| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 LAccepted-Finance | ₹17.0 L | L1 | Accepted-Finance BOQ Rate accepted |
| 2 | L2₹17.8 LAccepted-Finance | ₹17.8 L | L2 | Accepted-Finance BOQ Rate accepted |
| Sl No | Description | Qty | Unit | UDAYAPPA ENTERPRISES | MSC ENTERPRISES |
|---|---|---|---|---|---|
| 1.00 | Providing two legged scaffolding for works above 3m height, using 13 to 15 cm dia casuarina props to a distance between the two rows are being 1.25m and the spacing of posts being 2m in both the rows with horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to stepup and providing a platform with country wood planks of 40mm thick and 1m width etc., including cost of all materials, labours, lead, lift, safety measures, etc. complete. | 80.7 | Rm | 1,68,824.4 ₹2.0 L | 1,61,157.9 ₹1.9 L |
| 2.00 | Providing wooden platform with scaffolding arrangements using 10 to 13cm dia. Casurina posts and 40mm thick country wood planks for providing platform over the scaffolding including cost of all material, lead, lift, etc., complete. | 32.8 | M2 | 10,430.4 ₹12,307.87 | 9,971.2 ₹11,766.02 |
| 3.00 | Dismantling the existing damaged RCC for the required width & depth as per the instructions of engineer in charge and disposing the debris 1km away from the site including cost of all materials, labours, lead, lift. curing, etc. complete. | 8.3 | M3 | 44,712.1 ₹52,760.28 | 42,678.6 ₹50,360.75 |
| 4.00 | Chipping the existing floor & wall concrete and roughening the surface for future bonding and through cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete. | 55.2 | M2 | 2,760 ₹3,256.80 | 2,649.6 ₹3,126.53 |
| 5.00 | Clean removal of cracked cement plaster from walls including cost of all materials, labour, lead, lift, curing, etc., complete. | 81.2 | M2 | 812 ₹958.16 | 812 ₹958.16 |
| 6.00 | Dismantling the damaged Terrace tiles and disposed away from the site as directed by the engineer in charge including cost of labour, Lead, lift, T&P etc., complete. | 127.8 | M2 | 7,284.6 ₹8,595.83 | 6,901.2 ₹8,143.42 |
| 7.00 | Chipping the damaged tiles including cost of labour for dismantling and disposed away from the site lead lift etc., complete. | 1.5 | M2 | 117 ₹138.06 | 112.5 ₹132.75 |
| 8.00 | Providing centering and shuttering using steel structures & props 10 to 13cm dia, including cost of all materials, labours, lead, lift, etc. complete | 69.2 | M2 | 83,109.2 ₹98,068.86 | 79,372.4 ₹93,659.43 |
| 9.00 | Providing RCC 1:11/2:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 4.8 | M3 | 52,555.2 ₹62,015.14 | 50,169.6 ₹59,200.13 |
| 10.00 | Supplying & providing RTS/MS rod including cutting, bending, tying and fixing in position as per specification including binding wires, cost of all materials, labours, lead, lift, etc. complete. | 384 | Kg | 39,552 ₹46,671.36 | 37,632 ₹44,405.76 |
Tender Value
Refer Docs
EMD Value
₹14,200
Closing Date
25 Feb 2026, 2:00 pmClosed
Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS
Repair and Maintenance Works to the Inner Rooms in Type 2 Quarters Block No. 17 and 18 at Analmin Nagar
2026_EB_660552_1
CE SE C TTPS Spec.No. 400 25 26
Open Tender
Civil Works - Others
90 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,200
Yes
2 Mar 2026
18 Feb 2026
26 Feb 2026
18 Feb 2026
25 Feb 2026
18 Feb 2026
Providing two legged scaffolding for works above 3m height, using 13 to 15 cm dia casuarina props to a distance between the two rows are being 1.25m and the spacing of posts being 2m in both the rows with horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to stepup and providing a platform with country wood planks of 40mm thick and 1m width etc., including cost of all materials, labours, lead, lift, safety measures, etc. complete.
Providing wooden platform with scaffolding arrangements using 10 to 13cm dia. Casurina posts and 40mm thick country wood planks for providing platform over the scaffolding including cost of all material, lead, lift, etc., complete.
Dismantling the existing damaged RCC for the required width & depth as per the instructions of engineer in charge and disposing the debris 1km away from the site including cost of all materials, labours, lead, lift. curing, etc. complete.
Chipping the existing floor & wall concrete and roughening the surface for future bonding and through cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete.
Clean removal of cracked cement plaster from walls including cost of all materials, labour, lead, lift, curing, etc., complete.
Dismantling the damaged Terrace tiles and disposed away from the site as directed by the engineer in charge including cost of labour, Lead, lift, T&P etc., complete.
Chipping the damaged tiles including cost of labour for dismantling and disposed away from the site lead lift etc., complete.
Providing centering and shuttering using steel structures & props 10 to 13cm dia, including cost of all materials, labours, lead, lift, etc. complete
Providing RCC 1:11/2:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work.
Supplying & providing RTS/MS rod including cutting, bending, tying and fixing in position as per specification including binding wires, cost of all materials, labours, lead, lift, etc. complete.
Supplying and fabricating and forming in position of the new angle, channel & beam as directed carefully without any disturbance to other steel structure rate including cost of all materials, hire charges for welding and cutting machine, welding rods including labour, lead, lift, safety appliances etc., complete.
Supplying and fixing Cuddapah slab for fixing over the water tank roof slab including cost of all materials, labour, lead, lift etc., complete.
Providing PCC 1:4:8 using OP/PP cement with 12 to 20 mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete.
Supply and fixing floor tiles of first quality design ceramic tiles of approved colours in CM 1:3, 20mm thick and pointing with white cement 0.4 Kg/Sqm including cost of tiles, labour, lead, lift, etc., complete.
Supplying and fixing of precast jolly, rate including cost of all materials, labour, lead, lift, etc, complete.
Supplying and fixing of wooden Windows shutters with country wood outer frame of size 100x75mm and the shutter frame 75x50mm with plywood shutters 12mm thick and 5mm thick glass including cost of all materials, labour lead, lift, etc., complete.
Providing Terrace tiles of single 230 x 230 x 20mm tiles using CM 1:3, mixed with crude oil 1% by weight of cement and pointing with same oiled mortar etc, including cost of all materials, lead, labours, lift curing etc., complete.
Brick work in CM 1:5 using fly ash bricks (230 x 110 x 70mm) including cost of all materials, Labours, lead, curing, etc. complete
Plastering with CM 1:3, 12mm thick for concrete surface including cost of all materials, labour, lead, lift, curing etc. complete.
Plastering with CM 1:5, 20mm thick for brick wall surface including cost of all materials, labours, lead, lift, curing, etc., complete.
Applying one coat of white wash with white cement to the newly plastered surface, including cost of all materials, labours, lead, lift, scaffolding, curing, etc., complete
Painting old wall surface with two coat of ready mixed plastic emulsion paint (interior walls) of first class quality paint and approved colour over a priming coat including cost of all materials, scaffolding charges, thorough cleaning of surface, labours, lead, lift, curing, etc., complete.
Painting old wall surface with two coat of Asian make exterior paint (or) equivalent over the existing wall surface with priming coat including cost of all materials, scaffolding charges, thorough cleaning of surface, labours, lead, lift, curing, etc., complete.
Painting two coats with ready mixed enamel paint for the old wooden doors,windows including cost of all materials, through cleaning of surface, labours, lead, lift curing, etc. complete.
Providing and fixing steel door of required size with single leaf, frame using 30 x 30 x 5mm M.S.angle shutters with 30 x 20 x 3mm M.S.angle and flat 4 x 5mm for door stiffner center porotion 20 x 5mm for shutter stiffner horizontal and 16 x 5mm for door stiffner outer vertical and horizontal with 2mm thick M.S.Sheet both sides made with 2 no. tower bolt, 1 no. aldrop, 2 no handles, 3 nos. hinges with cost of all materials labour, lead, lift etc., complete including two coats of approved quality enamel paint over the one coat of red oxide primer.
Supplying and fixing in position of PVC door of approved quality and colour with 25mm thick PVC shutter including cost of all specials, materials, labour, lead, lift etc., complete.
Replacing the Indian water closet of size 580 x 440mm white glazed earthware with 'P' trap with sand cushion and forming flooring alround the water closet using 20mm brick jelly in lime concrete and plastering with CM 1:3, 20mm thick including cost of all materials, labour, lead, lift, etc., complete.
Supplying and fixing 6Kg/cm2 PVC pipe for sanitary arrangements of approved quality size of 110mm dia and 75mm dia including cost of specials, all other materials required labour, lead, lift, etc., complete. a) 110 mm dia PVC pipe
b) 75 mm dia PVC pipe
Supplying laying and jointing in position of 15mm, 20mm, 25mm and 32mm dia GI pipes ('B' Class) as instructed by the site Engineer rate, inclduing cost of all materials, labour, lead, lift, with necessary scaffolding etc., complete. a) 15mm dia GI Pipe
20mm dia GI Pipe
25mm dia GI Pipe
32mm dia GI Pipe
Supplying and fixing GM Wheel valve of approved quality including cost of all materials, labour, lead, lift etc., complete a) 32mm Wheel valve
b) 25mm Wheel valve
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_792523.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid