Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.7 LAccepted-AOC | L1 | Accepted-AOC 0.0095 percentage less than estimate rate | |
| 2 | L2₹20.8 L+₹1.0 L (5.09%)Rejected-Finance | L2 | Rejected-Finance Amount quoted is High | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
Tender Value
₹19.8 L
EMD Value
₹19,800
Closing Date
21 Aug 2023, 3:00 pmClosed
Divisional Engineer H C and M Ramnathpuram
Divisional Engineer H C and M Ramnathpuram
Preparation of Detailed Project Report DPR for Formation of Rameswaram Bypass from Dr.A.P.J Abdulkalam Memorial to Agnitheertham
2023_HWAY_354205_1
RMD01 TN 11 2023 24 SDO Dated 26.07.2023
Open Tender
Civil Works - Highways
Item Rate
120 days
Ramnathpuram
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹19,800
Yes
4 Jan 2024
3 Aug 2023
22 Aug 2023
3 Aug 2023
21 Aug 2023
4 Aug 2023
Amount
Preparation of Detailed Project Report (DPR) for Formation of Rameswaram Bypass from Dr.A.P.J Abdulkalam Memorial to Agnitheertham
Conducting Reconnaissance survey including collection of pavement and Cross Drainage work details of the existing road and the proposed alignment including submission of inception report covering the entire project length complying with standard and as directed by the departmental officer including all incidental charges
Conducting Topographic survey along project length including all junctions and branching roads by using Total Station for bring all the existing details features includig fixing of GPS pins as instructed by the Engineer incharge including all incidental charges.
Conducting survey along project length for assessing longitudinal and cross sectional details of the proposed work as instructed by the Engineer incharge including all incidental charges.
Fixing Horizontal Alignement and Vertical Alingement including fixing temporary bench marks at 500m interval along the alignment as directed by the departmental officers in charge of the work as per standards including all incidental charges as per IRC standard.
Conducting Classified traffic volume count including supply of Enumerators, hire charges for working tables, PVC chairs, Samiyana, electrical arrangements during night time, etc. for 24 hours for 7 days as per the instruction of Engineer in-charge and submitting the report in standard forms including all incidental charges.
Conducting Classified Origin - Destination survey including supply of Enumerators, hire charges for working tables, PVC chairs, Samiyana, electrical arrangements during night time, etc. for 24 hours for 3 days as per the instruction of Engineer in-charge and submitting the report in standard forms including all incidental charges.
Clearing the scrub jungle as per specification as directed by the departmental officers in charge of the work as per standards including all incidental charges.
Collection of soil samples from site at regular intervals as per the standards of soil sample collection including finding out all properties such as gradation, liquid limit, plastic limit, Proctor density, swell index, CBR, etc. including transportation to the laboratory as directed by the Engineer in charge
Detailed report on alingment (including three alternations) fixing Horizontal Alingment and vertical Alingment including all CD works and Railway Over Bridge as per IRC standards
Materials survey for road and bridge works and preparation of rate analysis, SBC calculations, Drawings etc., complete including Design for pavement composition based on kilometer- wise field data as directed by the departmental officers in charge of the work as per standards including all incidental charges.
Preparation of Land Plan Schedule (LPS) including collection of field maps, patta, chitta, owner details, marking centre line of alignment, specification report, abstract of land acquisition area in proper forms and combined FMB and individual FMB for each field along with necessary individual drawings and necessary area calculations, etc., in standard format including value of buildings required under acquisition required to submit to the revenue department for further processing approval and necessary revisions till approval including all incidental charges.
Preparation of Draft Detailed Project Report covering all aspects like specification report, detailed estimate, detailed design, drawings and other supporting details for final approval including power point presentation to Technical audit committiee and in soft and hard copies (8 sets) and Preparation of final DPR and bid documents for calling tenders for the formation of byepass with necessary copies required for the deparmental purposes and tender process in soft and hard copies including power point presentation including provision for junction improvements light arrangements, etc including all incidental charges.
Preparation of environmental impact assessment (EIA) report alongwith Resettlement and Rehabilitation (R&R) report as per the standard guidelines of Government of Tamil Nadu and Government of India in the prescribed format for a highway project including all incidental charges.
Preparation of report for Coastal Regulation Zone Permission
Calculation of SubTotal, GST and Total Amount carried out by system automatically
Basic cost of value put to tender as per estimate
Add GST at 18%
R AND B CONSULTANCY
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .