Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹24.2 LAdmitted-Finance | -2.00% | ₹24.2 L | L1 | Admitted-Finance |
| 2 | L2₹24.5 L+₹36,737.50 (1.52%)Admitted-Finance | -0.51% | ₹24.5 L+₹36,737.50 (1.52%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 4 | Not Admitted-Fee/PreQual/Technical 00 PRAKASH CO SHIV BLOCK COLONY BABUGARH VIKAS NAGAR DEHRADUN UTTARAKHAND 248198 | DEHRADUN | UTTARAKHAND | 248198 | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹24.6 L
EMD Value
₹49,300
Closing Date
8 Aug 2026, 6:00 pmClosed
EO
Nagar Palika Mandawari
Repair work on drains gutters at various locations within the municipal area of Mandawari.
2026_DLB_579272_1
NPM/20226/55-4
Open Tender
Civil Works
Percentage
90 days
Mandawari
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MD RISL
₹49,300
Yes
15 Aug 2026
29 Jul 2026
10 Aug 2026
29 Jul 2026
8 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. includingdressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation anddisposal of surplus excavated material at a lead upto 50m suitablesite as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt,clay, black cotton soil, kankar, etcDepth upto 1.5 m | 300 | Cum | 229.5 | ₹68,850 |
| 2 | Dismantling of existing structures like culverts, bridges, retainingwalls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the smantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer Cement Concrete Grade M-15 and above and PCC blocks | 100.8 | Cum | 678 | ₹68,342.4 |
| 3 | Carriage of Materials by mechanical transport including loading, unloading and stackingSand, bazri, ballast, kankar etc | 320 | Cum | 209.35 | ₹66,992 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size).. | 36 | Cum | 4,575 | ₹1,64,700 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 150 | Cum | 5,910 | ₹8,86,500 |
| 6 | Brick work with FPS bricks of class designation 75 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 50 | Cum | 5,400 | ₹2,70,000 |
| 7 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : mix :1:6 (1 cement : 6 fine/ coarse sand) | 480 | sqm | 213.5 | ₹1,02,480 |
| 8 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete. L & s qty | 1,260 | sqm | 236.5 | ₹2,97,990 |
| 9 | Providing and fixing stone slab covering of required size over drains including filling of joints with cement sand mortar 1:3 complete as per direction of Engineer-in-charge Average thickness 40 to 50 mm | 24 | sqm | 402.5 | ₹9,660 |
| 10 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 340 | kg | 144.5 | ₹49,130 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_1029391.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .