Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 LAccepted-AOC MAHISHADAL PURBA MEDINIPUR 721628 | MAHISHADAL | PURBA MEDINIPUR | WEST BENGAL | 721628 | ₹12.6 L | L1 | Accepted-AOC ok |
| 2 | L2₹12.7 L+₹12,892.96 (1.03%)Rejected-Finance ASANSOL | ASANSOL | WEST BENGAL | ₹12.7 L+₹12,892.96 (1.03%) | L2 | Rejected-Finance EMD TO BE REFUND |
| 3 | L3₹12.9 L+₹33,844.03 (2.69%)Rejected-Finance 17 1 SREEMANTA DEY LANE KOLKATA 700 012 | KOLKATA | KOLKATA | WEST BENGAL | 700012 | ₹12.9 L+₹33,844.03 (2.69%) | L3 | Rejected-Finance EMD TO BE REFUND |
| 4 | L4₹13.3 L+₹71,314.21 (5.67%)Rejected-Finance 56 C 2 BIDHANNAGAR ROAD KOLKATA WEST BENGAL 700067 | KOLKATA | KOLKATA | WEST BENGAL | 700067 | ₹13.3 L+₹71,314.21 (5.67%) | L4 | Rejected-Finance EMD TO BE REFUND |
Tender Value
₹13.4 L
EMD Value
₹26,860
Closing Date
17 Jan 2026, 5:00 pmClosed
EXECUTIVE ENGINEER ADDA ASANSOL
Vivekananda Sarani, Senraleigh Road Near Kalyanpur Housing More,Asansol -713305
Construction of Under Ground Water Reservoir at ADDA Staff Quarters ,Kalyanpur Asansol in the district of Paschim Bardhaman 4 TH CALL
2025_ADDA_976625_1
ADDA/ASN/ED/N-62(2025-2026)
Open Tender
CIVIL WORKS
Percentage
120 days
ADDA ASANSOL
Please refer as uploaded documents
3 documents required · 3 mandatory
₹0
₹26,860
30 Mar 2026
20 Dec 2025
20 Jan 2026
20 Dec 2025
17 Jan 2026
20 Dec 2025
Earthwork in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone ) including removing spreading or stacking the spoils within a lead of 75 metre as per direction.The items includes necessary trimming the sides of trenches, levelling , dressing & ramming the bottom , bailing out water as required complete
Depth of excavation not exceeding 1500 mm
Depth of excavation exceeding 1500 mm
Earth work in filling in foundation trenches or plinth with goode earth , in layers not exceeding 150 mm. Including watering and ramming etc. layer by layer, complete.With earth obtained from excavation of foundation.
Flling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating same by through saturation with water and ramming complete including cost of sand by fine sand
Supplying and laying Polythene sheet (150 gm/sqm ) over damp proof course or below flooring or in foundation trenches .
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes
Controlled cement concrete with well graded stone chips ((20 mm graded nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS 456 & relevant special publication, submission of job mix formula after preliminirory mix design after testing of concrete cube as per direction of EIC. Consumption of cement will not be less than 300 Kg of cement with with super plasticiser per cum of controlled concrete but actual consumption will be determined on the basis of preliminary test & job mix formula .In Ground Floor & foundation with Concrete mixture [ M25 Grade]
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with rewuired bracing for concrete slabs, beams, columns, lintels, curved or straight including fitting , fixing and stricking out after completion of works.
25 mm to 30 mm wooden shuttering / Upto Ground floor roof level
25 mm to 30 mm shuttering without staging in foundation etc.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, strips binders etc. including supplying of roads, initial straightening and removal of loose rust (if necessary) cutting to requisite length hooking and bending etc. complete as per drawing and direction.
For M.S. / Tor steel.[Other than SAIL / TATA/RINL] upto Ground floor roof level.
Plaster (to wall, floor, etc.) with sand and cement mortar including rounding off or chamfering corners, as directed and racking out joints roughening of concrete surface including chipping and application of cement slurry where necessary etc. complete.
With 4:1 cement mortar.
15 mm thick plaster in ground floor.
Neat cement punning about 1.5 mm thick in wall , dado, window sills, floor, drain etc.
Artificial stone in floor , dado, staircase etc.with cement concrete (4:2:1) laid in panels as directed, with topping made with ordinary or white cement (as necessary) and marble dust in proportion (2:1) including smooth finishing and rounding off corners including application of cement sullry before flooring works, using cement @ 1.75 kg/sqm all complete including all materials and labour.(In G Floor/ With graded stone chips :3 mm thick topping (High polishing grinding on this item is not permitted) with ordinary cement. 35 mm thick artificial stone in G.F. roof
Supplying, fitting and fixing brass ferrule including connection with P.V.C. pipe of approved make upto 450 mm long with plumbing joint,brass over C.P. coupling at both ends, with cap and lining complete in all respect, including cutting trenches in all sorts of soil and filling up trenches as per direction of the Engineer-in-charge. 25 mm dia
Supplying, fitting and fixing CPVC (Chlorinated Polyvinyl Chloride) pipes of approved make conforming to IS-15778: 2007 . with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials.
For Exposed Work Class-1, SDR-11
50 mm. dia Medium Quality
Supplying, fitting and fixing CPVC Ball valve 25 mm dia
50 mm dia
Supplying, fitting and fixing CPVC equal Tee 50 mm dia
Sub-Total
GST-18% (SGST=9% & CGST=9%)ADD
WEST BENGAL LABOUR WELFARE CESS =1% ADD
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.93 MB
Tendernotice_2.pdf
PDF • 2.00 MB
BOQ_2379320.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .