Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accepted |
| 2 | Accepted-Technical | Accepted-Technical Accepted |
| 3 | Accepted-Technical | Accepted-Technical Accepted |
| 4 | Accepted-Technical | Accepted-Technical Accepted |
Tender Value
Refer Docs
EMD Value
₹7,948
Closing Date
21 Sept 2026, 4:00 pmClosed
DFO SF Div Srinagar
Sonwar Srinagar
Dismantling and Refixation of 361 Tree Guards under State Capex for the year 2026-27 Location Khan Sahib to Beerwah Road District Budgam
2026_FD_324381_1
2026_SFD_BUDTG
Open Tender
Agricultural or Forestry
Percentage
70 days
Budgam
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
0406-Forest
₹7,948
28 Sept 2026
12 Sept 2026
22 Sept 2026
12 Sept 2026
21 Sept 2026
12 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling/Refixation of 361 Tree Guards | - | - | - | - |
| 2 | Dismantling of existing/available iron tree guards incl. cutting from one side, breaking of concrete work etc | 361 | NO | 95 | ₹34,295 |
| 3 | Mechanical Carriage of dismantled tree guards upto repair/working site over an average lead of 5kms including loading/unloading | 361 | NO | 75 | ₹27,075 |
| 4 | a) Repair of dismantled tree guards incl. straightening etc | 361 | NO | 170 | ₹61,370 |
| 5 | b) Cost of Iron 05% of 17 Kg's Tree Guard incl. labour charges etc @ Rs. 138.20/Kg as per SSR-22 | 361 | NO | 102 | ₹36,822 |
| 6 | Earthwork in excavation of 1444 Nos of pits of size 6"x6"x1'for erection of 361 Nos of tree guards and 361 pits of size 1.5x1.5x1.5fts for planting of plants and disposal of excavated earth upto 1m and dispose earth to be leveled and dressed @ Rs. 479.30 / cum as per SSR-22 = 0.123 cum /Tree Guard | 361 | NO | 53 | ₹19,133 |
| 7 | Stone soling incl. all caraiges of size 3"x6"x6" for 4 No's of pits = 0.007 cum/Tree Guard | 361 | NO | 7 | ₹2,527 |
| 8 | Providing/Laying in position cement concrete 1:2:4 mixed ( incl. carriage chargs of material) for fixing of 361 tree guards in 300 pits of size 6"x6"x1'. @ Rs 6591.25/cum as per SSR-22 = 0.028 cum/Tree Guard | 361 | NO | 185 | ₹66,785 |
| 9 | Cost/ carriage of good earth(1 Cft ) and humus (2cfts) and carriage of mixed material upto site for 361 tree guards | 361 | NO | 50 | ₹18,050 |
| 10 | Planting of conifer/Ornamental Polybag Plants( at least 3 years old) in pits of size 45x45x45 cms with water harvesting structures. | 361 | NO | 29.34 | ₹10,591.74 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
BOQ_1094180.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .