Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹21 L+₹1.2 L (6.06%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹21.6 L+₹1.8 L (9.09%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹22.4 L+₹2.6 L (13.1%)Rejected-AOC | L4 | Rejected-AOC L4 |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
12 Feb 2025, 3:00 pmClosed
SE BRIDGES CHAMBER
SE BRIDGES GREATER CHENNAI CORPORATION RIPON BUILDING AMMA MALIGAI 5TH FLOOR CHENNAI
Selection of Consultant to prepare Detailed Feasibility Report DFR for the proposed construction of Cable Stayed Bridge connecting Srinivasapuram and Urur kuppam across Adyar river in lieu of the Broken Bridge in Div171 and 174, Zone 13
2025_CoC_521725_1
Br.D.C.No.B3/1100/2024
Limited
Civil Works
Works
45 days
Chennai
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹20,000
26 Feb 2025
30 Jan 2025
13 Feb 2025
30 Jan 2025
12 Feb 2025
30 Jan 2025
eProcurement System Government of Tamil Nadu Created By: KAVITHA SARAVANAN Created Date/Time: 13-Feb-2025 03:50 PM Tender Title: Selection of Consultant to prepare Detailed Feasibility Report DFR for the proposed construction of Cable Stayed Bridge connecting Srinivasapuram and Urur kuppam across Adyar river in lieu of the Broken Bridge in Div171 and 174, Zone 13 Tender ID: 2025_CoC_521725_1
Tender Inviting Authority: Superintending Engineer/ Bridges
Name of Work: Selection of Consultant to prepare Detailed Feasibility Report (DFR) for the proposed construction of Cable Stayed Bridge connecting Srinivasapuram and Urur kuppam across Adyar river in lieu of the Broken Bridge in Div-171 & 174, Zone 13
Contract No:Br.D.C.No.B3/1100/2024
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 Prime Meridian Surveys Pvt Ltd (GSTN-33AAECP5009R1Z4) BID ID -1243863 2000000.00 8.00 2160000.00 Twenty One Lakh Sixty Thousand
2.00 ALGATECH ENGINEERING AND CONSULTANTS PRIVATE LIMITED (GSTN-NA) BID ID -1247560 2000000.00 12.00 2240000.00 Twenty Two Lakh Fourty Thousand
3.00 CROSS SURVEY & CONSULTANTS (GSTN-NA) BID ID -1242393 2000000.00 5.00 2100000.00 Twenty One Lakh
4.00 Boulevard Infradesign Consultants LLP (GSTN-NA) BID ID -1242121 2000000.00 -1.00 1980000.00 Ninteen Lakh Eighty Thousand
Lowest Amount Quoted BY: Boulevard Infradesign Consultants LLP(1980000.00)
BOQ Summary Details Tender Title: Selection of Consultant to prepare Detailed Feasibility Report DFR for the proposed construction of Cable Stayed Bridge connecting Srinivasapuram and Urur kuppam across Adyar river in lieu of the Broken Bridge in Div171 and 174, Zone 13 Tender ID: 2025_CoC_521725_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Boulevard Infradesign Consultants LLP (BID ID -1242121) 1980000.00 L1
2 CROSS SURVEY & CONSULTANTS (BID ID -1242393) 2100000.00 L2
3 Prime Meridian Surveys Pvt Ltd (BID ID -1243863) 2160000.00 L3
4 ALGATECH ENGINEERING AND CONSULTANTS PRIVATE LIMITED (BID ID -1247560) 2240000.00 L4
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_620940.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .