Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹30.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹30.9 L+₹27,893.34 (0.91%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹32.7 L+₹2.1 L (6.85%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹35.1 L+₹4.5 L (14.7%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹35.3 L+₹4.7 L (15.4%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹45.0 L
EMD Value
₹89,980
Closing Date
18 Dec 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Wildlife Warden Wetland Division Hokersar Srinagar
Office of the Wildlife Warden Wetlands Division Hokersar Srinagar, Kashmir, Jammu and Kashmir PIN-190012
Construction of MAC Control Room at Beerwah, Budgam.
2025_FD_296649_1
E-NIT No. 08 OF 2025-26 Dated 26/11/2025
Open Tender
Civil Works
Percentage
270 days
Beerwah
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹89,980
24 Jan 2026
28 Nov 2025
22 Dec 2025
28 Nov 2025
18 Dec 2025
28 Nov 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : | 71.87 | cum | 187.3 | ₹13,461.25 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 11.77 | cum | 218.4 | ₹2,570.57 |
| 3 | Supplying and filling of RBM in plinth incl. spreading, dressing,watering with all carrriage etc complete | 25.2 | cum | 850 | ₹21,420 |
| 4 | P/L of stone soling incl. ramming,hand packing and all carriages, complete job in geocell,trenches,foundation etc. | 14.82 | cum | 1,300 | ₹19,266 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) Mud mat | 7.41 | cum | 5,202.9 | ₹38,553.49 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 12.01 | cum | 7,788.4 | ₹93,538.68 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 34.11 | cum | 7,104.35 | ₹2,42,329.38 |
| 8 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. | 15.9 | cum | 5,536.55 | ₹88,031.15 |
| 9 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 1.72 | cum | 6,591.25 | ₹11,336.95 |
| 10 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.57 | cum | 9,395.7 | ₹5,355.55 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Tendernotice_1.pdf
Tender Document • 0.64 MB
BOQ_961241.xls
BOQ • 0.44 MB
BOQ_961241.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .