| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 11 ANUPAM VIHAR ENGINEERS ENCLAVE GMS ROAD DEHRADUN UTTARAKHAND 248001 | DEHRADUN | UTTARAKHAND | 248001 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
18 Mar 2021, 3:00 pmClosed
Er. Bir Singh
Executive Engineer TCC Division Jammu
Restoration of Minor I of D-19 of Main Ravi Canal from RD 700-900M at spots
2021_IFC_120040_2
e-NIT No 35 of 2020-21
Open Tender
Civil Works
Item Rate
60 days
Restoration of Minor I of D-19 of Main Ravi Canal
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Yes
Executive Engineer TCC Division Jammu
Exempted
19 Mar 2021
10 Mar 2021
18 Mar 2021
10 Mar 2021
18 Mar 2021
10 Mar 2021
Amount
Clearing Jungle including uprooting of rank vegetation grass brushwood trees and sapling of girth of upto 30 cm measured at height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Silt Clearance from canals inclusive of initial lead and lift ( 50 M and 1.5 M respectively )
Weed Clerance from canals (including extraction of roots)
Disposal of silt cleared from canal by mech. Transport from site average distance 1 Km
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains & the like
Dismantling cement concrete grouted stone pitching in aprons , drains, etc including stacking of serviceable material & disposal of unserviceable material, stacking/ disposal lead up to 100M
Earth work in rough excavation banking excavated earth in layers not exceeding 20 Cm in depth, breaking clods, watering, rolling each layer with half tonne roller or wooden or steel rammer and ro lling every third and top most layer with power roller of minimum 8 tonne and dressing up in embankments for roads flood banks marginal banks and guide or filling up gro und depressions lead upto 50 m and lift upto 1.5 m . All kinds of s oil.Deduct for not rolling with power roller of min 8 tonne for banking excavated earth in layer not exceeding 20 Cm in depth. Deduct for not watering the excavated earth for banking
Dry stone ptitiching (any thickness) excluding cost of stone
On Slopes
On Horizontal
Grouting of stone pitching using M-10 nomin al mix concrete ( Max size of aggregates 20 mm nominal @ 6.00 cum per 100 sqm on horizontal/side slopes ,complete including curing crushed.
Supply of stone boulder (nalah) nominal size 225MM (stack measurement reduced by 15%)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work upto plinth level.
1:4: 8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40MM nominal size) crushed.
1:3: 6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20MM nominal size) crushed.
12mm cement plaster of mix 1:4 (1 cement : 4 coarse sand)
Dumping stones excluding cost of stones. (in Hozizontal on level)
Centering and shuttering including strutting propping etc and removal of form for : Foundations, footings, bases of columns etc for mass concrete.
Carriage of Nallah stone distance 10 Km by MT from source to site of work including loading, unloading
Carriage of stone agg nominal size 20MM and sand average distance 10 Km by MT from source to site of work including loading, unloading
Carriage of stone agg nominal size 40MM average distance 10 Km by MT from source to site of work including loading, unloading
Ravi Kant Verma
Sodagar Mal Govt Contractor
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .