Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-Finance MIHINPURWA BAHRAICH | BAHRAICH | UTTAR PRADESH | 271801 | L1 | Accepted-Finance Accept | |
| 2 | L2₹1.9 L+₹5,000 (2.63%)Accepted-Finance | L2 | Accepted-Finance Accept | |
| 3 | L3₹2.0 L+₹9,000 (4.74%)Accepted-Finance | L3 | Accepted-Finance Accept |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
19 May 2022, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
SE, ETC-II, PANKI, KANPUR.
FOR PRELIMINARY SURVEY OF PROPOSED 400 KV D/C BADAUN-FARRUKHABAD LINE AND 220 KV D/C FARRUKHABAD(400)-TIRWA LINES UNDER ETD-FATEHGARH.
2022_UPTCL_694756_2
E-Tender No.03/ETC-II(K)/2022-23
Open Tender
Electrical Works
Lump-sum
30 days
Fatehgarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
Executive Engineer ETD-II Kanpur
₹4,000
19 May 2022
10 May 2022
19 May 2022
10 May 2022
19 May 2022
10 May 2022
120 days
Amount
Route survey on topo sheet with GPS co-ordinates, Section length (AP to AP), crossings (Power line, NH, Railway, River, forest) Kmz file and tower quantity a. 400 KV, Badaun-Farrukhabad line- 95 Km. b. 220 KV Farrukhabad(400)-Tirwa line- 65 Km. Total line length- 160.00 Km.
Pre River crossing proposal
NSDZ POWER CONSTRUCTION
M/s SHOMA CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .