| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.8 LAccepted-AOC 213 SRI KRISHNA NAGAR BRAHMRSI CHOWK AURANGABAD SRI KRISHNA NAGAR AURANGABAD BIHAR 824101 | AURANGABAD | BIHAR | 824101 | 1 | Accepted-AOC Accepted as L1 bidder and awarded value is including GST and round figure value of 1384511.72 | |
| 2 | Rejected-Technical | - | Rejected-Technical Rejected as L2 bidder. | |
| 3 | Rejected-Technical | - | Rejected-Technical Rejected as L4 bidder. | |
| 4 | Rejected-Technical MADHYA PRADESH | UMARIA | MADHYA PRADESH | 484001 | - | Rejected-Technical Rejected as L3 bidder. |
| Sl No | Description | Qty | Unit | RAMANUJ KUMAR L1 | M/S ABDUL KALAM L2 | SINGH CONSTRUCTION AND SUPPLIER L3 | M/S ANANYA CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|
| 1.00Malma Cleaning of UK Bottom Drift, Roof bolting and whitewashing, proposed depillaring UK Bottom Seam of Bhadra 7&8 UG Mine, Bhadra Sub-Area, Jamuna Kotma Area. (FOR ITEM NO.1 TO 2.8) | |||||||
| 1.10 | Drilling, blasting, mucking cleaning manually in drifting & stacking the same within 50 M lead (i) Drilling by hand (Drift Side wall) | 112.5 | CuM | 1,800 ₹2,02,500 Lowest | 1,959 ₹2,20,387.5 | 2,029 ₹2,28,262.5 | 2,309 ₹2,59,762.5 |
| 1.20 | Dressing (Drift Rodwey) Dressing | 11.11 | Face | 180 ₹1,999.8 Lowest | 196 ₹2,177.56 | 203 ₹2,255.33 | 231.77 ₹2,574.96 |
| 1.30 | Malma cleaning, Removal of debris Manually from UK Bottom Drift and stacking lead 50 Mtr | 518 | CuM | 277 ₹1,43,486 Lowest | 297 ₹1,53,846 | 308 ₹1,59,544 | 350.84 ₹1,81,735.12 |
| 1.40 | (Girder Support) Groove cutting for stopping and manhole by chisel/pickaxe and hammer in. A) Hard Stone (Incline No 8 to UK Bottom Drift) | 1.62 | CuM | 3,400 ₹5,508 Lowest | 3,662 ₹5,932.44 | 3,793 ₹6,144.66 | 4,316.86 ₹6,993.31 |
| 1.50 | PCC work in UG including cenering shuttering etc. complete ratio 1:2:4 | 1.62 | CuM | 1,700 ₹2,754 Lowest | 1,872 ₹3,032.64 | 1,938 ₹3,139.56 | 2,206.39 ₹3,574.35 |
| 1.60 | A. Brick masonary in lime/cement 1:6 Mixed (a) Upto height of 1.5m | 16.2 | CuM | 2,200 ₹35,640 Lowest | 2,276 ₹36,871.2 | 2,358 ₹38,199.6 | 2,683.45 ₹43,471.89 |
| 1.70 | B. Brick masonary in lime/cement 1:6 Mixed b) Height from 1.5m to 3.0m & above in U/G | 10.8 | CuM | 2,200 ₹23,760 Lowest | 2,477 ₹26,751.6 | 2,566 ₹27,712.8 | 2,920.22 ₹31,538.38 |
| 1.80 | 12 mm Thick cement/lime plastring ratio of 1:6 | 75 | SQM | 200 ₹15,000 Lowest | 234 ₹17,550 | 242 ₹18,150 | 275.8 ₹20,685 |
| 1.90 | (Girder Support) Transportation/Carriage of steel structure by manualy labour including loading, unloading & stacking the same for lead up to Mtr. Underground | 2.62 | MT | 350 ₹917 Lowest | 360 ₹943.2 | 372 ₹974.64 | 424.3 ₹1,111.67 |
Tender Value
₹26.5 L
EMD Value
₹33,200
Closing Date
11 Aug 2025, 1:00 pmClosed
General Manager(Oprn.), JK Area
Office of The General Manager(Oprn.), JK Area, P.O-Jamuna Colliery, Dist. Anuppur (MP), Pin-484444, SECL, Bilaspur BILASPUR
Malma Cleaning of UK Bottom Drift, Roof bolting and whitewashing, proposed depillaring, Cleaning of return airway and clearing of roof fall occurred in 4D and 5D galleries of U.K. Bottom at Bhadra 7/8 Mine.
2025_SECL_340498_1
SECL/JK/GM(O)/25-26/eT/19 Date 30.07.2025
Open Tender
Miscellaneous Works
Item Rate
120 days
Bhadra 7and8 Mine, JK Area
AS PER NIT
4 documents required · 4 mandatory
₹33,200
23 Sept 2025
30 Jul 2025
12 Aug 2025
30 Jul 2025
11 Aug 2025
31 Jul 2025
31 Jul 2025 - 4 Aug 2025
Amount
Malma Cleaning of UK Bottom Drift, Roof bolting and whitewashing, proposed depillaring UK Bottom Seam of Bhadra 7&8 UG Mine, Bhadra Sub-Area, Jamuna Kotma Area. (FOR ITEM NO.1 TO 2.8)
Drilling, blasting, mucking cleaning manually in drifting & stacking the same within 50 M lead (i) Drilling by hand (Drift Side wall)
Dressing (Drift Rodwey) Dressing
Malma cleaning, Removal of debris Manually from UK Bottom Drift and stacking lead 50 Mtr
(Girder Support) Groove cutting for stopping and manhole by chisel/pickaxe and hammer in. A) Hard Stone (Incline No 8 to UK Bottom Drift)
PCC work in UG including cenering shuttering etc. complete ratio 1:2:4
A. Brick masonary in lime/cement 1:6 Mixed (a) Upto height of 1.5m
B. Brick masonary in lime/cement 1:6 Mixed b) Height from 1.5m to 3.0m & above in U/G
12 mm Thick cement/lime plastring ratio of 1:6
(Girder Support) Transportation/Carriage of steel structure by manualy labour including loading, unloading & stacking the same for lead up to Mtr. Underground
Hiring of DGMS approved portable hydraulic roof bolting machine suitable with wet drilling arrangement drill 1.8m long hole in roof with 27mm dia drill bit for anchoring 20/22mm dia roof bolt with resin capsule, fitting of bearing plates, tightening of nuts and anchorage testing of nuts and anchorage testing of 10% of bolts. B. With hiring of Drilling Machine and accessories =(normal drilling cost+machine charges) = (244.49+17.36) = 261.85
White washing with Material
PCC work in Loading of all kinds of building material in to mine tub at incline mouth
PCC work in Loading of building material at destination in U.G
Material cost for PCC WORK
Cement
Metal Chips
Bricks
For Return airway cleaning of U.K Bottom seam proposed depillaring panel of bhadra 7 & 8 Ug Mine.(FOR SI.NO.2.9 TO 4.3)
Roof Drilling & Blasting
Carrying of Explosives & assisting blasting operation
dressing (Drift Rodway) Dressing
Malama cleaning, Removal of debris Manually from UK Bottom Air Shofrout & Drift and stacking lead 50 Mtr
(Girder Support) Groove cutting for stopping and manhole by chisel/pickaxe and hammer in. A) Hard Stone (Incline No 8 to UK Bottom Drift)
PCC work in UG including centering shuttering etc. complete ratio 1:2:4
(Girder Support) Transportation/Carriage of steel structure by manual labour including loading, unloading & stacking the same for lead up to 50 Mtr. Underground
PCC work in Loading of all kinds of building material in to mine tub at incline mouth
PCC work in Un-loading of all kinds of building material at destination in U.G.
Transportation of material with timming & pushing, Coupling & uncoupling with haulage for a distance every 201 to 250 Ft. and bringing the empty tubs ft lift & Tub Pushing for Miners and Loader
Material cost for PCC WORK
Cement
Metal Chips
Clearing of roof fall occurred in 4D and 5D galleries of U.K. Bottom Seam by outsourcing to secure & maintain two access galleries in safe and accessible condition in Bhadra 7&8 Mine, JK Area.(FOR SI.NO.4.4 TO 4.5)
Malma cleaning, removal of debris from galleries and stacking manual labour within 50m lead
Total impact of GST for the purpose of CTC
M/S ABDUL KALAM (BID ID -1173875)
SINGH CONSTRUCTION AND SUPPLIER (BID ID -1174348)
M/S ANANYA CONSTRUCTION (BID ID -1174461)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .