Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.5 L+₹5,631.75 (0.59%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Bidder Not submitted all pre qualificaton documents and responsive. Hence, Price Bid may be Not Approved. |
Tender Value
₹9.6 L
EMD Value
₹9,640
Closing Date
22 Apr 2025, 3:00 pmClosed
Block Development Officer(VP), Kadathur
Block Development Officer(VP), Kadathur
Providing CC Road to Burial Ground at Nadur (Approach Road (147 x 3m)) H/O Puliyampatti
2025_RDTN_542893_1
Roc.No.4077/2024/E2 P07-AGAMT-II-2025-26
Open Tender
Civil Works
Item Rate
90 days
Block Development Office, Kadathur
Can be seen in the Tender Documents
2 documents required · 2 mandatory
₹0
₹9,640
30 May 2025
10 Apr 2025
22 Apr 2025
10 Apr 2025
22 Apr 2025
10 Apr 2025
Amount
Providing CC Road to Burial Ground at Nadur (Approach Road (147m*3m) H/O Puliyamaptti
1. Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary as per SS 20 B
2. Cement concrete 1:4:8 mix using 40mm size HBG metal including cost and conveyance of all materials to site labour charges for laying consolidation curing etc.
3. Supplying and filling in foundation, basement, ete with filling M.Sand in layers of not 3 more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
4. Supply and erecting of Steel Centering Charges inclusive of all material and labour charges etc., complete as per standard specification. BGL
5. Cement concrete 1:3:6 mix using 20mm size HBG metal including cost and conveyance of all materials to site labour charges for laying consolidation curing etc.
6. Cement concrete 1:2:4 mix using 20mm size HBG metal including cost and conveyance of all materials to site labour charges for laying consolidation curing etc.
7. Supply and Fixing of 160mm PVC Pipe including cost and conveyance of all materials to site labour charges for laying consolidation curing etc.
8. Supply and Fixing of Bitumen Pad including cost and conveyance of all materials to site labour charges for laying consolidation curing etc.
9. Provision for Name Board Charges
10. Provision for QC Charges 0.50%
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
P.CHINNASAMY CONTRACTOR (BID ID -1308028)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .