Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance | -43.70% | ₹2.7 L | L1 | Admitted-Finance |
| 2 | L2₹2.9 L+₹22,559.81 (8.35%)Admitted-Finance | -39.00% | ₹2.9 L+₹22,559.81 (8.35%) | L2 | Admitted-Finance |
| 3 | L3₹4.6 L+₹1.9 L (68.7%)Admitted-Finance | -5.00% | ₹4.6 L+₹1.9 L (68.7%) | L3 | Admitted-Finance |
Tender Value
₹4.8 L
EMD Value
₹9,600
Closing Date
9 Sept 2026, 6:00 pmClosed
Executive Engineer PWD RandB PROJECT DIVISION III
Office of the PWD RandB PROJECT DIVISION III JAMMU
Repair/Renovation of Govt. Qtr. no. 40 B at Gandhi Nagar Jammu. CNo-180 NP
2026_PWDJK_323252_1
Short e-NIT No. 55 of 2026-2027 Dated 02-09-2026
Open Tender
Civil Works
Percentage
45 days
JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RandB PROJECT DIVISION III
₹9,600
Office of the PWD RandB PROJECT DIVISION III JAMMU
21 Sept 2026
2 Sept 2026
10 Sept 2026
2 Sept 2026
9 Sept 2026
2 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:4:8 or richer mix (i/c equivalent design mix) | 1.15 | cum | 1,064.55 | ₹1,224.23 |
| 2 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead. For thickness of tiles 10 mm to 25 mm | 35.97 | sqm | 57 | ₹2,050.29 |
| 3 | Providing and laying in position Cement Concrete of specified grade excluding the cost of centring and shuttering, all work ypto plinth level (1:4:8) 1 cement:4 coarse sand:8 graded stone aggreagate 40mm nominal size (crusher) | 1.15 | Cum | 5,202.9 | ₹5,983.33 |
| 4 | Providing and laying in position Cement Concrete of specified grade excluding the cost of centring and shuttering, all work ypto plinth level (1:3:6) 1 cement:3 coarse sand:6 graded stone aggreagate 20mm nominal size (crusher) | 0.38 | cum | 5,733.6 | ₹2,178.77 |
| 5 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead. | 30.11 | sqm | 38.9 | ₹1,171.28 |
| 6 | 15mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | 35.69 | sqm | 306.85 | ₹10,951.48 |
| 7 | Brick work with common burnt clay F.P.S (non modular) bricks of class designation 75 in cement mortar 1:6(1 cement : 6 fine sand). Foundation and plinth. | 0.96 | cum | 7,571.55 | ₹7,268.69 |
| 8 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 0.96 | cum | 1,455.65 | ₹1,397.42 |
| 9 | Providing and applying white cement based putty of specified thickness, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. 2mm thick | 18.26 | sqm | 181.05 | ₹3,305.97 |
| 10 | Finishing walls with acrylic smooth exterior paint of required shade on New work (Two or more coats applied @ 1.67 liter/10sqm over and including priming coat of exterior primer applied @ 2.20kg/10sqm) | 10.73 | sqm | 185.2 | ₹1,987.2 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.72 MB
BOQ_1087313.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .