Loading…
Loading…
Tender Value
₹27.4 L
EMD Value
₹2.7 L
Closing Date
5 Sept 2026, 5:00 pm
Sachiv Shiyana
Sachiv Shiyana
01 - Sarkari Ganna Vikas Samiti Ltd - Syana ke karyalya Prangan ki Boundrywall ka Nav - Nirman ka karya.
2026_CDSI_1180068_1
178/C Dt. 20-08-2026 (Shiyana)
Open Tender
Miscellaneous Works
Percentage
180 days
Shiyana
Tender Fee, EMD and Other Documents as per Tender Document/NIT
2 documents required · 2 mandatory
₹1,354
Sachiv Sahkari Ganna Vikas Samiti Ltd
₹2.7 L
27 Aug 2026
27 Aug 2026
7 Sept 2026
27 Aug 2026
5 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. | 134.32 | CUM | 186.9 | ₹25,104.41 |
| - | Providing and laying in cement concrete 1:4:8 (1 cement : 4 coarse sand :8 graded Stone aggregate 40 mm nominal size) and curing complete,including cost of form- work, in foundation and floors. | 15.49 | CUM | 4,889.8 | ₹75,743 |
| - | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3(1 cement : 1.5 coarse sand : 3 stone aggregates) in lighter beams i.e. having spans upto 6 m. excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. strength of the concrete shall not beless than (M-20) | 10.56 | CUM | 6,493.3 | ₹68,569.25 |
| - | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chaijjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).Lintel Band | 5.28 | CUM | 6,478.5 | ₹34,206.48 |
| - | As in item 3 above but in R.C.C. columns in 1:1.5:3 having strength not less than [1 cement :1.5 coarse sand :3 stone aggregate] M-20 | 6.51 | CUM | 6,493.3 | ₹42,271.38 |
| - | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 15.54 | CUM | 7,790.6 | ₹1,21,065.92 |
| - | As in item 3 above but in R.C.C. Work in footing / foundation and footing with approved stone ballast.(Using 1:1.5:3 Mix concrete) [1 cement :1.5 coarse sand :3 stone aggregate] M-20 | 27.5 | CUM | 6,493.3 | ₹1,78,565.75 |
| - | TMT Fe-500 or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. | 68.42 | QTL. | 7,741.7 | ₹5,29,687.11 |
| - | M-150 brick work in 1:6 (one cement and four coarse sand of 2.25 fineness modulus) mortar in foundation & plinth including supply of all materials, labour and T & P etc required for proper completion of the work. | 48.18 | CUM | 5,119.7 | ₹2,46,667.15 |
| - | M-150 brick work in 1:4 cement and coarse sand of 2.25 coarseness modulus mortar in super-structure. Above plinth level up to floor two level (up to two storey) including necessary cutting and molding of brick work as required and also including honey combed brick work in thickness of wall 12cms. | 93.19 | CUM | 6,536.5 | ₹6,09,136.43 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
Tendernotice_2.pdf
PDF • 4.86 MB
BOQ_2219089.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].