Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.9 LAccepted-AOC 28 1 THURAIYUR PUTHUCHINNAKAVUR METTUR DAM 636401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | 1 | Accepted-AOC Lowest 1 | |
| 2 | Not Admitted-Fee/PreQual/Technical 18 B72 RAJAJI NAGAR MATHAYANKUTTAI METTUR DAM 636452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹2,800
Closing Date
2 Apr 2025, 2:00 pmClosed
Chief Engineer / MTPS I
Office of the CE / MTPS I / Mettur Dam
MTPS I - Civil Circle - Repairing the patch works in existing BT road leading from main gate to central stores at MTPS I
2025_EB_533690_1
CE / MTPS-I / SE/ CIVIL / OT.NO. 81 / 2024-25
Open Tender
Civil Works
Works
90 days
Mettur Thermal Power Station I / Mettur Dam
As per Tender Specification
2 documents required · 2 mandatory
₹0
₹2,800
Yes
14 May 2025
19 Mar 2025
3 Apr 2025
19 Mar 2025
2 Apr 2025
19 Mar 2025
Amount
Patch work for making up the undulations in the existing BT surface to an average thickness of 50 mm using 45 mm to 13.2 mm IRC size HBG metal premixed with 44 Kg/m3 metal using 80 / 100 Grade bitumen per cum of metal including cost and conveyance of all materials to site stacking them to departmental gauge for premeasurement as directed by the Engineer at site including cost and conveyance of bitumen, which will be procured and supplied by the contractor himself at his own cost, including handling charges for the same at both ends, heating the bitumen premixing laying, tamping and all labour charges for patch work and hire charges for running and fuel charges for all T&P's, all lead and lift, safety appliances, etc, complete.
Providing tack coat using emulsion bitumen over BT surface at the rate of bitumen including cost and conveyance of bitumen and all labour charges for cleaning the surface and applying of tack coat and all other incidental charges etc., complete.
Providing and laying Bituminous concrete to 40 mm thick using 0.13 cum of 19.00-9.50mm,0.17 cum of 9.50 -2.36 mm and 0.26 cum of 2.36 and below with 50.30kgs of VG 10 bitumen for premixing per 10sq.mm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix with uniform thickness of 40 mm with mechanical paver to the specific grades and cross sections and consolidated by 8-10 tonne vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for20-30 t CMP with bitumen boiler, tipper trucks, paver finisher, vibratory / Pneumatic roller and all other tools and plants required, includilng fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 kof MORTH Rev-5.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .