| 1 | L1₹14.8 LAccepted-Finance | ₹14.8 L | L1 | Accepted-Finance Lowest Amount Quoted |
| 2 | L2₹15.2 LAccepted-Finance 44 621708 | PERAMBALUR | TAMIL NADU | 621708 | ₹15.2 L | L2 | Accepted-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | CHINNASAMY N L1 | KATHIRAVAN R L2 |
|---|---|---|---|---|---|
| 1.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 247.5 | m2 | 23 ₹5,692.50 | 25 ₹6,187.50 |
| 2.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 87.58 | m3 | 2,417 ₹2.1 L | 2,555 ₹2.2 L |
| 3.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 174.84 | m3 | 2,509 ₹4.4 L | 2,550 ₹4.5 L |
| 4.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,417 | m2 | 86 ₹1.2 L | 90 ₹1.3 L |
| 5.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 1,417 | m2 | 20 ₹28,340 | 23 ₹32,591 |
| 6.00 | Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH | 35.42 | m3 | 11,763 ₹4.2 L | 11,825 ₹4.2 L |
| 7.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 33.57 | m3 | 801 ₹26,889.57 | 825 ₹27,695.25 |
| 8.00 | Provision for HM Stone | 1 | Rm | 574 ₹574 | 600 ₹600 |
| 9.00 | Provision for Name Board Charges | 1 | Nos | 3,000 ₹3,000 | 3,125 ₹3,125 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 2,25,604 ₹2.3 L | 2,31,512 ₹2.3 L |
Tender Value
₹14.8 L
EMD Value
₹15,000
Closing Date
9 Mar 2026, 3:00 pmClosed
Block Development office VP
Block Development office VP Veppur
Upgradation of the Road From Varagur SC Street Old Colony Road H/O Varagur Panchayat. Under ITPHDS 2025/2026
2026_RDTN_669849_6
B8/709/2026 Date 02.03.2026
Open Tender
Civil Works
90 days
Block Development office Veppur
As Per Tender Documents
2 documents required · 2 mandatory
₹0
₹15,000
9 Mar 2026
4 Mar 2026
9 Mar 2026
4 Mar 2026
9 Mar 2026
4 Mar 2026
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Provision for HM Stone
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.91 MB
Part.pdf
Tender Documents • 0.23 MB
BOQ_805031.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid