Loading…
Loading…
Tender Value
₹8.5 L
EMD Value
₹21,200
Closing Date
8 Oct 2026, 4:30 pm
Public Works Department
PRAVEEN R HULJI
Annual Maintanace of M-Timmapur-Kalmada-Aneguddi road from km 0.00 to 9.24 in Ramdurg Taluka for the year 2026-27
PWD/2026-27/RD/WORK_INDENT42584
PWD/2026-27/RD/WORK_INDENT42584
Open
Roads
Electronic Documents, First(One Cover)
PWD Division Office Belagavi
6 documents required · 6 mandatory
₹500
₹21,200
18 Sept 2026
18 Sept 2026
7 Oct 2026
GOVERNMENT OF KARNATAKA
(PUBLIC WORKS DEPARTMENT)
COMMUNICATION & BUILDINGS
NORTH (ZONE) DHARWAD
EXECUTIVE ENGINEER
(Public Works Department)
BELGAUM DIVISION BELGAUM
Annual Maintanace of M-Timmapur-Kalmada-Aneguddi road from km 0.00 to 9.24 in Ramdurg Taluka for the year 2026-27
ESTIMATED COST RS :- 10.00 Lakhs
PARAGRAPH 130 (A) OF THE KARNATAKA PUBLIC WORKS DEPARTMENTAL CODE
Division. PWD.Belgaum Division.Belgaum
Sub - Division. PWD, Sub- Dn.Ramdurg.
Fund Head. 3054-MDR MAINTENANCE
Department Head.
Annual Maintanace of M-Timmapur-Kalmada-Aneguddi road from km 0.00 to 9.24 in Ramdurg Taluka for the year 2026-27
Estimated Cost (Rs. In Lakhs) Rs 10.00
Administratively sanctioned under No. Date.
Techanically sanctioned under No. Date.
Estimate prepared by
Checked by Shri.Ravikumar Nandihalli .AEE
Shri. 1) Chidananda koppada
3) Devareedy Tolagatti
Ku. 2) Anjum Pinjar
General Description
~: ಪ್ರತ್ಯೇಕವಾಗಿ ಲಗತ್ತಿಸಲಾಗಿದೆ :~
Assistant Executive Engineer, PWD,Sub-Dn.,Ramdurg Executive Engineer, PWD, Belgaum Dn.Belgaum
Annual Maintanace of M-Timmapur-Kalmada-Aneguddi road from km 0.00 to 9.24 in Ramdurg Taluka for the year 2026-27
ರಾಮದುರ್ಗ ತಾಲೂಕಿನ M-Timmapur-Kalmada-Aneguddi road from km 0.00 to 9.24 ರಸ್ತೆಯ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು ನಿರ್ವಹಣೆಗೆ ಪರಿಗಣಿಸಲಾಗಿದೆ. ಸದರಿ ರಸ್ತೆ ನಿರ್ವಹಣೆ ಮಾಡುವ ಕಾಮಗಾರಿಗಾಗಿ 2026-27 ನೇ ಸಾಲಿಗಾಗಿ ಸಿದ್ಧಪಡಿಸಿದ ಕ್ರಿಯಾ ಯೋಜನೆ ಕ್ರ.ಸಂ. 05 ರನ್ವಯ ಒಟ್ಟು ಮೊತ್ತ ರೂ.10.00 ಲಕ್ಷ ಲೆಕ್ಕ ಶೀರ್ಷಕೆ ಜಿಲ್ಲಾ ಮುಖ್ಯ ರಸ್ತೆ ನಿರ್ವಹಣೆ ಅಡಿಯಲ್ಲಿ ಅನುವು ಇರುತ್ತದೆ. ವಾಹನ ಸಂಚಾರದಿಂದ ಮತ್ತು ಮಳೆಯಿಂದಾಗಿ ರಸ್ತೆಯ ಮೇಲ್ಮೆಯ ಮೇಲೆ ಸಾಕಷ್ಟು ತಗ್ಗು ಗುಂಡಿಗಳು ಬಿದ್ದಿರುತ್ತದೆ. ಕಾರಣ ಅತೀ ಜರೂರ ಇರುವ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆಯನ್ನು ಮಾಡುವದು ಅವಶ್ಯಕವಿರುತ್ತದೆ. ಒದಗಿಸಿರುವ ಅನುದಾನಕ್ಕೆ ತಕ್ಕಂತೆ ರಸ್ತೆ ಭಾಗದ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆಯನ್ನು ಮತ್ತು ರಸ್ತೆ ಫರ್ನಿಚರಗಳ ಕಾಮಗಾರಿಗಳನ್ನು ಕೈಗೆತ್ತಿಕೊಳ್ಳಲಾಗಿದೆ.
ಈ ಅಂದಾಜು ಪತ್ರಿಕೆಯಲ್ಲಿ ಈ ಕೆಳಗಿನ ಅಂಶಗಳನ್ನು ಅಳವಡಿಸಲಾಗಿದೆ.
1) ಜಂಗಲ ತೆಗೆಯುವುದು.
2) ಎಸ್.ಡಿ.ಬಿ.ಸಿ. ನಿಂದ ಗುಂಡಿಗಳನ್ನು ತುಂಬುವುದು.
3) Road Furnitures ಒದಗಿಸುವದು.
4) ಕಿ.ಮಿ. ಕಲ್ಲುಗಳಿಗೆ ಬಣ್ಣ ಬಳಿಯುವದು.
5) ಅಡ್ಡಮೋರಿಗಳ ಗೊಡೆಗಳಿಗೆ ಸುಣ್ಣ ಬಣ್ಣ ಬಳಿಯುವದು.
6) ರಸ್ತೆ ಬಾಹುಗೆ ಮೊರಮ್ ಅಳವಡಿಸುವದು.
ಈ ಅಂದಾಜು ಪತ್ರಿಕೆಯನ್ನು ಕರ್ನಾಟಕದ 2023-24ನೇ ಸಾಲಿನ (2025-26ನೇ ಸಾಲಿಗೆ ಮುಂದುವರೆದ) ರಾಜ್ಯವ್ಯಾಪಿ ಏಕರೂಪ, ಕಟ್ಟಡ, ರಸ್ತೆ & ಸೇತುವೆ ಅನುಸೂಚಿತ ದರಪಟ್ಟಿಯಂತೆ ಈ ಅಂದಾಜು ಪತ್ರಿಕೆಯನ್ನು ನಿಗಧಿಪಡಿಸಿದ ಒಟ್ಟು ಮೊತ್ತ ರೂ. 10.00 ಲಕ್ಷಗಳಿಗೆ ತಯಾರಿಸಲಾಗಿದೆ.
ಸಹಾಯಕ ಕಾರ್ಯನಿರ್ವಾಹಕ ಇಂಜಿನೀಯರ್
ಲೋಕೋಪಯೋಗಿ ಇಲಾಖೆ
ಉಪ ವಿಭಾಗ ರಾಮದುರ್ಗ
Annual Maintanace of M-Timmapur-Kalmada-Aneguddi road from km 0.00 to 9.24 in Ramdurg Taluka for the year 2026-27
RECAPTULATION SHEET
Sl.no P a r t I c u l a r s A m o u n t
1 PART A- Maintenance of Road 845689.19
3 Misc and Others 2086.76 2074.50
PWD/2026-27/RD/WORK_INDENT42584
Assistant Executive Engineer, PWD,Sub-Dn.,Ramdurg Executive Engineer, PWD,Belgaum Dn.Belgaum
Annual Maintanace of M-Timmapur-Kalmada-Aneguddi road from km 0.00 to 9.24 in Ramdurg Taluka for the year 2026-27
S.No Item Qty Unit Rate Amount
Road Maintenance
1 Clearing and Grubbing Road Land-Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness By Mechanical Means using Motor Grader- In area of light jungle (P.No. 9, I.No. 2.5a , Vol-3) 443.52 100 m2 393.00 174303.36
2 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Note: The earth stripped from earthen shoulders to be dumped on the side slopes locally for disposal (P.No. 91, I.No. 10.3, Vol-3) 1016.40 sqm 39.00 39639.60
3 The maintenance of drains include erosion,repair,clearing,cleaning,reshaping,regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (P.No. 147, I.No. 16.19, Vol-3) 1848.00 m 6.00 11088.00
4 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. (P.No. 93, I.No. 10.15(i), Vol-3) 450.45 Sqm 388.00 174774.60
5 Patching of Deep Potholes using WBM Gr lI & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with Type-B Sereenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.(P.No. 93, I.No. 10.15(ii), Vol-3) 415.80 Sqm 635.00 264033.00
6 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. 1732.50 sqm 97.00 168052.50
7 Water Bound Macadam Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification includingspreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. A) By Manual Means (ii) Grading-II (53 mm to 22.4 mm) (a) Using Screening Crushable type such as Moorum or Gravel 5.63 Cum 2453.00 13798.13
Total Rs:- 845689.19
Road Maintenance (Total):- 845689.19
Assistant Executive Engineer
PWD,Sub-Dn.,Ramdurg
Annual Maintanace of M-Timmapur-Kalmada-Aneguddi road from km 0.00 to 9.24 in Ramdurg Taluka for the year 2026-27
PART A- Road Maintenance
S.No Item Nos Measurements Qty Unit
I) ROAD MAINTENANCE
1 Clearing and Grubbing Road Land-Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness By Mechanical Means using Motor Grader- In area of light jungle (P.No. 9, I.No. 2.5a , Vol-3)
(3) Mullur-Maradagi from km 0.00 to 10.50 and 12.33 to 14.20 1
Maintanance length12.87 kms 1
Deduct 40% voids 1 -10296.00
Deduct village limits 1
(6) Kalahal-Chikoppa road from km 0.00 to 4.20
Maintanance length 4.20 kms
Deduct 40% voids -6720.00
Deduct village limits
(7) Hosakeri-Bennur road from km 0.00 to 5.30
Maintanance length 5.30 kms
Deduct 40% voids -8480.00
Deduct village limits
(8) Naganur-Naganur Tandar road from km 0.00 to 4.00
Maintanance length 4.00 kms
Deduct 40% voids -6400.00
Deduct village limits
(10) Halagatti-Mulangi-Hiretadasi road from km 0.00 to 11.36
Maintanance length 11.36 kms
Deduct 40% voids -18176.00
Deduct village limits
(13) Ramdurg-Dodamangadi road from km 0.00 to 0.55
Maintanance length 0.55kms
Deduct 40% voids -880.00
Deduct village limits
(14) Mullur-Mudenakoppa-Chikkanaragund road from km 0.00 to 7.42
Maintanance length 7.42 kms
Deduct 40% voids -11872.00
Deduct village limits
.(17) Chikkoppa-Udachammanagar road from km 0.00 to 1.60
Maintanance length 1.6 kms
Deduct 40% voids -2560.00
Deduct village limits
(18) Jalikatti-Kittur-Kuruvinakoppa road from km 0.00 to 6.05
Maintanance length6.05 kms
Deduct 40% voids -9680.00
Deduct village limits
(20) Mudenur-Hanumapur-Umatar road from km 0.00 to 11.07
Maintanance length 11.07 kms
Deduct 40% voids -17712.00
Deduct village limits
(21) Aneguddi-Hanumapur-Channapur road from km 0.00 to 11.24
Maintanance length11.24 kms
Deduct 40% voids -17984.00
Deduct village limits
Pre Mansson And Post Mansoon
M-Timmapur-Kalmada-Aneguddi road from km 0.00 to 9.24
Maintanance length 9.24 kms
Deduct 40% voids -29568.00
Deduct village limits
(23) SH-34 to Channapur L Tanda road from km 0.00 to 3.20
Maintanance length 3.20 kms
Deduct 40% voids -5120.00
Deduct village limits
(28) Lakanayakankoppa to Shiddeshwar kolla road from km 0.00 to 1.37
Maintanance length 1.37 kms
Deduct 40% voids -2192.00
Deduct village limits
Lakhanyakanakoppa -2 300.00 2.00 -1200.00
Grand Total 44352.00 sqm
say in 100 sqm 443.52 100 sqm
2 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Note: The earth stripped from earthen shoulders to be dumped on the side slopes locally for disposal (P.No. 91, I.No. 10.3, Vol-3)
(3) Mullur-Maradagi from km 0.00 to 10.50 and 12.33 to 14.20
for maintenance as above 1 5% 12870.00 1.000 643.50
(6) Kalahal-Chikoppa road from km 0.00 to 4.20
for maintenance as above 1 5% 4200.00 1.000 210.00
(7) Hosakeri-Bennur road from km 0.00 to 5.30
for maintenance as above 1 5% 5300.00 1.000 265.00
(8) Naganur-Naganur Tandar road from km 0.00 to 4.00
for maintenance as above 1 5% 4000.00 1.000 200.00
(10) Halagatti-Mulangi-Hiretadasi road from km 0.00 to 11.36
for maintenance as above 1 5% 11360.00 1.000 568.00
(13) Ramdurg-Dodamangadi road from km 0.00 to 0.55
for maintenance as above 1 5% 550.00 1.000 27.50
(14) Mullur-Mudenakoppa-Chikkanaragund road from km 0.00 to 7.42
for maintenance as above 1 5% 7420.00 1.000 371.00
.(17) Chikkoppa-Udachammanagar road from km 0.00 to 1.60
for maintenance as above 1 5% 1600.00 1.000 80.00
(18) Jalikatti-Kittur-Kuruvinakoppa road from km 0.00 to 6.05
for maintenance as above 1 5% 6050.00 1.000 302.50
(20) Mudenur-Hanumapur-Umatar road from km 0.00 to 11.07
for maintenance as above 1 5% 11070.00 1.000 553.50
(21) Aneguddi-Hanumapur-Channapur road from km 0.00 to 11.24
for maintenance as above 1 5% 11240.00 1.000 562.00
M-Timmapur-Kalmada-Aneguddi road from km 0.00 to 9.24
for maintenance as above 1 11% 9240.00 1.000 1016.40
(23) SH-34 to Channapur L Tanda road from km 0.00 to 3.20
for maintenance as above 1 5% 3200.00 1.000 160.00
(28) Lakanayakankoppa to Shiddeshwar kolla road from km 0.00 to 1.37
for maintenance as above 1 5% 1370.00 1.000 0.00
3 The maintenance of drains include erosion,repair,clearing,cleaning,reshaping,regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (P.No. 147, I.No. 16.19, Vol-3)
(3) Mullur-Maradagi from km 0.00 to 10.50 and 12.33 to 14.20
for maintenance as above 1 5% 12870.00 1.000 643.50
(6) Kalahal-Chikoppa road from km 0.00 to 4.20
for maintenance as above 1 5% 4200.00 1.000 210.00
(7) Hosakeri-Bennur road from km 0.00 to 5.30
for maintenance as above 1 5% 5300.00 1.000 265.00
(8) Naganur-Naganur Tandar road from km 0.00 to 4.00
for maintenance as above 1 5% 4000.00 1.000 200.00
(10) Halagatti-Mulangi-Hiretadasi road from km 0.00 to 11.36
for maintenance as above 1 5% 11360.00 1.000 568.00
(13) Ramdurg-Dodamangadi road from km 0.00 to 0.55
for maintenance as above 1 5% 550.00 1.000 27.50
(14) Mullur-Mudenakoppa-Chikkanaragund road from km 0.00 to 7.42
for maintenance as above 1 5% 7420.00 1.000 371.00
.(17) Chikkoppa-Udachammanagar road from km 0.00 to 1.60
for maintenance as above 1 5% 1600.00 1.000 80.00
(18) Jalikatti-Kittur-Kuruvinakoppa road from km 0.00 to 6.05
for maintenance as above 1 5% 6050.00 1.000 302.50
(20) Mudenur-Hanumapur-Umatar road from km 0.00 to 11.07
for maintenance as above 1 5% 11070.00 1.000 553.50
(21) Aneguddi-Hanumapur-Channapur road from km 0.00 to 11.24
for maintenance as above 1 5% 11240.00 1.000 562.00
M-Timmapur-Kalmada-Aneguddi road from km 0.00 to 9.24
for maintenance as above 1 20% 9240.00 1.000 1848.00
(23) SH-34 to Channapur L Tanda road from km 0.00 to 3.20
for maintenance as above 1 5% 3200.00 1.000 160.00
(28) Lakanayakankoppa to Shiddeshwar kolla road from km 0.00 to 1.37
for maintenance as above 1 5% 1370.00 1.000 0.00
4 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. (P.No. 93, I.No. 10.15(i), Vol-3)
(3) Mullur-Maradagi from km 0.00 to 10.50 and 12.33 to 14.20
(6) Kalahal-Chikoppa road from km 0.00 to 4.20
(7) Hosakeri-Bennur road from km 0.00 to 5.30
(8) Naganur-Naganur Tandar road from km 0.00 to 4.00
(13) Ramdurg-Dodamangadi road from km 0.00 to 0.55
(14) Mullur-Mudenakoppa-Chikkanaragund road from km 0.00 to 7.42
.(17) Chikkoppa-Udachammanagar road from km 0.00 to 1.60
(18) Jalikatti-Kittur-Kuruvinakoppa road from km 0.00 to 6.05
(20) Mudenur-Hanumapur-Umatar road from km 0.00 to 11.07
(21) Aneguddi-Hanumapur-Channapur road from km 0.00 to 11.24
M-Timmapur-Kalmada-Aneguddi road from km 0.00 to 9.24
(23) SH-34 to Channapur L Tanda road from km 0.00 to 3.20
(28) Lakanayakankoppa to Shiddeshwar kolla road from km 0.00 to 1.37 0.00
GRAND TOTAL 450.45 sqm
5 Patching of Deep Potholes using WBM Gr lI & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with Type-B Sereenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.(P.No. 93, I.No. 10.15(ii), Vol-3)
(3) Mullur-Maradagi from km 0.00 to 10.50 and 12.33 to 14.20
(6) Kalahal-Chikoppa road from km 0.00 to 4.20
(7) Hosakeri-Bennur road from km 0.00 to 5.30
(8) Naganur-Naganur Tandar road from km 0.00 to 4.00
(13) Ramdurg-Dodamangadi road from km 0.00 to 0.55
(14) Mullur-Mudenakoppa-Chikkanaragund road from km 0.00 to 7.42
.(17) Chikkoppa-Udachammanagar road from km 0.00 to 1.60
(18) Jalikatti-Kittur-Kuruvinakoppa road from km 0.00 to 6.05
(20) Mudenur-Hanumapur-Umatar road from km 0.00 to 11.07
(21) Aneguddi-Hanumapur-Channapur road from km 0.00 to 11.24
M-Timmapur-Kalmada-Aneguddi road from km 0.00 to 9.24
(23) SH-34 to Channapur L Tanda road from km 0.00 to 3.20
(28) Lakanayakankoppa to Shiddeshwar kolla road from km 0.00 to 1.37 0.00
6 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
(3) Mullur-Maradagi from km 0.00 to 10.50 and 12.33 to 14.20
(6) Kalahal-Chikoppa road from km 0.00 to 4.20
(7) Hosakeri-Bennur road from km 0.00 to 5.30
(8) Naganur-Naganur Tandar road from km 0.00 to 4.00
(10) Halagatti-Mulangi-Hiretadasi road from km 0.00 to 11.36
(13) Ramdurg-Dodamangadi road from km 0.00 to 0.55
(14) Mullur-Mudenakoppa-Chikkanaragund road from km 0.00 to 7.42
.(17) Chikkoppa-Udachammanagar road from km 0.00 to 1.60
(18) Jalikatti-Kittur-Kuruvinakoppa road from km 0.00 to 6.05
(20) Mudenur-Hanumapur-Umatar road from km 0.00 to 11.07
(21) Aneguddi-Hanumapur-Channapur road from km 0.00 to 11.24
(22) M-Timmapur-Kalmada-Aneguddi road from km 0.00 to 9.24
(23) SH-34 to Channapur L Tanda road from km 0.00 to 3.20
(28) Lakanayakankoppa to Shiddeshwar kolla road from km 0.00 to 1.37
M-Timmapur-Kalmada-Aneguddi road from km 0.00 to 9.24
Total 1732.50 Cum
7 Water Bound Macadam Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification includingspreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. A) By Manual Means (ii) Grading-II (53 mm to 22.4 mm) (a) Using Screening Crushable type such as Moorum or Gravel
(3) Mullur-Maradagi from km 0.00 to 10.50 and 12.33 to 14.20
in selected reaches 1 300.000 3.750 0.075 84.38
total 84.38 cum
(6) Kalahal-Chikoppa road from km 0.00 to 4.20
(7) Hosakeri-Bennur road from km 0.00 to 5.30
(8) Naganur-Naganur Tandar road from km 0.00 to 4.00
(10) Halagatti-Mulangi-Hiretadasi road from km 0.00 to 11.36
(13) Ramdurg-Dodamangadi road from km 0.00 to 0.55
(14) Mullur-Mudenakoppa-Chikkanaragund road from km 0.00 to 7.42
.(17) Chikkoppa-Udachammanagar road from km 0.00 to 1.60
(18) Jalikatti-Kittur-Kuruvinakoppa road from km 0.00 to 6.05
(20) Mudenur-Hanumapur-Umatar road from km 0.00 to 11.07
in selected reaches 1 5% 500.00 3.750 0.075 7.03
(21) Aneguddi-Hanumapur-Channapur road from km 0.00 to 11.24
M-Timmapur-Kalmada-Aneguddi road from km 0.00 to 9.24 1 10% 200.00 3.750 0.075 5.63
(23) SH-34 to Channapur L Tanda road from km 0.00 to 3.20
(28) Lakanayakankoppa to Shiddeshwar kolla road from km 0.00 to 1.37
grand total 5.63 cum
Annual Maintanace of M-Timmapur-Kalmada-Aneguddi road from km 0.00 to 9.24 in Ramdurg Taluka for the year 2026-27
PART B- Gang Men
S.No Item Nos Measurements Qty Unit
1 Employing Mazdoor for Maintenanceand Supervision of road (Zone II IV Un skilled)
(3) Mullur-Maradagi from km 0.00 to 10.50 and 12.33 to 14.20 1 12.87
(6) Kalahal-Chikoppa road from km 0.00 to 4.20 1 4.20
(7) Hosakeri-Bennur road from km 0.00 to 5.30 1 5.30 UÉÆuÁÚUÀgÀ ¢AzÀ ±À§jPÉÆ¼Àî gÀ¸ÉÛ
(8) Naganur-Naganur Tandar road from km 0.00 to 4.00 1 4.00 ¸ÀÄgÉèÁ£À ±À§jPÉÆ¼Àî gÀ¸ÉÛ
(10) Halagatti-Mulangi-Hiretadasi road from km 0.00 to 11.36 1 11.36
(13) Ramdurg-Dodamangadi road from km 0.00 to 0.55 1 0.55
(14) Mullur-Mudenakoppa-Chikkanaragund road from km 0.00 to 7.42 1 7.42
.(17) Chikkoppa-Udachammanagar road from km 0.00 to 1.60 1 1.6
(18) Jalikatti-Kittur-Kuruvinakoppa road from km 0.00 to 6.05 1 6.05
(20) Mudenur-Hanumapur-Umatar road from km 0.00 to 11.07 1 11.07
(21) Aneguddi-Hanumapur-Channapur road from km 0.00 to 11.24 1 11.24
(22) M-Timmapur-Kalmada-Aneguddi road from km 0.00 to 9.24 1 9.24
(23) SH-34 to Channapur L Tanda road from km 0.00 to 3.20 1 3.2
(28) Lakanayakankoppa to Shiddeshwar kolla road from km 0.00 to 1.37 1 1.37
Gang men per 30 km 89.470 3.00
Aug-2024 to Aug-2025 12 3.00 0.00 Man days
Assistant Executive Engineer
PWD,Sub-Dn.,Ramdurg
Lakhanyakanakoppa -2 300.00 2.00 -1200.00
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
for maintenance as above
Annual Maintanace of M-Timmapur-Kalmada-Aneguddi road from km 0.00 to 9.24 in Ramdurg Taluka for the year 2026-27
S.No Description of items Unit UNI S.R.2024-25 Rate as per S.R. Diff.in cost of Cement. Total Rate 18 perc GST Area weightage 0% Net Amount
P.No. Vol I.No . Const Diff.in cost Amount
I) ROAD MAINTENANCE
1 Clearing and Grubbing Road Land-Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness By Mechanical Means using Motor Grader- In area of light jungle (P.No. 9, I.No. 2.5a , Vol-3) 100 m2 9 3 2.5a 393.00 393.00 0.00 0.00 393.00
2 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Note: The earth stripped from earthen shoulders to be dumped on the side slopes locally for disposal (P.No. 91, I.No. 10.3, Vol-3) sqm 91 3 10.3 39.00 39.00 0.00 0.00 39.00
3 The maintenance of drains include erosion,repair,clearing,cleaning,reshaping,regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (P.No. 147, I.No. 16.19, Vol-3) m 147 3 16.19 6.00 6.00 0.00 0.00 6.00 The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. 135 20.20 3 4.55
4 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. (P.No. 93, I.No. 10.15(i), Vol-3) Sqm 93 3 10.15(i) 388.00 388.00 0.00 0.00 388.00
5 Patching of Deep Potholes using WBM Gr lI & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with Type-B Sereenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.(P.No. 93, I.No. 10.15(ii), Vol-3) Sqm 93 3 10.15(ii) 635.00 635.00 0.00 0.00 635.00
6 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. cum 91 3 10.2 97.00 97.00 0.00 0.00 97.00
7 Water Bound Macadam Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification includingspreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. A) By Manual Means (ii) Grading-II (53 mm to 22.4 mm) (a) Using Screening Crushable type such as Moorum or Gravel Cum 26 3 4.13 2453.00 2453.00 0.00 0.00 2453.00
8 Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom-Tack coat on Bituminous surface (P.No. 43 I.No.5.32, Vol-3) sqm 43 3 5.32 12.00 12.00 0.00 0.00 12.00
9 Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision. (P.No. 43, I.No. 5.31. Vol-3) Cum 43 3 5.31 10152.00 10152.00 0.00 0.00 10152.00
Part B - Gang men
1 Employing Mazdoor for Maintenanceand Supervision of road (Zone II IV Un skilled) per month as per SE bgm approved rate 19786.89 19786.89 0.00 0.00 0.00
Assistant Executive Engineer Executive Engineer
PWD,Sub-Dn.,Ramdurg PWD, Div.Belgaum.
Name of the Road :-ANEGUDDI - HANAMAPUR - CHANNAPUR (MDR)(RIS ID-RMG220)
Road Category: MDR Sub Division : RAMDURG Division : BELGAVI Circle : DHARWAD
ANEGUDDI CROSS ANEGUDDI HANAMAPUR CHENNAPUR CROSS
Carriage Way 5.50 m
Carriage Way 5.50 m WI(114308) under 5054 GSB-150mm,WMM-225mm-BM-50mm,SDBC-25mm For the year 2019-20 WI(128510) under 5054 GSB-200mm,WMM-225mm-BM-50mm,SDBC-25mm For the year TSP 2022-23 WI(153386) under 5054 GSB-200mm,WMM-225mm-BM-50mm,SDBC-25mm For the year 2022-23 More than 5 years MAINTENANCE WORK FOR THE YEAR OF 2026-27
3.75 m MAINTENANCE WORK FOR THE YEAR OF 2026-27
Last 5 Year development length 2026-27 Last 5 Year development length 2026-27 Last 5 Year development length 2026-27 MAINTENANCE WORK FOR THE YEAR OF 2026-27
Structure Chainage
Legends Desciption Silent Features 3).Proposed works under Annual Works 2025-26 2).Maintenance for 2026-27 Village/City Limit
Completed Works & Under DLP Lane Width Details Total Length (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) Name of Village/ City From To L (in Km)
Maintenance Works Under Annual Plan 2026-27 Single Lane 4.55 to 5.80 1.25 APPENDIX-E 0.00 0.00 RC 0.00 Last 5 Year development length 2024-25 0.00 2.10 Maint 2.10 aneguddi 2.92 3.40 0.49
Last 5 Year development length 2026-27 Intermediate lane 0.00 to 4.55, 5.80 to 11.24 9.99 0.00 0.00 RC 0.00 Last 5 Year development length 2024-25 2.10 2.92 Maint 0.82 Hanampur 6.00 6.40 0.400
Work Approved / progress 2026-27 Two lane 0 0.00 0.00 0.00 CC Road 0.00 Last 5 Year development length 2024-25 2.92 4.55 Maint 1.64 0.00
Works Eligible for Renewal Two lane + PS 0 0.00 Total Length (in Km) 0.00 More than 5 years Maintenance Work 4.55 11.24 Maint 6.69 0.00
Major Bridges Four lane 0 0.00 4). On going works Total Length (in Km) 11.24 0.00
Minor Bridges Major Bridges 0 HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) 0.00
CD Minor Bridges 0 SCP 0.00 0.00 Wd 0.00 Total Length (in Km) 0.89
Village/ City Name Railway Crossing 0 0.00 0.00 RC 0.00
Railway Crossing Overlap Length 0 0.00 0.00 0.00 CC Road 0.00
Total Length (in Km) 11.24 Total Length (in Km) 0.00
5). Eligible for Renewal
2026-27 Maintenance Abstract 1). Completed Works and under DLP HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km)
Description Length in KM HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) APPENDIX-E Renewal 0.00 0.00 Ren 0.00 No. Details Length Other Department Works
Last 5 Year development length 4.55 0.00 0.00 RC 0.00 1 1). Completed Works and under DLP 0.00 Under From To L (in Km)
0.00 0.00 RC 0.00 2 2).Maintenance for 2026-27 11.24 KRDCL 0.00
More than 5 Year development length 6.69 0.00 3 3).Proposed works under Annual Works 2025-26 0.00 KSHIP 0.00
0.00 4 4). On going works 0.00 SHDP 0.00
Total Maintenance Length 11.24 Total Length (in Km) 0.00 5 5). Eligible for Renewal 0.00 Total Length (in Km) 0.00
Total Length (in Km) 11.24
Total length of the road 11.24
(3) Mullur-Maradagi from km 0.00 to 10.50 and 12.33 to 14.20
For Maintenance Length 0.00 11.00 11.00 more than 5 years
0.00 less than 5 years
Total Maintenance Length 12.87
Total NFL length 0.00
Total DLP length
ongoing work 0.00
Total length of road 12.87
(6) Kalahal-Chikoppa road from km 0.00 to 4.20
For Maintenance Length 0.00 1.00 1.00 more than 5 years
1.00 1.90 0.90 less than 5 years
Total Maintenance Length 4.20
Total NFL length 0.00
Total DLP length
ongoing work 0.00
Total length of road 4.20
(7) Hosakeri-Bennur road from km 0.00 to 5.30
For Maintenance Length 0.00 5.30 5.30 more than 5 years
0.00 0.00 0.00 less than 5 years
Total Maintenance Length 5.30
Total NFL length 0.00
Total DLP length
ongoing work 0.00
Total length of road 5.30
(8) Naganur-Naganur Tandar road from km 0.00 to 4.00
For Maintenance Length 0.00 4.00 4.00 more than 5 years
0.00 0.00 0.00 less than 5 years
Total Maintenance Length 4.00
Total NFL length 0.00
Total DLP length
ongoing work 0.00
Total length of road 4.00
(10) Halagatti-Mulangi-Hiretadasi road from km 0.00 to 11.36
For Maintenance Length 0.00 11.36 11.36 more than 5 years
0.00 0.00 0.00 less than 5 years
Total Maintenance Length 11.36
Overlap Length 0.00 0.00 0.00
Total NFL length 0.00
Total DLP length
ongoing work 0.00 0.00 0.00
Total length of road 11.36
(13) Ramdurg-Dodamangadi road from km 0.00 to 0.55
For Maintenance Length 0.00 0.55 0.55 more than 5 years
0.00 0.00 0.00 less than 5 years
Total Maintenance Length 0.55
Overlap Length 0.00 0.00 0.00
Total NFL length 0.00
Total DLP length
ongoing work 0.00 0.00 0.00
Total length of road 0.55
(14) Mullur-Mudenakoppa-Chikkanaragund road from km 0.00 to 7.42
For Maintenance Length 0.00 7.42 7.42 more than 5 years
0.00 0.00 0.00 less than 5 years
Total Maintenance Length 7.42
Total NFL length 0.00
Total DLP length
ongoing work 0.00 0.00 0.00
Total length of road 7.42
.(17) Chikkoppa-Udachammanagar road from km 0.00 to 1.60
For Maintenance Length 0.00 1.60 1.60 more than 5 years
0.00 0.00 0.00 less than 5 years
Total Maintenance Length 1.60
Overlap Length 0.00 0.00 0.00
Total NFL length 0.00
Total DLP length
ongoing work under appendix E 1.60 6.00 4.40
Total length of road 6.00
(18) Jalikatti-Kittur-Kuruvinakoppa road from km 0.00 to 6.05
For Maintenance Length 0.00 6.05 6.05 more than 5 years
0.00 0.00 0.00 less than 5 years
Total Maintenance Length 6.05
Overlap Length 0.00 0.00 0.00
Total NFL length 0.00
Total DLP length
ongoing work 0.00 0.00 0.00
Total length of road 6.05
(20) Mudenur-Hanumapur-Umatar road from km 0.00 to 11.07
For Maintenance Length 0.00 11.07 11.07 more than 5 years
0.00 0.00 0.00 less than 5 years
Total Maintenance Length 11.07
Overlap Length 0.00 0.00 0.00
Total NFL length 0.00
Total DLP length
ongoing work 0.00 0.00 0.00
Total length of road 11.07
(21) Aneguddi-Hanumapur-Channapur road from km 0.00 to 11.24
For Maintenance Length 4.55 11.24 6.69 more than 5 years
0.00 2.10 2.10 less than 5 years
Total Maintenance Length 11.24
Overlap Length 0.00 0.00 0.00
Total NFL length 0.00
Total DLP length
ongoing work 0.00 0.00 0.00
Total length of road 11.24
(22) M-Timmapur-Kalmada-Aneguddi road from km 0.00 to 9.24
For Maintenance Length 0.00 9.24 9.24 more than 5 years
0.00 0.00 0.00 less than 5 years
Total Maintenance Length 9.24
Overlap Length 0.00 0.00 0.00
Total NFL length 0.00
Total DLP length
ongoing work 0.00 0.00 0.00
Total length of road 9.24
(23) SH-34 to Channapur L Tanda road from km 0.00 to 3.20
For Maintenance Length 0.00 3.20 3.20 more than 5 years
0.00 0.00 0.00 less than 5 years
Total Maintenance Length 3.20
Overlap Length 0.00 0.00 0.00
Total NFL length 0.00
Total DLP length
ongoing work 0.00 0.00 0.00
Total length of road 3.20
(28) Lakanayakankoppa to Shiddeshwar kolla road from km 0.00 to 1.37
For Maintenance Length 0.00 1.37 1.37 more than 5 years
0.00 0.00 0.00 less than 5 years
Total Maintenance Length 1.37
Overlap Length 0.00 0.00 0.00
Total NFL length 0.00
Total DLP length
ongoing work 0.00 0.00 0.00
Total length of road 1.37
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
42584 BID DOC GEN KW-1.doc
Tender Document • 1.60 MB
Formats and govt GOs.zip
Others - Formats and govt GOs.zip • 20.38 MB
2026-2027 M Timmapur Kalmad aneguddi road.xlsx
Others - 2026-2027 M Timmapur Kalmad aneguddi road.xlsx • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .