Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94.3 LAccepted-AOC 2 138 MUTHALIYAR STREET VADAKKUPATTU AMODR TIRUVALLUR | TIRUVALLUR | TIRUVALLUR | TAMIL NADU | 601204 | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.0 Cr+₹9.3 L (9.88%)Rejected-Finance | L2 | Rejected-Finance Above Estimate Rate |
Tender Value
₹96.2 L
EMD Value
₹97,000
Closing Date
18 Jul 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director, DRDA, Sivagangai
DRDA, Sivagangai
K.Pudupatti-R.Palakurichi Road
2023_RDTN_334911_1
MGSMT_22_23_SPUDUR_PACK_219
Open Tender
Civil Works - Roads
Item Rate
180 days
Sivagangai
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹97,000
11 Aug 2023
3 Jul 2023
18 Jul 2023
3 Jul 2023
18 Jul 2023
3 Jul 2023
Amount
Picking the damaged BT surface including all cutting etc., complete
Clearing the Scrub jungle including all labour charges for burrying and burning etc..
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20.A
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BC 25mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Construction of1.50m slab culvert @ 5M
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost of conveyance all materials of all labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., 6 complete.
Supplying and fabricating and placing inposition mild steel or Ribbed Tor steel for all reinforcedCement Concrete works as per the design given including cost of steel and binding wire in all floor etc., complete 7 complying with std specification. The bind
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete
Reinforced Cement Concrete 1:1 1/2:3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance 9 of all materials to site for Deck Slab
refilling behind the abutment
Construction of1.50m slab culvert @ 1140M
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost of conveyance all materials of all labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., 6 complete.
Supplying and fabricating and placing inposition mild steel or Ribbed Tor steel for all reinforcedCement Concrete works as per the design given including cost of steel and binding wire in all floor etc., complete 7 complying with std specification. The bind
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete
Reinforced Cement Concrete 1:1 1/2:3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance 9 of all materials to site for Deck Slab
refilling behind the abutment
Construction of Toe wall @ km 0/146-0/181
Earthwork excavation and depositing on bank with initial lead and list in all classes of solls except hard rock reg. blasting etc.,complete as per SS 20B for foundation
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Supplying and erecting centering shuttering including necessary supports for plane
Cement concrete 1:3:6 mix using 40mm ISS metal including cost of conveyance all materials of all labour charges etc., complete.
Supply & Fixing of 100mm Dia PVC pipei for weep holes
provisision for 60 cm Equilateral riangle cautionary sing board
Provision for Road Marker/ Road stud with lens Reflector
Supply & fixing of KM stone
Supply & fixing of HM stone
Maintenance of the road
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
V CHANDRAN
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .