Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹68.2 LAccepted-AOC | L-1 | Accepted-AOC Lowest Bidder |
Tender Value
₹47.4 L
EMD Value
₹94,800
Closing Date
29 Dec 2021, 3:00 pmClosed
EE PHED Tosham
EE PHED Tosham
Sagwan village augmentation and renovation under JJM
2021_HRY_198205_2
No. 15732 dt. 01/12/2021
Open Tender
Civil Works
Works
Sagwan
Sagwan village augmentation and renovation under JJM
2 documents required · 2 mandatory
₹5,000
₹94,800
Yes
13 Jun 2022
22 Dec 2021
29 Dec 2021
22 Dec 2021
29 Dec 2021
22 Dec 2021
22 Dec 2021 - 29 Dec 2021
Amount
Supply, erection, testing and commissioning of wall mounted electrical I.T. Panel board, fabricated from 16 SWG CRCA sheet duly slouted with suitable angle iron frame work and completed powder coated of approximate size 1200x900 mm and 400mm deep having following items :- at water works For raw water pump set 2300 LPM x 30 mtr. Head x 30 HP = 2 Nos pump set (one for two pump set) (A) Main Switch 100 AMp. 1 No. (L&T Siemens, ABB) (B) VOlt Meter 100x100mm range 0 t 500 volt =1 No. (AE/KAPPA/L&T) (D) CT 100/3 No. (AE/KAPPA/L&T) (E) VSS & ASS 1 No. each No. of approved make (F) SSP 4 Nos of approved make/minilac (G) Motor starter star delta 1 No. for 2300 LPM x 30 Mtr Head x 30 HP (L&T, Siemens, ABB) (H) Capacitor KVAR as per site requirement (I) Indicating Lamp One Set (J) Change over switch 200 AMp. = 1 No
Supply, erection, testing and commissioning of Horizontal motor pumping set for raw water having head 30.00 Meter as per the indicated requirement of discharge in LPM and power capacity in BHP make KSB, CRI, Kirloskar, Crompton, Greeve, Lubi) 2300 LPM 30 Mtr Head
Operation and maintenance for the complete scope of work mention in the DNIT (Disinfection material supplied by the PHED) as per schedule-IV for a period of 5year after 12 months during defect liability period 3 Months trial run (will be charged to the A/Mtc. estimate (Operation and maintenance during defect liability period (operation only)
Operation and maintenance during 1st year after defect liability
Operation and maintenance during 2nd year
Operation and maintenance during 3rd year
Operation and maintenance during 4th year
Operation and maintenance during 5th year
Bidder Name
Amount
ravinder sangwan contractor(GSTN-NA)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .