| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.7 LAccepted-AOC | ₹6.7 L | 1 | Accepted-AOC L-1 |
| 2 | 2₹6.8 LRejected-Finance 12 GAUTAM BHAVAN NEAR BY COMPLEX IN FRONT OFF FOOTBALL GROUND SANJAY NAGAR ANUPPUR MADHYA PRADESH 484120 | ANUPPUR | MADHYA PRADESH | 484120 | ₹6.8 L | 2 | Rejected-Finance L-2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical NIT conditions not fulfilled No Turnover No Bid Capacity can be calculated No Receipt/Certificate U.P Electronics Corporation |
| Sl No | Description | Qty | Unit | M/S GAUTAM ENTERPRISES L2 | M/S DINESH CHANDRA TOMAR THEKEDAR L1 |
|---|---|---|---|---|---|
| 1.00 | Earth Work in excavation of foundation in dry soil. including lift up to 1.5m and lead up to 30m. and including back filling watering ramming and dressing of excavated earth in to the trenches or in to the space between or in to the plinth with removal and disposal of surplus earth as directed by Engineer in charge etc. complete | 60.7 | CUM | 75 ₹4,552.5 | 70 ₹4,249 Lowest |
| 2.00 | Plain Cement Concrete 1:3:6 in cement coarse sand and stone grit foundation including all labour, material T&P etc. | 9.8 | CUM | 5,900 ₹57,820 Lowest | 5,900 ₹57,820 Lowest |
| 3.00 | Class - 150 ( Non modular ) brick work in 1:3 cement and coarse sand of FM not less than 1.25 mortar in foundation including supply of all material, labour and T&P etc. required for proper completion of the work. | 49.2 | CUM | 5,700 ₹2,80,440 | 5,500 ₹2,70,600 Lowest |
| 4.00 | Reinforced Cement Concrete work for Super structure of M20 (1:1.5:3) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc but excluding supply of reinforcement and its bending and including its fixing and binding the same with 24 BWGI binding wire and including necessasary centering and shuttering. required for proper completion of the work. | 17.6 | CUM | 7,600 ₹1,33,760 | 7,400 ₹1,30,240 Lowest |
| 5.00 | Centring&Shuttering For R.C.C Work I/C All Cost Of Labour T&P etc Complete For Proper Completion Of Work | 34.15 | SQM | 1,000 ₹34,150 Lowest | 1,000 ₹34,150 Lowest |
| 6.00 | Supplying and laying TMT Steel bar reinforcement as per approved drawing, including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the work. | 1.02 | MT | 78,000 ₹79,560 Lowest | 78,200 ₹79,764 |
| 7.00 | Struck Pointing With Cement Mortar Consisting of 1:2 (Cement:Fine Sand of 1.25 Finenes Modulus On Brick Work Including Supply Of all Materials Labour And Completion Of Work. | 52.2 | SQM | 115 ₹6,003 Lowest | 115 ₹6,003 Lowest |
| 8.00 | Supplying & Fixing 100 mm dia PVC Drainage Pipe i/c all cost of material, T&P etc for Proper complition of work. | 2 | RM | 160 ₹320 Lowest | 160 ₹320 Lowest |
| 9.00 | S/F Tarfelt on Abutment cap i/c all cost of materials, T&P etc for proper completion of work. | 4.9 | SQM | 190 ₹931 Lowest | 190 ₹931 Lowest |
| 10.00 | Providing of Expansion Joint including cost of all labour, materials, T&P etc. Complete. | 12.4 | RM | 1,850 ₹22,940 Lowest | 1,850 ₹22,940 Lowest |
Tender Value
₹7.1 L
EMD Value
₹15,000
Closing Date
6 Jul 2026, 5:00 pmClosed
EXECUTIVE ENGINEER MGCCD 12 ALIGARH
DODHPUR CIVIL LINES ALIGARH
CONSTRUCTION OF VRB AT KM 1.300 OF PAHADPUR MINOR
2026_UPIDC_1160265_9
04/EE/2026-27
Open Tender
Civil Works - Bridges
Item Rate
45 days
MORADABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹561
₹15,000
21 Aug 2026
29 Jun 2026
7 Jul 2026
29 Jun 2026
6 Jul 2026
29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in excavation of foundation in dry soil. including lift up to 1.5m and lead up to 30m. and including back filling watering ramming and dressing of excavated earth in to the trenches or in to the space between or in to the plinth with removal and disposal of surplus earth as directed by Engineer in charge etc. complete | 60.7 | CUM | - | - |
| 2 | Plain Cement Concrete 1:3:6 in cement coarse sand and stone grit foundation including all labour, material T&P etc. | 9.8 | CUM | - | - |
| 3 | Class - 150 ( Non modular ) brick work in 1:3 cement and coarse sand of FM not less than 1.25 mortar in foundation including supply of all material, labour and T&P etc. required for proper completion of the work. | 49.2 | CUM | - | - |
| 4 | Reinforced Cement Concrete work for Super structure of M20 (1:1.5:3) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc but excluding supply of reinforcement and its bending and including its fixing and binding the same with 24 BWGI binding wire and including necessasary centering and shuttering. required for proper completion of the work. | 17.6 | CUM | - | - |
| 5 | Centring&Shuttering For R.C.C Work I/C All Cost Of Labour T&P etc Complete For Proper Completion Of Work | 34.15 | SQM | - | - |
| 6 | Supplying and laying TMT Steel bar reinforcement as per approved drawing, including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the work. | 1.02 | MT | - | - |
| 7 | Struck Pointing With Cement Mortar Consisting of 1:2 (Cement:Fine Sand of 1.25 Finenes Modulus On Brick Work Including Supply Of all Materials Labour And Completion Of Work. | 52.2 | SQM | - | - |
| 8 | Supplying & Fixing 100 mm dia PVC Drainage Pipe i/c all cost of material, T&P etc for Proper complition of work. | 2 | RM | - | - |
| 9 | S/F Tarfelt on Abutment cap i/c all cost of materials, T&P etc for proper completion of work. | 4.9 | SQM | - | - |
| 10 | Providing of Expansion Joint including cost of all labour, materials, T&P etc. Complete. | 12.4 | RM | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
fourbook.pdf
Tender Documents • 1.23 MB
BOQ_2183965.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].