| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 CrAccepted-AOC | ₹6.6 Cr | L1 | Accepted-AOC Ist Lowest |
| 2 | L2₹7.2 Cr+₹59.2 L (8.92%)Rejected-Finance D 172 SAKET MEERUT DISTRICT MEERUT | MEERUT | MEERUT | UTTAR PRADESH | ₹7.2 Cr+₹59.2 L (8.92%) | L2 | Rejected-Finance L2 |
| 3 | L3₹7.4 Cr+₹77.5 L (11.7%)Rejected-Finance | ₹7.4 Cr+₹77.5 L (11.7%) | L3 | Rejected-Finance L3 |
| 4 | L4₹7.7 Cr+₹1.1 Cr (16.4%)Rejected-Finance | ₹7.7 Cr+₹1.1 Cr (16.4%) | L4 | Rejected-Finance L4 |
| 5 | L5₹8.3 Cr+₹1.7 Cr (25.0%)Rejected-Finance | ₹8.3 Cr+₹1.7 Cr (25.0%) | L5 | Rejected-Finance L5 |
Tender Value
₹8 Cr
EMD Value
₹16 L
Closing Date
24 Jan 2020, 4:00 pmClosed
SE MEERUT CIRCLE PWD MEERUT
SE MEERUT CIRCLE PWD MEERUT
Construction of Meerut Side main approach additional approach and protection work of Bridge at river Ganga for Connecting Tehsil Mawana, Hastinapur Meerut and Chandpur Meerut near Bhikund at Chetawala Ghat
2020_CEMRT_422349_1
5507/11Cashier(PDMRT) /MRTCir/19-20 Dt 27.12.19
Open Tender
Civil Works
Fixed-rate
270 days
EE PD PWD MEERUT
CLASS A
3 documents required · 3 mandatory
₹2,354
EE PD PWD MEERUT
₹16 L
Yes
SE MEERUT CIRCLE PWD MEERUT
18 Feb 2020
11 Jan 2020
25 Jan 2020
13 Jan 2020
24 Jan 2020
13 Jan 2020
13 Jan 2020
Amount
Earth Work through carted earth in cutting or in embankment including all leads & all lift, including cartage beyond the wild life sanctuary area, cost of earth, ramming & dressing the surface to required level and slopes and also including all Labour and T&P & Compaction of earth to achieve the 95% proctor density including watering and compacting the earth by mechanical means road roller etc complete. including cost of all material, labour, labour cess, T&P all taxes etc. as per MORTH specification no 305
Construction of granular sub-base by providing coarse graded material spreading in uniform layers upto required thickness as per direction of Engineer In Charge on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, on both side of existing carriage way including prepration of sub grade with watering and rolling complete . including cost of all material, labour, labour cess, royalty, T&P all, taxes etc. as per MORTH specification no 401
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. (Gr-2) including cost of all material, labour, labour cess, royalty, T&P, all taxes etc. as per MORTH specification no 404
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. (Gr-3) including cost of all material, labour, labour cess, royalty, T&P, all taxes etc. as per MORTH specification no 404
Brick lining on both side of the road of M-150 bricks 7 Cm wide 11 cm deep, laid with mud mortar including labour & supply of bricks finished to the required template and in proper alignment and also including dressing and ramming the excavted earth as directed by the Enginner Incharge. including cost of all material, labour, labour cess, royalty, T&P, all taxes etc. (As per SI No 765)
Brick soling with straight over burnt bricks laid on edge and dry with brick edging on both sides including preparation of subgrade to prescribed camber and including supply of bricks, filling joints with local earth of P.I. 5 to 7, spreading blinding coat 1 cm (3/8") depth of local earth over the entire surface and including supply of all materials, labour Tools & Plants etc. required for proper completion of the work. including cost of all material, labour, labour cess, royalty, T&P, all taxes etc. (As per SI No 762b)
Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular Base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. including cost of all material, labour, labour cess, T&P, all taxes etc.(As per MORTH Specification No. 502)
Cleaning the existing painted/primixed surface and applying a tack coat of bitumen VG-10, @ 0.25 kg/sqm and laying premix carpate 20 mm (3/4'') thick with graded approved grit and bitumen including heating the paint to the required temperature and mixing either in mixture or hand drum including cartage of materials, maintenance of side patries and watering them during operation for proper complection of the work as directd by engineer in charge including road roller, all material T&P fuel wod etc.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels grade cross fall using type A seal coat including cost of all material, labour, labour cess, T&P, all taxes etc. (As per MORTH sepecifications No. 513)
Excavation in foundation in ordinary soil including all lead and lift and including filling watering and ramming of excavated earth into the trenches and also using this excavated earth in guide bund etc. as per direction of Engineer in charge including cost of all material, labour, labour cess, royalty, T&P, all taxes etc.(As per SI No 251a)
Cement concrete with 40 mm Stone ballast fine sand and cement in proportion of 8:4:1 in foundation and under floors including supply of all material, labour, T&P etc. required for proper completion of work. including cost of all material, labour, labour cess, royalty, T&P all taxes etc.(As per SI No 281)
Cement concrete with 40 mm Brick ballast fine sand and cement in proportion of 8:4:1 in foundation and under floors including supply of all material, labour, T&P etc. required for proper completion of work. SI No. 281
M-150 Brick Work in 1:4 cement & Coarse sand mortar in foundation and plinth including supply of all materials, Labour, Tools & Plants etc. Required for proper completion of the work. including cost of all material, labour, labour cess, royalty, T&P, all taxes etc.(As per SI No 305a)
M-150 Brick Work in 1:4 cement & Coarse sand mortar in Super Structure including supply of all materials, Labour, Tools & Plants etc. Required for proper completion of the work. including cost of all material, labour, labour cess, royalty, T&P,all taxes etc.(As per SI No 305a+309)
M-150 Brick Work in 1:6 cement & fine sand mortar in foundation and plinth including supply of all materials, Labour, Tools & Plants etc. Required for proper completion of the work.SI No. 305
Struck Pointing with cement mortar consisting of 1 part cement and 2 parts of fine sand of 1.25 fineness modulus. including cost of all material, labour, labour cess, royalty, T&P, all taxes etc.(SI No 574)
12 mm thick plaster with cement and fine sand in 1:3 over brick work minimum thickness not be less than 1 cm including supply of all materials, labour, T&P etc required for proper completion of the work. including cost of all material, labour, labour cess, royalty, T&P, all taxes etc. (As per SI. No. 582)
12 mm thick plaster with cement and fine sand in 1:6 over brick work minimum thickness not be less than 1 cm including supply of all materials, labour, T&P etc required for proper completion of the work. As per SI. No. 583
Providing & Laying 40 mm thick C.C. floor with 1:2:4 (Cement, Couase sand, graded stone grit 20 mm) complete (without base concrete) by over laid parapet wall including supply of all material including cost of all material, labour, labour cess, royalty, T&P, all taxes etc (As per SI. No. 605)
R.C.C. Work with cement, approved coarse sand & 2 Cm gauge approved stone grit in proportion of 1:2:4 in lintels excluding supply of reinforcement and its bending. But including its fixing and binding the same with 24 B. W. G. G. I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc, required for proper completion of the work including cost of binding wire. The rate excluding making of drip course which shall be paid extra including cost of all material, labour, labour cess, royalty, T&P, all taxes etc. (As per SI No 283)
R.C.C. Work with cement, approved coarse sand & 2 Cm gauge approved stone grit in proportion of 1:2:4 in slab excluding supply of reinforcement and its bending. But including its fixing and binding the same with 24 B. W. G. G. I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc, required for proper completion of the work including cost of binding wire. The rate excluding making of drip course which shall be paid extra including cost of all material, labour, labour cess, royalty, T&P, all taxes etc (As per SI No 284)
HYSD bars in plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage bend hooks and authorized overlapping shall be measured & excluding cost of binding wire including cost of all material, labour, labour cess, royalty, T&P, all taxes etc. (As per SI No 504)
Concrete with 40mm gauge brick ballast fine sand of 1.25 mm and cement in proportion of 12:6:1 in foundation and under floor. including cost of all material, labour, labour cess, royalty, T&P, all taxes etc. (As per SI No 273)
Providing & laying of 1000 mm hume pipe in position including all material, labour, T&P etc required for proper completion of the work and as per directed by the Engineer Incharge. including cost of all material, labour, labour cess, royalty, T&P, all taxes etc. (As per SI No New Item 10.27(B)(V))
Laying of a geotextile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment material through the voids of the stone pitching/cement concrete blocks as well as to allow free movement of water without creating any uplift head on the pitching including cost of all material, labour, labour cess, royalty, T&P, all taxes etc. (as per MORTH specification no 700 & 2504)
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications including cost of all material, labour, labour cess, royalty, T&P, all taxes etc. (as per MORTH specification no 2504 a) (boulder weighing between 25-60 kg)
Brick on edge floor with 1:6 cement mortar (apron) at shoes of, off shoot with base concrete in 1:6:12 with 3" thick including flush pointing in 1:2 including all material, labour & T&P, etc complete. including cost of all material, labour, labour cess, royalty, T&P all taxes etc. (As per SI No 613)
Preeti Buildcon Private Limited
LOHIYA DEVELOPERS
Jeet Construction
SINEWY CONSTRUCTIONS PVT. LTD.
ASHOK KUMAR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .