Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹28.5 L (19.2%)Admitted-Finance | ₹1.8 Cr+₹28.5 L (19.2%) | L2 | Admitted-Finance |
| 3 | L3₹1.8 Cr+₹33.7 L (22.7%)Admitted-Finance | ₹1.8 Cr+₹33.7 L (22.7%) | L3 | Admitted-Finance |
| 4 | L4₹2.0 Cr+₹46.9 L (31.6%)Admitted-Finance | ₹2.0 Cr+₹46.9 L (31.6%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical AS the indl is enlisted two class below Class D whereas the reqmt was of Class B Hence Rejected |
| Sl No | Description | Qty | Unit | M/s Vijay Airconditioning Pvt Ltd L3 | Maruti Abhiyantriki L1 | BRITE INDUSTRIES L4 | DARSHAN CONSTRUCTION Co. L2 |
|---|---|---|---|---|---|---|---|
| 1.01NOTE: Schedule ‘A’ Part I to VII under Ser No 1 to 7 are Prepriced by MES. Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only. | |||||||
| 1.02 | Lump sum price worked out for Building / Structures as listed in Sch `A’ Part I. | 1 | UNIT | 22,77,385 ₹22,77,385 | 21,21,212 ₹21,21,212 Lowest | 30,24,343 ₹30,24,343 | 30,12,500 ₹30,12,500 |
| 2.00 | Lump sum price worked out for SITE CLEARANCE AND DEVELOPMENT as listed in Sch `A’ Part II | 1 | UNIT | 3,685 ₹3,685 | 3,000 ₹3,000 Lowest | 7,999 ₹7,999 | 5,000 ₹5,000 |
| 3.00 | Lump sum price worked out for INTERNAL ELECTRIFICATION as listed in Sch `A’ Part III | 1 | UNIT | 1,50,902 ₹1,50,902 | 1,21,000 ₹1,21,000 Lowest | 1,48,999 ₹1,48,999 | 1,50,000 ₹1,50,000 |
| 4.00 | Lump sum price worked out for ROAD, PATH & HARDSTANDING as listed in Sch `A’ Part IV | 1 | UNIT | 2,15,594 ₹2,15,594 | 1,60,000 ₹1,60,000 Lowest | 2,10,573 ₹2,10,573 | 2,15,000 ₹2,15,000 |
| 5.00 | Lump sum price worked out for FALSE CEILING as listed in Sch `A’ Part V | 1 | UNIT | 14,52,308 ₹14,52,308 | 11,50,000 ₹11,50,000 Lowest | 14,18,483 ₹14,18,483 | 12,75,000 ₹12,75,000 |
| 6.00 | Lump sum price worked out for EXTERNAL WATER SUPPLY as listed in Sch `A’ Part VI | 1 | UNIT | 73,811 ₹73,811 | 50,000 ₹50,000 Lowest | 72,092 ₹72,092 | 75,000 ₹75,000 |
| 7.00 | Lump sum price worked out for EXTERNAL ELECTRIFICATION as listed in Sch `A’ Part VII | 1 | UNIT | 2,30,840 ₹2,30,840 | 1,85,000 ₹1,85,000 Lowest | 2,25,464 ₹2,25,464 | 2,50,000 ₹2,50,000 |
| 7.01SCHEDULE 'A' PART - VIII MISCELLANEOUS ITEMS (Note for Item No 7.01 to Item No 48.00 : Bidder shall insert their rates for each of these items separately in Green filed under Col-6. The estimated rate column 05 is left blank since the same is not prepriced by MES.) | |||||||
| 7.02FALSE CEILING | |||||||
Tender Value
₹1.3 Cr
EMD Value
₹2.1 L
Closing Date
25 Aug 2026, 6:00 pmClosed
Kiran Gajrani, IDSE
Commander Works Engineers (AF), Khese Park, Lohegaon, Pune-411032
PROVN OF CENTRALISED AIR CONDITIONING SYSTEM AND ALLIED WORKS AT UNIFIED MISSION COMPUTER (UMC) LAB AT 9 BRD UNDER GE AF LOHEGAON
2026_MES_777254_1
83021/E8
Open Tender
Miscellaneous Works
Lump-sum
330 days
GE AF Lohegaon
AS PER NIT AND TENDER DOCUMENTS
7 documents required · 7 mandatory
₹1,000
GE AF Lohegaon
₹2.1 L
Yes
18 Sept 2026
8 Jul 2026
1 Sept 2026
8 Jul 2026
25 Aug 2026
13 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Lump sum price worked out for Building / Structures as listed in Sch `A’ Part I. | 1 | UNIT | 20,70,350 | ₹20,70,350 |
| 2 | Lump sum price worked out for SITE CLEARANCE AND DEVELOPMENT as listed in Sch `A’ Part II | 1 | UNIT | 3,350 | ₹3,350 |
| 3 | Lump sum price worked out for INTERNAL ELECTRIFICATION as listed in Sch `A’ Part III | 1 | UNIT | 1,37,183.79 | ₹1,37,183.79 |
| 4 | Lump sum price worked out for ROAD, PATH & HARDSTANDING as listed in Sch `A’ Part IV | 1 | UNIT | 1,95,995.19 | ₹1,95,995.19 |
| 5 | Lump sum price worked out for FALSE CEILING as listed in Sch `A’ Part V | 1 | UNIT | 13,20,280.5 | ₹13,20,280.5 |
| 6 | Lump sum price worked out for EXTERNAL WATER SUPPLY as listed in Sch `A’ Part VI | 1 | UNIT | 67,100.72 | ₹67,100.72 |
| 7 | Lump sum price worked out for EXTERNAL ELECTRIFICATION as listed in Sch `A’ Part VII | 1 | UNIT | 2,09,854.8 | ₹2,09,854.8 |
| 8SCHEDULE 'A' PART - VIII MISCELLANEOUS ITEMS (Note for Item No 7.01 to Item No 47.00 : Bidder shall insert their rates for each of these items separately in Green filed under Col-6. The estimated rate column 05 is left blank since the same is not prepriced by MES.) | |||||
| 9FALSE CEILING | |||||
| 9.01 | Taking out old serviceable LT cable of Size 50sqmm 3.5 core to 95 sqmm 3.5 core from trench/ pipe/ wall / roof/ on ceiling etc and Relaying of old serviceable LT under ground PVC/XLPE cable any grade and any size in trenches/fixed to wall/pole/roof/laid in floor including necessary connections and thimbling complete all as specified and as directed by Engineer-in-charge. | 350 | RM | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.44 MB
TD-83021.pdf
Tender Documents • 2.32 MB
BOQ_870484.xls
BOQ • 3.91 MB
83021dwgcomp.pdf
Additional Documents • 16.67 MB
corri-3boqrevpagesmerged.pdf
PDF • 1.93 MB
DTCORRI-2-83021.pdf
PDF • 0.29 MB
DTCORRI-83021.pdf
PDF • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .