Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.6 LAccepted-AOC | 1 | Accepted-AOC LOWEST OK | |
| 2 | 2₹1.7 L+₹8,262 (5.16%)Rejected-AOC | 2 | Rejected-AOC 2ND | |
| 3 | 3₹2.0 L+₹38,060 (23.8%)Rejected-AOC | 3 | Rejected-AOC 3RD | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
18 Jul 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PRINCIPAL SCTS MIRAN SAHIB
Soil Conservation Training School, Miran Sahib
Creation of Soakage Pit 04 No at Soil Conservation Training School, Miran Sahib
2022_FD_177012_1
02 OF 2022-23
Open Tender
Civil Works
Item Rate
45 days
SOIL CONSERVATION TRAINING SCHOOL MIRAN SAHIB
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
PRINCIPAL SCTS MIRANSAHIB - HEAD 0406 FOREST
₹4,000
Principal Soil Conservation Training school
27 Oct 2022
30 Jun 2022
19 Jul 2022
30 Jun 2022
18 Jul 2022
30 Jun 2022
6 Jul 2022
Amount
Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size) including all leads lift carriage complete job
Honey-comb brick work 10/11.4 cm thick with common burnt clay (non-modular) bricks of class designation 75 in superstructure above plinth level upto floor five level in cement mortar 1:4 (1 cement : 4 coarse sand) including all leads lift carriage complete job
Providing and laying brick bats 40 mm thick including supply at soakage pit complete job
Providing and laying Reinforced Cement Concrete1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) in suspended floors, balconies, landings and staircase having upto 15°slope. excluding cost of centering and shuttering ,all work upto floor V-level
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
Centring and shuttermg including strutting, propping etc.and removal of form for Edges of slab under 20 cms wide
Providing & fixing of Man hole cover 600x600mm
Providing & fixing of ISI marked PVC pipe 100mm dia
Ravinder Singh Contractor
sat pal
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .