Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 CrAccepted-AOC | ₹8.5 Cr Quoted ₹8.6 Cr | L1 | Accepted-AOC BOND |
| 2 | L2₹8.7 Cr+₹10.5 L (1.22%)Rejected-Finance GARHI ROAD MOHALLA KASHIPURAM GARHI ROAD LAKHIMPUR KHERI UTTAR PRADESH 262701 | KHERI | UTTAR PRADESH | 262701 | ₹8.7 Cr+₹10.5 L (1.22%) | L2 | Rejected-Finance L2 |
Tender Value
₹9.0 Cr
EMD Value
₹18.0 L
Closing Date
15 Jan 2025, 12:00 pmClosed
Superintending Engineer
Pratapgarh Circle, PWD, Pratapgarh
Widening and Strengthning of Lalgopalganj se pithipur via bedhan gopalpur, gandhi chauraha, bhaisa chauraha Road (ODR) in District Pratapgarh FY -2024-25(With five year Maintainance).(3)
2025_CEALD_990939_1
5745/93C/etendering/P.F.C/2024 Dt 02.12.2024
Open Tender
Civil Works
Item Rate
365 days
pratapgarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹18.0 L
Pratapgarh Circle, PWD, Pratapgarh
19 Mar 2025
8 Jan 2025
15 Jan 2025
8 Jan 2025
15 Jan 2025
8 Jan 2025
10 Jan 2025
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m as per morth specification no. 301. icluding cost of all labour, material . for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement.as per morth specification no. 305 including cost of all labour, material. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Construction of embankment with approved material obtained from right of way with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Morth specification no. 305. (without Tippers) icluding cost of all labour, material. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per Morth specification no. 401. icluding cost of all labour, material and royalty. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, as per clause 406. icluding cost of all labour, material and royalty. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying of 1% OPC cment and 3.5% emulsion in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. icluding cost of all labour, material and royalty . for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. as per SI-503 (For BC). icluding cost of all labour, material for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing and laying bituminous concrete (40 mm) with higher capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ VG-30 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. icluding cost of all labour, materia land royalty. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, ackfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.as per Morth specification no. 3.13 (304). icluding cost of all labour, material. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. as per Sl No-12.04. icluding cost of all labour, material and royalty. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing and laying 40 mm gauge brick ballast below pipe and in sides. icluding cost of all labour, material . for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing and Laying Relnforced Cement Concrete Plpe NP3 as per design in Double Row. Providing and Laying Relnforced Cement Concrete Pipe(350 mm dia) NP3 for culverts on first class bedding of granular material in double row including fixing collar with cement morter 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. icluding cost of all labour, material . for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing and Laying Relnforced Cement Concrete Plpe NP3 as per design in Double Row. Providing and Laying Relnforced Cement Concrete Pipe(600 mm dia) NP3 for culverts on first class bedding of granular material in double row including fixing collar with cement morter 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per clause 1106. icluding cost of all labour, material . for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing and Laying Relnforced Cement Concrete Plpe NP3 as per design in Double Row. Providing and Laying Relnforced Cement Concrete Pipe(1000 mm dia) NP3 for culverts on first class bedding of granular material in double row including fixing collar with cement morter 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. icluding cost of all labour, material . for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications as per Sl No-13.1. icluding cost of all labour, material . for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Pointing with cement mortar (1:3 ) on brick work in substructure as per Morth Specifications as per Sl No-13.02. icluding cost of all labour, material . for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Morth Specifications as per Sl No-13.03. icluding cost of all labour, material. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Reinforced Cement Concrete(M-20) in Open Foundation complete as per Drawing and Morth Specifications. as per Sl No-12.8. icluding cost of all labour, material and royalty. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawing and technical specifications as per Morth Specifaicton 12.42 (1600) icluding cost of all labour, material . for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
M/S RUDRA CONSTRUCTIONS (BID ID -4852200)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1749932.xls
BOQ • 0.29 MB
160326852.pdf
Tender Documents • 0.48 MB
160326854.pdf
Tender Documents • 0.41 MB
160326858.html
Tender Documents • 0.06 MB
AddendumSBD.pdf
Tender Documents • 1.83 MB
IFB.pdf
Tender Documents • 1.15 MB
SBD_Part_1.pdf
Tender Documents • 1.06 MB
SBD_Part_2.pdf
Tender Documents • 0.74 MB
SPECIALcondition.pdf
Tender Documents • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .