Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Finance | -15.10% | ₹1.4 L | L1 | Admitted-Finance |
| 2 | L2₹1.4 L+₹204.08 (0.14%)Admitted-Finance | -14.98% | ₹1.4 L+₹204.08 (0.14%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 L+₹7,822.93 (5.42%)Admitted-Finance | -10.50% | ₹1.5 L+₹7,822.93 (5.42%) | L3 | Admitted-Finance |
| 4 | L4₹1.5 L+₹7,907.96 (5.48%)Admitted-Finance | -10.45% | ₹1.5 L+₹7,907.96 (5.48%) | L4 | Admitted-Finance |
| 5 | L5₹1.7 L+₹29,080.90 (20.1%)Admitted-Finance | +2.00% | ₹1.7 L+₹29,080.90 (20.1%) | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
25 Jul 2026, 11:00 amClosed
Executive Engineer JS PHE Mech. Rural Div. Sgr.
Executive Engineer JS PHE Mech. Rural Div. Sgr.
Annual Framework/Rate Contract for Repairs/replacements to Rising mains, Valves and allied equipments installed at different WSSs of Jal Shakti (PHE) Mechanical Rural Division Srinagar
2026_PHE_315814_1
PHE/MRD/TS 15 OF 07/2026
Open Tender
Miscellaneous Works
Percentage
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Executive Engineer JS PHE Mech. Rural Div. Sgr.
₹10,000
31 Aug 2026
13 Jul 2026
25 Jul 2026
13 Jul 2026
25 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of excavated earth up to 1 m from cutting edge: | |||||
| 1.01 | All kinds of soil : | - | - | - | - |
| 1.02 | Lead upto 01 m from cutting edge. | - | Cum | - | - |
| 1.03 | 25m Lead upto 01m from cutting edge. | - | Cum | - | - |
| 1.04 | Ordinary Rock | - | - | - | - |
| 1.05 | Lead upto 01 m from cutting edge. | - | Cum | 1 | - |
| 1.06 | 25m Lead upto 01m from cutting edge. | - | Cum | 1 | - |
| 2Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of excavated earth as directed, within a lead of 50 metres: | |||||
| 2.01 | All kinds of soil : | - | Cum | - | - |
| 2.02 | Ordinary Rock | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_1026257.xls
BOQ • 0.42 MB
NIT15.pdf
PDF • 0.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .