Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹3.6 L+₹38,744 (12.2%)Rejected-Finance 691 INDUSTRIAL AREA PHASE II CHANDIGARH 160 002 | CHANDIGARH | CHANDIGARH | CHANDIGARH | 160002 | L2 | Rejected-Finance Not being L1 | |
| 3 | L3₹3.6 L+₹46,092 (14.5%)Rejected-Finance 1723 GUPTA AND SONS SECTOR 39 B CHANDIGARH CHANDIGARH CHANDIGARH 160036 UDYAM CH 01 0042756 | CHANDIGARH | CHANDIGARH | 160036 | L3 | Rejected-Finance Not being L1 | |
| 4 | L4₹3.9 L+₹72,812 (22.9%)Rejected-Finance | L4 | Rejected-Finance Not being L1 | |
| 5 | L5₹4.7 L+₹1.6 L (49.2%)Rejected-Finance | L5 | Rejected-Finance Not being L1 |
Tender Value
₹5.8 L
EMD Value
₹11,660
Closing Date
27 Mar 2021, 6:00 pmClosed
Sh Bharat Lal IDSE EE SG GE P
GE (P) CH Chandimandir
OUTSOURCING MANNING FOR WATER SUPPLY INSTALLATION FOR OPERATION VALVES CLEANING OF INSTALLATION UNDER GE P CH CHANDIMANDIR
2021_MES_426416_1
GE (P) CH/CHM-17/2020-21
Open Tender
Miscellaneous Works
Item Rate
334 days
GE (P) CH Chandimandir
Class E Cat d(v)
9 documents required · 9 mandatory
₹300
Yes
GE (P) CH Chandimandir
₹11,660
Yes
25 Jun 2021
27 Feb 2021
29 Mar 2021
27 Feb 2021
27 Mar 2021
13 Mar 2021
Amount
Outsourcing of water boosting installation , its cleaning and in help to attend the daily complaints at Command Hospital. Contractor will detail two helpers to attend the daily complaints, cleaning of water supply installation , cleaning of water supply pipe lines blockage, cleaning of sluice valve pits in CH area and other motors installed in CH area in one shift ( each day shift of eight hours) per day throughout the contract period for duration of 334 days ( including on sunday and holidays) to maintain smooth functioning of pumping and distribution of water supply all as specified and directed at site by Engineer-in-charge.
To maintain the daily complaints register and keep daily upto date record daily as approved by Engineer-in-Charge and submit the record accordingly.
Compulsory follow preventive maintenance for water supply installation.(As directed by Engr in charge)
Minimum 02 Nos of helpers each day for one shifts of 8 hours.
To keep area of Water boosting installation, Bldg, toilet & surroundings neat and clean. Panel recovery at the rate of Rs 250 per day will be recovered in case installation and surroundings found unsatisfactory by JE/ENGR-IN-CHARGE.
Contractor will display Safety chart, Do's and Dont's, First aid box with desired medicine.
If Contractor fails to repair/replace any faulty items within a reasonable time or given time, same shall be got done at risk and cost of the contractor without any formal communication besides the recovery of penalty.
The contractor shall comply with existing labour laws, IE rules, Factory act Etc in totality and deptt shall not be held responsible for any lapse.
Maintenance and upkeep of measuring instruments as fitted inside installation.
Contractor will issue uniform for each tradesman/helper as colour approved by the GE within 15 days of commencement of work and he will submit purchase voucher for uniform to the Engineer-in-Charge. If he fails to do so, Rs 100.00 for each tradesman/helper per shift per person regularly will be deducted from the RAR after the 15 days of commencement of work.
Contractor has to consider minimum wages act enacted by Govt of India. The contractor shall be bound to pay as per the minimum wages and all other benefits fixed by statutory body to the employees during the currency of the work and contractor's quoted rates shall be deemed to be inclusive of all these factors.Contractor will have to submit/maintain wages register,attendance register,duty roster and log sheets for the same. No claim whatsoever on this account shall be entertained.
PARTAP ENGINEERING WORKS
M/S Gupta and Sons
M/S Trilok chand sharma
M/S BALWINDER SINGH
Bharat Enterprises
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .