Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹12.2 L
EMD Value
₹12,210
Closing Date
2 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
BDO VP KALLIKUDI
BDO VP KALLIKUDI
Madurai District Construction of 10000 Litre capacity OHT with new borewell at S.Krishnapuram village at SP Natham Panchayat at kallikudi Panchayat Union
2026_RDTN_714443_1
01/Kalli/15th CFC BP -VP Savings /2026-2027
Open Tender
Civil Works
Works
120 days
Kallikudi Panchayat union office
Madurai District Construction of 10000 Litre capacity OHT with new borewell at S.Krishnapuram village at SP Natham Panchayat at kallikudi Panchayat Union
3 documents required · 3 mandatory
₹0
₹12,210
Yes
15 Oct 2026
15 Oct 2026
2 Nov 2026
15 Oct 2026
2 Nov 2026
15 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation below G.L. and depositing on bank within an initial lead of 10.00 m and an initial lift of 2.00 for the following classification of soil In hard stiff clay, stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil S.S.20B | 23.34 | m3 | 263.78 | ₹6,156.63 |
| 2 | Sand filling for foundation with clear river sand including cost of sand,watering,ramming and consolidation etc complete as directed by TWAD Board officers | 1.16 | m3 | 1,827.67 | ₹2,120.1 |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 1.73 | m3 | 5,479.21 | ₹9,479.03 |
| 4 | RCC 1;1.5;3 (ONE CEMENT .ONE AND HALF SAND AND THREE AGGREGATES)using 200mm HBG stone for OHT including cost Below 1.5m from GL Column footing | 1.96 | m3 | 9,220.69 | ₹18,072.55 |
| 5 | 0m to 1.50m below GL | 1.03 | m3 | 9,220.69 | ₹9,497.31 |
| 6 | AGL to 4.50m above GL | 2.11 | m3 | 9,361.76 | ₹19,753.31 |
| 7 | 4.50 m to 7.32 m above GL | 1.51 | m3 | 9,639.65 | ₹14,555.87 |
| 8 | 7.32 m to 10.98 m above GL | 1.8 | m3 | 9,917.54 | ₹17,851.57 |
| 9 | 10.98 m to 14.64 m above GL | 6.56 | m3 | 10,195.43 | ₹66,882.02 |
| 10 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. Below GL Footing , Brace bottom, brace sides | 8.78 | m2 | 1,095 | ₹9,614.1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
pqoht10000ltr.pdf
Tender Documents • 0.83 MB
BOQ_858236.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .