Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹96.0 LAdmitted-Finance SHOP NO 6 TAPADIYA CENTRE MARKET TOWN CENTRE CIDCO AURANGABAD | AURANGABAD | AURANGABAD | MAHARASHTRA | -3.95% | ₹96.0 L | L1 | Admitted-Finance |
| 2 | L2₹100.0 LAdmitted-Finance PLOT NO 22 A SWASTISHRIRAJYABHISHEK SHAKE 350 RAMKRUSHNA GODAVARI HOUSING CO OPERATIVE SOCIETY RAMGOPALNAGAR PADEGAON TAL DIST CHHATRAPATI SAMBHAJINAGAR | AURANGABAD | MAHARASHTRA | 423701 | -0.01% | ₹100.0 L | L2 | Admitted-Finance |
| 3 | L3₹1.0 CrAdmitted-Finance | +1.01% | ₹1.0 Cr | L3 | Admitted-Finance |
Tender Value
₹100.0 L
EMD Value
₹1 L
Closing Date
9 May 2026, 5:00 pmClosed
EE W Z.P. Hingoli
EE W Z.P. Hingoli
Improvement of Road SH 258 to Goregaon to Hatala road KM 3/00 to 5/200 Tq. Sengaon
2026_HINGO_1294916_1
EEW/HING/Open/09/2026-27
Open Tender
Civil Works
150 days
Sengaon
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹1 L
25 May 2026
15 Apr 2026
11 May 2026
15 Apr 2026
9 May 2026
15 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. 2.09 | - | SqM | - | - | BI01010001010000000000000515BI0100001112 |
| 2 | Providing earth work in embankment with approved materials obtained from departmental land upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller to achieve not less than 97 % of standard proctor density etc. complete.(Material obtained from departmental Land) ( Item No. 2.27) | - | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 3 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. ( Item No.2.18) | - | Cum | - | - | BI01010001010000000000000515BI0100001114 |
| 4 | Watering and compacting of embankment formed of materials obtained from the road cutting within a lead of 50 m, not less than 97% of standard Proctor density after laying them in layers of 20 cm. to 30 cm. with Power roller.(Item No. 2.24) | - | Cum | - | - | BI01010001010000000000000515BI0100001115 |
| 5 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking Boulders (Hand broken).( ItemNo. 50.56) | - | Cum | - | - | BI01010001010000000000000515BI0100001116 |
| 6 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)40 mm Metal, By breaking Boulders (Hand broken) ( Item No. 50.57) | - | Cum | - | - | BI01010001010000000000000515BI0100001117 |
| 7 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. Item No.2.29a | - | CuM | - | - | BI01010001010000000000000515BI0100001118 |
| 8 | Supplying soft murum at the road site, including conveying and stacking complete. ,Item No.2.29b | - | CuM | - | - | BI01010001010000000000000515BI0100001119 |
| 9 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . (Item No. 50.58) | - | Cum | - | - | BI01010001010000000000000515BI0100001120 |
| 10 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete. ,Item No.2.30 | - | Cum | - | - | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
B1doc.pdf
Tender Documents • 0.82 MB
BOQ_2224997.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid