa Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 33 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 400 mm) 52 /Riser & Valve 706.29 Seven Hundred Six Rupees And Twenty Nine Paisa Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) 33 /Air pipe 287.46 Two Hundred Eighty Seven Rupees And Forty Six Paisa Only
Fixing of pump stand with C.C 1:2:4 (1000 mm) 4 /pump stand 2412.23 Two Thousand Three Hundred Ninety Rupees And Twenty Six Paisa Only
Fixing of Gate valves with C.C 1:2:4 (400 mm) 18 /Gate Valve 2049.9 Two Thousand Forty Nine Rupees And Ninety Paisa Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
B.B.C 1:8:16 0.6 cum 3892.16 Three Thousand Eight Hundred Ninety Two Rupees And Sixteen Paise Only
Plain Cement Concrete 1:2:4 0.14 cum 5156 Five Thousand One Hundered Fifty Six Rupees Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5035.98 Five Thousand Thirty Five Rupees And Ninety Eight Paisa Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.89 Two Hundred Two Rupees And Eighty Nine Paisa Only
RCC Slab 1:2:4 0.21 cum 8200 Eight Thousand Two Hundred Rupees Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for Twenty Haudis
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Three Thousand Only
Nimar for jointing the pipe 398.82 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 711.504 Ton 172.94 One Hundred Seventy Two Rupees And Ninety Four Paisa Only
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 300 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village -Rampura (C/o 65000/R), Tehsil Bhawanigarh and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 7321.08 /Cum 93.78 Rupees Ninty Three Ans Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 6422 /Mtrs 84 Rupee Eighty Four Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 2569 /Joints 116.65 Rupees One Hundred Sixteen And Sixty Five Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (300 mm) 60 /Cut hole 75 Rupees Seventy Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 36 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 /Riser & Valve 484.23 Rupees Four Hundred Eighty and twenty three Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 /Air pipe 285.6 Rupees Two Hundred Eighty five and sixty Paise Only
Fixing of pump stand(900mm) 12 /pump stand 6582.91 Rupees six thousand five hundred eighty two and ninty one paise only
Fixing of gatevalve 18 /Valve 1451.15 Rupees one thousand four hundred fifty one and fifteen paise only
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Four Thousand Only
Nimar for jointing the pipe 201.33 Per kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less)as per CSR 2020 Item No- 5.2 (13 b,c,d) 356.063 Per Ton 160.3 Rupees one hundred sixty and thirty paise Only
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 300 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village -Basiark (C/o 53400/l), Tehsil Bhawanigarh and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 3847.5 /Cum 93.78 Rupees ninty three and seventy eight paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 3375 /Mtrs 84 Rupee eighty four Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 10 /Mtrs 1355.85 Rupee one thousand three hundred fifty five and eighty five paise only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 116.97 Rupees one Hundred sixteen and ninty seven Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (300 mm) 25 /Cut hole 75 Rupees seventy five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 9 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 /Riser & Valve 487.41 Rupees four Hundred eighty seven and fourty one Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 /Air pipe 287.59 Rupees Two Hundred Eighty seven and fifty nine Paise Only
Fixing of pump stand(900mm) 9 /pump stand 6627.17 Rupees six thousand six hundred twenty seven and seventeen paise
Fixing of gatevalve 8 /Valve 1454.33 Rupees one thousand four hundred fifty four and thirty three paise only
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Four Thousand Only
Nimar for jointing the pipe 105.84 Per kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less)as per CSR 2020 Item No- 5.2 (13 b,c,d) 186.731 Per Ton 160.3 Rupees one hundred sixty and thirty paise Only
Grand Total (A+B+C+D+E+F)
Credit of Damaged lined water channel existing on site to be deducted from the bill of Agency 0
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
NITUGPL252636.pdf
Tender Documents • 0.50 MB
DNITUGPL252636.pdf
Tender Documents • 1.18 MB
FBUGPL252636.xls
Additional Documents • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .