Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 LAccepted-Finance 134 SHANTI COLONY ETAWAH | L1 | Accepted-Finance Responsive |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
19 Oct 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE PD PWD AURAIYA
EE PD PWD AURAIYA
Maintenance work for residential complexes in Auraiya district
2026_CEKNP_1195636_1
2477/8A/2026 Dt. 12-10-2026
Open Tender
Civil Works - Buildings
Percentage
180 days
EE PD PWD AURAIYA
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹1.5 L
Yes
EE PD PWD AURAIYA
2 Nov 2026
13 Oct 2026
19 Oct 2026
13 Oct 2026
19 Oct 2026
13 Oct 2026
16 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 15.7 Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 15.7.4 In cement mortar | 10 | Cum | 1,500 | ₹15,000 |
| 2 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete 13.88 | 1,380 | Sqm | 14 | ₹19,320 |
| 3 | 4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-ill) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.2 | Cum | 5,300 | ₹6,360 |
| 4 | 6.1 Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: 6.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand) | 13.8 | Cum | 5,360 | ₹73,968 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.12 | Cum | 6,580 | ₹13,949.6 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for 5.9.21 Lintels, beams, plinth beams, girders, bressumers and cantilevers with water proof ply 12 mm thick | 18.4 | Sqm | 610 | ₹11,224 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.22.1 Mild steel and Medium Tensile steel bars | 166.11 | kg | 78 | ₹12,956.58 |
| 8 | Chequered terrazo tiles 22 mm thick with graded marble chips of size up to 6 mm in floors, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing and polishing complete, on 20 mm thick bed of cement mortar 1:4 (1 cement :4 coarse sand) 11.19.4 Ordinary cement without any pigment | 20 | Sqm | 1,000 | ₹20,000 |
| 9 | 11.41A.3 Glazed Vitrified tiles Matt/Antiskid finish of size 11.41A.3.1 Size of Tile 600x600 mm | 86.25 | Sqm | 1,060 | ₹91,425 |
| 10 | Fibre reinforced elastomeric liquid water proofing membrane 8511 | 30 | ltr | 185 | ₹5,550 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
BOQ_2258131.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .