| 1 | L1₹9.1 LAccepted-AOC | ₹9.1 L Quoted ₹9.4 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹9.9 L+₹53,092.32 (5.65%)Rejected-Finance LOWER DEVNAGAR VIKASNAGAR SHIMLA 09 | ₹9.9 L+₹53,092.32 (5.65%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹10.3 L+₹88,276.42 (9.40%)Rejected-Finance | ₹10.3 L+₹88,276.42 (9.40%) | L3 | Rejected-Finance Rejected |
| 4 | Rejected-Technical R O BRAGTA BHAWAN CHOTTA SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | - | - | Rejected-Technical Rejected |
| 5 | Rejected-Technical | - | - | Rejected-Technical Rejected |
Tender Value
₹9.3 L
EMD Value
₹18,600
Closing Date
21 Oct 2024, 5:00 pmClosed
Executive Engineer R B M C Shimla
Executive Engineer R B M C Shimla
Restoration of rain damages SH CO of damaged R wall in back side of B No R 8 Strawberry Hill ward No 28 Chhotta Shimla Phase I
2024_MC_94064_3
2778dated07102024
Open Tender
Civil Works
Item Rate
60 days
Shimla
please refer tender documents
7 documents required · 7 mandatory
₹413
Executive Engineer R B M C Shimla
₹18,600
22 Nov 2024
10 Oct 2024
22 Oct 2024
10 Oct 2024
21 Oct 2024
10 Oct 2024
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. Ordinary rock
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing : 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Stone filling behind retaining walls
P/L 100 mm dia PVC pipe for weep holes
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars
Carriage of material by mechanical transport including Loading & unloading & stacking of Muck/Debries in M.C. Dumping site at bharyal free of cost Tansporation charges will be paid extra (10km)
BHAW SINGH CHAUHAN
BILAL AHMED BUTT
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .