Loading…
Loading…
Tender Value
₹1.2 Cr
EMD Value
₹7.8 L
Closing Date
30 Sept 2026, 12:00 pm7d left
SE Banda Circle PWD Banda
SE Banda Circle PWD Banda
Construction of Gawain River Itawa to Parampurva Link Road Including 5 Year Maintenance
2026_CEBAN_1182615_3
3700/35C-Banda Circle/2026-27 Dt 02-09-2026
Open Tender
Civil Works - Roads
Percentage
365 days
Banda
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,720
₹7.8 L
SE Banda Circle PWD Banda
15 Sept 2026
15 Sept 2026
30 Sept 2026
15 Sept 2026
30 Sept 2026
15 Sept 2026
25 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 50 meter as per MORD technical specification cause 301.5 MORD sepecification 301.5(i) S.No. 3.4 | 7,603.2 | cum | 90 | ₹6,84,288 |
| - | Construction of granular surface Course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80 100 kn static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402. | 2,405.7 | cum | 1,600 | ₹38,49,120 |
| - | Construction of granular Sub Base by providing well graded material, spreading in uniform layers with motar grader on prepared surface mixing by mix in place method with 2% cement (OPC) with rotavator at OMC, and compacting with smooth wheel rollar to achieve the desired density complete as per technical Specification Clause 401 | 483.6 | cum | 2,400 | ₹11,60,640 |
| - | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC and 4% cement (OPC) in mechanical mixer (pug mill)-carriage of mixed material by tipper to site, laying in uniform layer in sub base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achive the desire density including lighting, barricading and maintenance of diversion etc as per Table 400.11 & 400.12 and Technical Specification Clause 405.00 | 630 | cum | 3,000 | ₹18,90,000 |
| - | Providing and applying tack coat with V.G.-10 bitumen using bitumen pressure dristributor @ 0.35 to 0.45 kg. per sqm. on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 4,500 | Sqm | 28 | ₹1,26,000 |
| - | Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat . Claues 508 | - | Sqm | 190 | - |
| - | Providing and laying seal coat Type-C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using As per Technical Specification Clause 510 | - | Sqm | 75 | - |
| - | Construction of Earthen Soulder with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 50 meter as per MORD technical specification cause 301.5 MORD sepecification 301.5(i) S.No. 3.4 | 1,332.24 | cum | 90 | ₹1,19,901.6 |
| - | Excavation in foundation in B.C soil including lift up to 15 meter and lead upto 30 m (100 ft) and including filling, watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M from the foundation trenches.(S.I.No. 251) | 218.92 | cum | 121.2 | ₹26,533.1 |
| - | Sand filling in plinth including supply of necessary quantity of sand from the site of work & including watering, dressing etc. Rate to include cost of all materials, labour and tools & plants etc. required for proper completion of the work. (S.I.No. 255) | 21.33 | cum | 1,010 | ₹21,543.3 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
Tendernotice_2.pdf
PDF • 3.47 MB
BOQ_2223795.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .