Loading…
Loading…
Tender Value
₹439.5 Cr
EMD Value
₹2 Cr
Closing Date
16 Mar 2026, 3:00 pmClosed
Yes (up to 4 members)
Two Packet System
EPC [ Single Stage ]
Yes
16/01/2026 11:00
Lowest to Highest
180 days
Expenditure
Capital (Works)
GENERAL
13 conditions · 2 needing a document upload
The Bidder shall have a minimum Net Worth (the"Financial Capacity") of 5% of Estimated ProjectCost at the close of the preceding Financial Year.(Refer clause No. 2.2.2.2 of RFP).
The Bidder shall have the Technical Capacity and Experience as mentioned in Clause No. 2.2.2.1, 2.2.2.3 to 2.2.2.9 of the RFP.
29 conditions · 14 needing a document upload
ANNEXURE I TO APPENDIX IA-(DETAILS OF BIDDER) The Bidder shall ensure that all the details are updated as on the due date of submission of this Bid.
APPENDIX IA (LETTER COMPRISING THE TECHNICAL BID) Clause 2.1.4, 2.11 and 3.1.6 of RFP.
APPENDIX IB (LETTER COMPRISING THE FINANCIAL BID) (Para 2.1.4, 2.11 and 3.1.6 of RFP)-The Bid shall be furnished in the format exactly as per Appendix-IA & IB i.e. Technical Bid as per Appendix IA and Financial Bid as per Appendix IB and it shall be signed by the Bidder's authorized signatory. The Bidder shall first upload all the project details as mentioned in Para No. 2.11.1 of RFP document
APPENDIX-II (FORMAT FOR POWER OF ATTORNEY FOR SIGNING OF BID) Clause No. 2.1.5 of RFP.
ANNEXURE II TO APPENDIX IA(TECHNICAL CAPACITY OF THE BIDDER): Refer CLAUSE 2.2.2.1, 2.2.2.4 and 2.2.2.6 of RFP.
APPENDIX III- Format for power of attorney for lead member of Consortium/Joint venture CLAUSE 2.1.6 of RFP.
ANNEXURE III TO APPENDIX IA- (FINACIAL CAPACITY OF THE BIDDER) (Refer clause 2.2.2.2, 2.2.2.8(i), 2.2.2.7(iii) of RFP) The Bidder must establish the minimum Net Worth specified in Clause 2.2.2.2 and provide details as per format at Annex-III of Appendix-IA.
APPENDIX IV (FORMAT FOR JOINT BIDDING AGREEMENT FOR (CONSORTIUM/ JOINT VENTURE) Clause 2.1.11 of RFP.
ANNEXURE IV TO APPENDIX IA (DETAILS OF ELIGIBLE PROJECTS) Refer Clause 2.2.2.1, 2.2.2.4 and 2.2.2.6 of RFP.
ANNEXURE V TO APPENDIX IA- (STATEMENT OF LEGAL CAPACITY).
APPENDIX-VII (BID SECURITY)/EMD (REFER Para 1.2.4 of RFP)The Bidder shall furnish as part of its Bid, a Bid Security, referred to in Clause 1.2.4 here in above through [e- payment Gateway of Authority OR in form of Bank Guarantee from a Bank as per format at Appendix VII].
ANNEXURE VI TO APPENDIX IA-(Guidelines of theDepartment of Disinvestment) The Bidder shallensure that all the details are updated as on thedue date of submission of this Bid.
ANNEXURE VII TO APPENDIX IA-(Department ofExpenditure, Ministry of Finance, Government ofIndia letterF.No.6/18/2019-PPD dated:23/07/2020shall be referred which is enclosed as Annexure-VIIof Appendix-IA) The Bidder shall ensure that all thedetails are updated as on the due date ofsubmission of this Bid.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
STUDY OF DRAWINGS AND LOCAL CONDITIONS: The drawings for the works can be seen in the office of the Chief Administrative Officer, Construction, S.C.Railway, Secunderabad - 500071 or in the office of the concerned field Deputy Chief Engineer / Construction / S.C.Railway . It should be noted that these drawings are meant for general guidance only and Railway may suitably modify them during the execution of work according to the circumstances without making the Railways liable for any claims on account of such changes. If there is any variation between the description in the tender and the detailed plans, the Engineer-in-Charge will operate the correct description and his decision is final and binding on the tenderer/ Contractor. The Tenderer/Contractor is required to inspect the sites of works and acquaint himself with the site conditions, availability of approaches for transporting of men and materials, space and other factors relating to the works, availability of labour, electricity and water, etc., before quoting his rates. The extent of lead and lift involved in the execution of works and any difficulties involved in the execution of work should also be examined before formulating the rates for complete items of works described in the schedule. The Tender submitted will be deemed to have been made after such inspection.
CORRIGENDUM NOTICE ON IREPS: [I]Railway may modify the tender document by issuing online corrigendum through "www.ireps.gov.in" 15 days prior to the tender closing date. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing of tender, during which tenderers can submit their offer.
Applicable for the tenders with eligibility criteria: The offer of Tenderer(s) who do not enclose Work Experience Certificate & Financial eligibility Certificate with requisite details, and supporting documents along with their Tender to establish their credentials shall be summarily rejected, even though they are working contractors or contractors on approved list.
The offer shall be evaluated only from the certificates/documents submitted along with the tender offer.
Any Certificate /Documents offered / submitted / received after the tender opening shall not be given any credit and shall not be considered.
Railway reserves the right to verify the authenticity of the documents/information furnished.
Tenderer(s) shall note that conditional/alternate offer will not be considered and will summarily be rejected, even though such condition makes them as the lowest tenderer.
South Central Railway (Construction Organization)-Engineering, Procurement and Construction (EPC) contract for "Doubling of Track between Sant Sevalal Maharaj to Vishnupuram stations including Electrification & Signalling works in connection with Motumari-Vishnupuram Doubling in the States of Telangana & Andhra Pradesh".
EPC-10-CAO-C-SC-2025
EPC-10-CAO-C-SC-2025
Open
Works - General
24 Months
Unknown (Unspecified Location)
₹0
₹2 Cr
16 Mar 2026
6 Dec 2025
3 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 4,39,45,79,122.92 | ||
| — | — | — | 4,39,45,79,122.92 | ||
| Railway Track between with | South Central "Doubling of in connection | (Construction Sant Sevalal Motumari-Vishnupuram | and Construction including & Andhra Pradesh |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
BACKFILL1453-90.pdf
TMSidinglayout.pdf
1651643092748-ProvisionofFiltermediabehindboulderfillingatAbutmentsWingwallsRetainingwalls-CBE-29-04-2022.pdf
RCCRetainingWallonApproachofRUBs.pdf
ESO91-PreparationofGADsandCompletionDrawingsofBridges.pdf
EPC-10-RevisedKITdetails.pdf
ESONo.93PreparationofESPsandCompletionDrawingsofStationYards.pdf
5.15mBallastRetainerfr12.20mspan1.pdf
Ladderdragwing1707816221439-Sl.No.3.1.pdf
5.15mBallastRetainerfr6.10mspan1.pdf
5.15mBallastRetainerfr9.15mspan1.pdf
LEDSPECIFICATIONS.pdf
Signages_Standard_Sizes.pdf
ComprehensiveInstructionsforPassengersAmenities.pdf
safetyatworksites-compressed.pdf
Specificatinsofballast.pdf
PitchingPolicyLetter.pdf
VDCAlt-1to71_2022__1.pdf
Rly.BoardRUBDrainageCircularsJun-22_.pdf
PCEDesignMixconclr.pdf
INSTRUCTIONSONFLOORINGSPECIFICATIONS06.05.2022-1.pdf
FIURevisedPolicyissuedbyCBE-SCRly.pdf
ComprehensiveInstructionsforPassengersAmenities.pdf
Platforms-SystemImprovent_1.pdf
10155-RCCBOXGAD.pdf
RCCBOXESRDSO-B-10152-1R.pdf
RCCBOXESRDSO-B-10152-2R.pdf
RCCBOXESRDSO-B-10152-3R.pdf
RCCBOXESRDSO-B-10152-4R.pdf
RCCBOXESRDSO-B-10152-5R.pdf
RCCBOXESRDSO-B-10152-6R.pdf
RCCBOXESRDSO-B-10152-7R.pdf
RCCBOXESRDSO-B-10152-8R.pdf
RCCBOXESRDSO-B-10152-9R.pdf
Specificatinsofballast.pdf
BallastprofileforLWRtrack.pdf
PreinspectionofMaterialbyRITESorRDSORBletterno2000.RS.G.379.2dt06-09-2017.pdf
TypicalSketchforTrolleyRefugee-inBankingsandCuttings.pdf
ESO87.pdf
SCRINSTRUCTIONSONFLOORING-SPECIFICATIONS06.05.2022-1.pdf
SystemImprovement-GuidelinesonMaterialstobeusedforPFSurfacePFWall-PrecastPFWall.pdf
SPECIMENDRGFORPLATFORMAMENITIES.pdf
StandardHeightGuage3Sheets.pdf
DETAILSOFPERSONNELPLANTANDMACHINERYWORKSONHANDFORMATS.pdf
EMPLOYMNTOFRETIREDRAILWAYOFFICERSCERTIFICATEFORMAT.pdf
PublicprocurementMakeinIndia.pdf
NEFT_FORM_GCC_2022.pdf
RCCDRAINAK-KNW.pdf
Corrigendum-ComprehensiveInstructionsforPassengersAmenities.pdf
SpecificationsforTrackBallast.pdf
StandardHeightGuage3Sheets.pdf
GuidelinesforTMTBars28.8.24.pdf
PolicyGuidelines-RUB.pdf
MixDesign-PolicyLetter.pdf
BLT-RDSOGuidelines10-03-2023.pdf
IRSODBG2021.pdf
FormatforBankGuarantee11.10.2019ver-2.pdf
RevisedApprovedlistofBrands30.6.25.pdf
ProvisionofDrainagearrangements.pdf
PLATFORMWALLSDRG.pdf
SpecialConditions-Measurementofworksbycontractor28.08.21-Ver-1.pdf
SPECIALCONDITIONS-TECHNICALforEarthworkandConcreteworks18.08.21ver1.pdf
SpecialConditionsTechnicalforPSCslabsCONCRETEDESIGN25.03.21VER5.pdf
SplconditionsTechnicalforLayingLinkingofRailwaytrack25.03.21ver3.pdf
SplconsTechnicalforBldgsworksPFworksWorkshopsFOB-COPworks.-25.03.21Ver3.pdf
TMSidinglayout.pdf
BUFFERENDDRG.pdf
3x12.20mPSCSLAB.pdf
FOB3mWide4trackcrossingGAD.pdf
StdDrawing-CCPavement-31102025.pdf
3BafflewallandprotectivescreenRDSOdrgs.pdf
9HeightgaugesStd.ISMBtype.pdf
18preinspectionletters.pdf
27WorksiteprotectionFlyleaf-4.pdf
CSOFDrainincutting.pdf
SAMPLEMAJORBRIDGE.pdf
SAMPLEMINORBRIDGE.pdf
65KM-70KM-Model.pdf
70KM-75KM-Model.pdf
75KM-80KM-Model.pdf
80KM-85KM-Model.pdf
SriSanthSevalalMaharajRailwayCrossingStationESP_V13.pdf
JANPAHADSTATIONESP_V12.pdf
All2x25TSSSPSSPRDSOdrawings.pdf
BafflewallandprotectivescreenRDSOdrgs.pdf
Electricalpolicyletters.pdf
Electricalpolicyletters2.pdf
Electricalpolicyletters3.pdf
ElectricalTRDdrawingslinks.pdf
ETISPCPSICLS0020.pdf
GEworksCircular04-2022_monitoringGEWorks.pdf
ImportantElectricalTRDguidelinesletters.pdf
Master_list_of_drawings_TI2023.pdf
RDSOOHEPSIReportsandemp.sch.pdf
SCADATI_SPC_RCC_SCADA_0134-pages-11.pdf
TICIVMS2020dt22.08.2022galvanization.pdf
TOWERCARANDOHECUMPSIdepotdrg.pdf
62-68LOP_.pdf
68-74LOP.pdf
74-81LOP.pdf
issueletter3.66_1.pdf
issueletterof3.05M.pdf
85KM-88KM-Model.pdf
STDrawings_.pdf
STpolicyletters.pdf
ProposedfloorplanforRBGOFCMTGoomtyandLCGateLodge2.pdf
SIPJANPAHAD_IPU.5246_ALT.3.pdf
SIPRAGHAPURAMIPU.5247-A0.pdf
SIPVISHNUPURAMBYEPASS_IPU.5248_A0.pdf
SIPVISHNUPURAMJn_IPU.5232D_Alt.0.pdf
SSLM-VNUPFLOORPLANS_111120251316191.PDF
PreBidConferenceLink-EPCSSLMVNUP.pdf
STATIONBUILDINGMODELDRAWING..pdf
ReferenceDrawings-1ST-compressed.pdf
ReferenceDrawings-2ST-compressed.pdf
ReferenceDrawings-3ST-compressed.pdf
ReferenceDrawings-4ST-compressed.pdf
ReferenceDrawings-5ST-compressed.pdf
TechnicalPolicyCirculars1.pdf
TechnicalPolicyCirculars2.pdf
TechnicalPolicyCirculars3.pdf
Alignmentplan-KMLfile.pdf
EPCDoc-SSLM-VNUP06.12.2025.pdf
RFPDoc-SSLM-VNUP06.12.2025.pdf
PolicyLr.-EPCestimateCOS.pdf
VNUPCCP2.pdf
CORRIGENDUM
EPC-10-RevisedKITdetails.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].