| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹27.2 LAdmitted-Finance KAUSALY KUNJ KORHAR ANANDPUR CAMP BIHTA PATNA 801103 | BIHTA | PATNA | BIHAR | 801103 | -2.51% | ₹27.2 L | L1 | Admitted-Finance |
Tender Value
₹27.9 L
EMD Value
₹55,840
Closing Date
22 Jan 2026, 10:00 amClosed
Executive Officer
Municipal Board Nokha
Construction BT road from Jyoti chowk Saibaba education academy, Nokha
2026_DLB_528317_1
E NIT 09/2025-26 (9)
Open Tender
Civil Works - Roads
60 days
Nokha
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Executive Officer
₹55,840
Yes
24 Jan 2026
16 Jan 2026
23 Jan 2026
16 Jan 2026
22 Jan 2026
16 Jan 2026
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer. Bituminous courses
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer. Granular courses
Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. In all type of soil
Carriage of Materials by mechanical transport including loading, unloading and stacking :: Sand, bazri, ballast, kankar :: Up to 5 Km
Providing, laying and spreading of granular sub-base by providing coarse graded Material (Table 400-2), spreading in uniform layers with motor grader on prepared surface, mixing BY MIX IN PLACE METHOD with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion.
Providing, laying, spreading (with paver finisher only) and compacting wet mix macadam (WMM) base course comprising of graded stone aggregate and granular material conforming to MORT&H specifications (Table 400-II) in layers of equal compacted thickness each consolidated, including pre-mixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tippers to site, laying in uniform layers in base course on a well prepared sub-base/ base course and compacting with power vibratory-roller to achieve the desired density complete as per MoRT&H specification clause - 406 including all material, labour, machinery, lighting, guarding and maintenance of diversion.
Providing and applying primer coat over prepared surface of granular base with bitumen emulsion as per IS : 8887 and approved quality @ 0.6 kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface including removing of binding material and other foreign matter with wire brushes and small picks, sweeping with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion
Providing and applying tack coat on the prepared surface with bitumen emulsion as per IS: 8887 and approved quality @ 0.2 kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. 998*6.50=6487 sqm
Providing and laying 30-45 mm compacted thickness Bituminous Concrete as per design mix (approved by Engineer) on prepared surface with specified grade stone aggregate as per Table - 500-18 with bitumen for wearing course including loading of aggregate with F.E. loader and hot mixing of stone aggregate and bitumen (including Cost of anti-stripping compound Minimum 1% in Lime/Cement as per design wherever required) in computerised hot mix plant, transporting the mixed material by tippers to paver and laying with paver finisher fitted with electronic sensing device (as per clause 504-3.5) to the required level and grade and compacting by power rollers and vibratory rollers or 150 to 250 KN pneumatic tyred roller with TP = 0.7 Mpa, to achieve the desired density complete as per clause 509 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion but excluding primer/tack coat. Grade-II with Bitumen VG-grade 30 @ 6% (percent by weight of total mix)
Filling of Pot- holes and patch repairs with open graded premix surfacing 20mm thick compacted with bitumen binder VG-grade 30 @ 14.60 kg/10 sqm and aggregate in Hot mix plant, transporting the mixed material with tipper and laying manually to the required level and grade, rolling with power roller, 8-10 tonne, removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 511, compacting, trimming and finishing the surface to form a smooth continuous surface complete as per clause 3004.2 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
Terms.pdf
Tender Documents • 0.21 MB
BOQ_942595.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid