Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44,869.50Qualified 0 KALIBADI SCHOOL HANUMAN NAGAR NEAR KALIBADI CHOWK RAIPUR CHHATTISGARH 492001 UDYAM CG 14 0093504 | RAIPUR | CHHATTISGARH | 492001 | ₹44,869.50 | L1 | Qualified MSE, Category: OBC |
| 2 | L2₹63,900Qualified 00 HAZIPUR MUMTAJ NAGAR SINGHPUR SAHADATGANJ AYODHYA UTTAR PRADESH 224001 | AYODHYA | UTTAR PRADESH | 224001 | ₹63,900 | L2 | Qualified |
| 3 | L3₹67,260Qualified H NO 338 LIG JARAULI PHASE 2 VAISHNAVI VIHAR KANPUR NAGAR UTTAR PRADESH 208027 UDYAM UP 43 0122164 | KANPUR NAGAR | UTTAR PRADESH | 208027 | ₹67,260 | L3 | Qualified |
Tender Value
₹69,030
EMD Value
Exempted
Closing Date
20 Jul 2026, 5:00 pmClosed
Dismantling of defective CB pole assembly
Checking and shifting of spare CB pole
Safe carriage of CGL make 132KV CB pole
Erection of spare CB pole with SF-6 filling
Dismantling and repair of CB valve assembly
9561226
GEM/2026/B/7746880
Two Packet Bid
Dismantling of defective CB pole assembly,Checking and shifting of spare CB pole,Safe carriage of C
Kanpur Nagar, Uttar Pradesh
Total value wise evaluation
BOQ
5 documents required · 5 mandatory
1 yrs
₹31
₹1 L
80%
Executive Engineer, Electricity Transmission Division-II, Govind Nagar, Kanpur, Energy Department Uttar Pradesh, Uttar Pradesh, Power Corporation Limited (UPPCL),, (Ajay Kumar Burman)
Exempted
Yes
20 Jul 2026
4 Jul 2026
20 Jul 2026
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Dismantling of defective CB pole assembly | Dismantling of defective pole assembly of the 145 KV SF-6 Circuit Breaker (Make-CGL) installed in 132KV Naubasta-Krishna Nagar ckt-I Bay at 132KV Substation Krishna Nagar, Kanpur. Work includes opening of both side jumpers, opening of B-phase pole assembly connections, and removal of the defective pole using Hydra/Crane, placing it back to the storage place at the substation as per direction of the Supervising Engineer. Job includes all cost of Hydra/Crane, manpower, miscellaneous consumables (excluding SF-6 gas) and tools & plants required for satisfactory completion. | 1 | Job | Akshay Singh 208007,ELECTRICIYT TRANSMISSION SUB DIVISION | 30 |
| 2 | Checking and shifting of spare CB pole | Checking of the spare used 132KV CB pole lying at storage at 220KV Substation Panki, Kanpur for its healthiness, and shifting it from the storage place to the loading point using Hydra/Crane with proper care and safety, for onward use as a replacement pole at 132KV S/S Krishna Nagar. Job includes all cost of Hydra/Crane, manpower, miscellaneous consumables (excluding SF-6 gas) and tools & plants required for satisfactory completion. | 1 | Job | Akshay Singh 208007,ELECTRICIYT TRANSMISSION SUB DIVISION | 30 |
| 3 | Safe carriage of CGL make 132KV CB pole | Safe carriage of the CGL make 132KV CB pole from 220KV S/S Panki, Kanpur to 132KV S/S Krishna Nagar, Kanpur by private carrier. Job includes loading of the healthy old & used pole onto the carrier after removal from the damaged CB by Hydra/Crane, safely and carefully, at 220KV S/S Panki, and unloading of the pole at 132KV S/S Krishna Nagar. Job includes all cost of Hydra/Crane, manpower, miscellaneous consumables (excluding SF-6 gas) and tools & plants required for satisfactory completion. | 1 | Job | Akshay Singh 208007,ELECTRICIYT TRANSMISSION SUB DIVISION | 30 |
| 4 | Erection of spare CB pole with SF-6 filling | Erection of the spare used pole in place of the old one at 132KV S/S Krishna Nagar using Hydra/Crane. Work includes installation of the pole, connection of pole assembly for proper and smooth operation of the circuit breaker, filling of SF-6 gas up to the prescribed pressure, and jumpering of the Circuit Breaker. Job includes all cost of Hydra/Crane, manpower, miscellaneous consumables (excluding SF-6 gas) and tools & plants required for satisfactory completion. | 1 | Job | Akshay Singh 208007,ELECTRICIYT TRANSMISSION SUB DIVISION | 30 |
| 5 | Dismantling and repair of CB valve assembly | Dismantling of the control valve assembly, main closing mechanism, shock absorber, and horizontal rod assembly with its link roller of the 145KV SF-6 Circuit Breaker at 132KV S/S Krishna Nagar, to dismantle the broken black bolt key, and fixing of all parts back in the same place after repairing. Job includes all cost of Hydra/Crane, manpower, miscellaneous consumables (excluding SF-6 gas) and tools & plants required for satisfactory completion. | 1 | Job | Akshay Singh 208007,ELECTRICIYT TRANSMISSION SUB DIVISION | 30 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9561226.pdf
GEM_BID • 0.13 MB
380_to_upload_2026-07-04-16-51-39_113e4f50377ecf007fe95498dc5fdd01.pdf
BOQ • 1.32 MB
boq_item_filled_2026-07-04-16-51-39_515c0f98ddfcd94086119f0f0275a858.csv
BOQ • 0.00 MB
1783164325.xlsx
GEM_OTHER • 0.01 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].