Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹12.4 L+₹59,255 (5.03%)Accepted-AOC NO 56 4 625 010 | 625010 | L2 | Accepted-AOC L1 | |
| 2 | L1₹11.8 LRejected-AOC | L1 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SHRI BALAJI CONSTRUCTION L1 | R POONGAVANAM L2 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp. | 29 | m3 | 214.66 ₹6,225.01 Lowest | 225.46 ₹6,538.22 |
| 2.01 | Supplying and filling in foundation and basement with Quarry Dust in layers of 15cum thick well rammed and consolidated including watering complying with std. specification etc. | 17.5 | m3 | 418.8 ₹7,329.08 Lowest | 439.88 ₹7,697.84 |
| 3.01 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete. | 6 | m3 | 5,858.62 ₹35,151.73 Lowest | 6,153.4 ₹36,920.39 |
| 4.01 | Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides) | 40 | m2 | 1,123.78 ₹44,951.31 Lowest | 1,180.33 ₹47,213.04 |
| 5.01 | Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Vertical Portion Only) using steel plates10m2. | 23 | m2 | 1,348.44 ₹31,014.01 Lowest | 1,416.28 ₹32,574.49 |
| 6.01 | Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete in F&B | 15 | m3 | 9,681.48 ₹1,16,177.82 Lowest | 10,168.61 ₹1,22,023.31 |
| 7.01 | Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). Below 16mm Dia | 960 | kg | 91.87 ₹88,197.53 Lowest | 96.5 ₹92,635.2 |
| 8.01 | Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Lintel & Sunshade) using steel plates10m2. Bottom Only | 56 | m2 | 1,123.78 ₹62,931.83 Lowest | 1,180.33 ₹66,098.26 |
| 9.01 | Brick work in CM 1:5 (One cement and five sand) using country bricks of size 8 3/4"X4 1/2"X2" including curing etc., complete For Foundation and Basement. | 3.5 | m3 | 6,540.37 ₹22,891.29 Lowest | 6,869.45 ₹24,043.06 |
| 10.01 | Brick work in CM 1:5 (One cement and five sand) using country bricks of size 8 3/4"X4 1/2"X2" including curing etc., complete complying with standard specification For Super Structure in GF. | 22 | m3 | 6,635.81 ₹1,45,987.79 Lowest | 6,969.69 ₹1,53,333.18 |
Tender Value
₹11.8 L
EMD Value
₹11,779
Closing Date
10 Sept 2025, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai , Thallakulam , Madurai
Construction of Ration shop Ponnagaram broadway in ward no 56
2025_MAWS_599394_1
E7 / EST. 155 (MLA-C) / 25-26
Open Tender
Civil Works
Lump-sum
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹11,779
29 Oct 2025
1 Sept 2025
10 Sept 2025
1 Sept 2025
10 Sept 2025
1 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .