Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC | ₹5.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.5 L+₹2,777.49 (0.51%)Rejected-AOC | ₹5.5 L+₹2,777.49 (0.51%) | L2 | Rejected-AOC L2 |
| 3 | L3₹5.5 L+₹3,888.48 (0.71%)Rejected-AOC | ₹5.5 L+₹3,888.48 (0.71%) | L3 | Rejected-AOC L3 |
Tender Value
₹5.6 L
EMD Value
₹55,550
Closing Date
20 May 2026, 3:00 pmClosed
chief Engineer nagar nigam saharanpur
chief Engineer nagar nigam saharanpur
construction of CC road and nali from rahim genrl store to kasim house in ward no 56.
2026_NNSAH_1148992_1
6248 B
Open Tender
Civil Works
Percentage
30 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹826
₹55,550
23 Jul 2026
16 May 2026
21 May 2026
16 May 2026
20 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling cement concrete or brick or granolithic floors including base concrete and including stacking of dismantled materias as direted by the Engineer-in-charge within a distance of 60 metre (200 feet). | 234 | m2 | 38 | ₹8,892 |
| 2 | Dismantling cement concrete or brick or granolithic floors including base concrete and including stacking of dismantled materias as direted by the Engineer-in-charge within a distance of 60 metre (200 feet). | 5.38 | m3 | 400 | ₹2,152 |
| 3 | Earthwork in cutting or in embankment in ordinary soil in all complete as per S.I. No. 251-a | 26.83 | m3 | 90 | ₹2,414.7 |
| 4 | disposal of waste malba form site upto 5 km i/c allcomp work | 49 | m3 | 130 | ₹6,370 |
| 5 | Cement Concrete with 4cm gauge approved stone grit, coarse sand & cement in the proportion of 8:4:1 including supply of all materials ,labour, Tools & plants etc .required | 16.77 | m3 | 4,850 | ₹81,334.5 |
| 6 | P.C.C 1:6:12 with in cement and fine sand and 40 mm gauge brick ballast in all work complete.(S.I. No. 273) | 6.71 | m3 | 2,985 | ₹20,029.35 |
| 7 | M-150 class brick work in 1:4 cement and fine sand mortar in all complete(S.I. No. 305) | 0.92 | m3 | 4,690 | ₹4,314.8 |
| 8 | 12mm thick plaster 1:4 cement and Fine sand mortar in all complete (SI. no. 584) | 11.6 | m2 | 165 | ₹1,914 |
| 9 | P.C.C. 1:2:4 cement course sand and 20 mm gauge stone grit all work complete (S.I. No. 279 (a)) | 0.12 | m3 | 5,750 | ₹690 |
| 10 | Cemant concrete with 4cm Gauge approved stone grit in coarse sand and cemant in Proportion of 4:2:1 in including supply of all matrial labour and tools and plant for proper complition of work (S.I.No. 279A) | 20.12 | m3 | 7,300 | ₹1,46,876 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.02 MB
BOQ_2150800.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .