Tender Value
₹2.4 L
EMD Value
₹2,400
Closing Date
24 Sept 2026, 5:30 pmDue tomorrow
Executive Officer
Office of Udala NAC
Constructions of RCC Culvert Near Kalyan Palace in Ward No-10 Under Udala NAC
2026_ORULB_140692_4
UDLN-03/2026-27
Open Tender
Civil Works - Others
Percentage
30 days
Udala
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹2,400
Yes
11 Sept 2026
11 Sept 2026
25 Sept 2026
11 Sept 2026
24 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and removing cement concrete incl.stacking the useful materials for reuse &removing the debris within 50m. lead etc. complete. | 4.35 | Cum | 877.16 | ₹3,815.65 |
| 2 | Earthwork excavation in hard soil within 50mtr initial lead, 1.5m initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth and as per direction of the Engineer-in-charge. | 19.58 | Cum | 282.88 | ₹5,538.79 |
| 3 | Filling foundation plinth with sand well watered and rammed etc. complete. | 3.26 | Cum | 633.3 | ₹2,064.56 |
| 4 | C.C.(1:3:6) with 40mm HBHG metal including cost,carriage and royalty of materials . | 3.26 | Cum | 6,498.5 | ₹21,185.11 |
| 5 | R.C.C work of M-20 grade with 20mm and down grade C.B chips including hoisting & laying including cost,carriage and royalty , tax of materials | 14.14 | Cum | 6,605.7 | ₹93,404.6 |
| 6 | Supplying, fitting & placing uncoated HYSD bar reinforcement complete as per drawing and techinical specification with cost, conveyance of rod & binding, wire etc complete. (Data for 1 Mt.) | 6.91 | Qntl. | 9,538.4 | ₹65,910.34 |
| 7 | Rigid & smooth centering & shuttering for C.C wall including false works and dismantling them after casting including cost of materials complete. | 22.5 | Sqm | 1,087.56 | ₹24,470.1 |
| 7.1 | b)Slab | 23.73 | Sqm | 769.2 | ₹18,253.12 |
| 8 | Fillig in Foundation and plinth with the excavated earth including all cost complete. 2/3 Quantity of Item No - 1 | 13.05 | Cum | 116.96 | ₹1,526.33 |
| 9 | Installation of Disply board and Photography | 1 | Nos | 1,120 | ₹1,120 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
DTCN9.pdf
Tender Documents • 1.28 MB
BOQ_608988.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .