Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹57.8 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹60.5 L+₹2.5 L (4.29%)Rejected-Finance | 2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
19 Sept 2024, 2:00 pmClosed
Chief Engineer MTS and Gas Turbine Schemes
Chief Engineer MTS and Gas Turbine Schemes , 144, Anna Salai, Chennai-600002
Routine, periodical and breakdown maintenance contract works in Electrical Division at Thirumakkottai (Kovilkalappal) GTPS for a period of one year during 2024-25
2024_EB_470818_1
SE/GTS/OT-12/2024-25
Open Tender
Electrical and Maintenance Works
Works
365 days
Thirumakkottai (Kovilkalappal) GTPS, Thirumakko
As per specification
4 documents required · 4 mandatory
₹0
₹60,000
Yes
8 Jan 2025
22 Aug 2024
20 Sept 2024
22 Aug 2024
19 Sept 2024
22 Aug 2024
22 Aug 2024 - 18 Sept 2024
Amount
ELECTRICAL MAINTENANCE
Maintenance of modules below 45 kW rating Regular (once in two months) & Break down.
Maintenance of modules which includes LT breaker/ 45 KW and above rating regular (once in two month) & Break down
Rectification of LIGHT fitting below 4.5 meter height
Rectification of LIGHT fitting 4.5 meters and above height
Maintenance of LT motors below 25 HP/ 18.5 KW rating Regular (once in two months) & Break down.
Maintenance of LT motors 25 HP/ 18.5 KW rating and above Regular (once in two months) & Break down.
Maintenance of HT motors, Regular (once in three months) & Break down
Maintenance of 110 KV isolators, CTs, CVTs, LAS,SF 6 gas top up etc., Regular (once in two months) & Break down.
Maintenance of Circuit Breaker Regular (once in two months) & Break down
Maintenance of power transformer Regular (once in three months) & Break down
Maintenance of Batteries (once in a week).
Maintenance of carbon brush for GTG excitation
Extension of temporary supply
Repainting of electrical equipment
Monitoring taking daily cleaning of all motors and inspection of all switch gear MCC etc
Maintenance of Lighting transformer’s and 500 KVA Transformer Regular (once in Three months) & Break down
Lifting and Re-erection of shallow bore well motor
Maintenance and checking of quarters main supply.
Light up works of GTG/STG area as directed by engineer
Removal of links in Generator power transformers by opening cover and fixing links and Closing of cover as request by MRT wing for annual testing.
METER AND RELAY TESTING
Calibration of voltmeter / Ammeters /Timers includes safe release of meter/timer from panel / testing of meter and physical verification, cleaning attending minor defects, repairs /adjustments, re-fixing of meter/timer, checking for correctness and restoring normalcy, handling of testing kits / equipments and maintaining of registers etc, as directed by the engineer in charge.
Calibration of KW/KVAR/PF/KWh/ Trivector Meter and all transducers including safe release of meter/transducer from panel/testing and physical verification, cleaning attending minor defects, repair/adjustment, re-fixing, checking for correctness and restoring normalcy, handling of testing kits/equipment and maintaining of registers etc, as directed by the engineer in charge.
Calibration of Bimetallic relays Electromagnetic relays and static relays including safe release of relay from panel/testing relay and physical verification, cleaning attending minor defects, repair/adjustment, re-fixing, checking for correctness and restoring normalcy, handling of testing kits/equipment and maintaining of registers etc, as directed by the engineer in charge.
Testing of Numerical relays, including safe release of relay from panel/testing of relay and physical verification, cleaning attending minor defects, repairs/ adjustments, re-fixing of relay, checking for correctness and restoring normalcy, handling of testing kits/equipments and maintaining of registers etc, as directed by the engineer in charge
Testing of AVR, SEE/SFC, Generators, Power transformers, 110KV and 11KV Circuit Breakers handling of testing kits/equipments and maintaining of registers, etc, as directed by the engineer in charge.
Testing and Troubleshooting of breakers upto 6.6KV rating, lighting transformers, HT and LT Motors, handling of testing /equipments, CT secondary circuit tightness checked and maintaining of registers etc, as directed by engineer in charge.
Lubricating cleaning, checking of control circuits tightness and healthiness in both end (local and module end), Disconnection and Reconnection of Control cables on Motorized valve/Smart MOV's and maintaining of registers etc, as directed by engineer in charge.
Limit setting of torque and limit switch of motorized valve/Smart MOV's checking of control circuits and maintaining of registers etc, as directed by engineer in charge.
Troubleshooting of control circuit problems in all type of LT & HT modules, Checking for tightness healthiness cleaning of all type of control and relay panels, UPS, Chargers, LT & HT module, control and annunciation panels, fire panels, fire detectors and CO2 fire protection etc, and maintaining of registers etc, as directed by engineer in charge.
Troubleshooting and cleaning of SCADA, Routine maintenance of, Intercom, PA System, as directed by engineer in charge.
Assistance to the maintenance Engineers during GTG & STG startup and shutdown, commissioning of new equipment & other activities as directed by engineer in charge.
Monitoring, taking daily walk down check list of all important parameters in the station, checking of all fire systems and checking of all intercom connection healthiness.
CONTROL&INSTRUMENTATION
CALIBRATION OF FIELD INSTRUMENTS: Cleaning and Calibration of Various field Instruments including removing of instruments, input/output lines etc., from field, transport to the Lab and re fixing at Site checking for correctness and restoring normalcy as directed by the Engineer in charge.
MAINTENANCE WORKS AT FIELD : Inspection of all field instruments and lines including attending minor defects / repairs wherever necessary as directed by the Engineer in charge ( Once in 04 Days)
MAINTENANCE WORKS IN CCR: Inspection of all equipments in CCR like panels servers, DCS Modules, etc., Cleaning of equipments and Maintenance of Maintaining Control Supply to panels, DCS etc., as directed by the Engineer in charge ( Once in a week)
Dismantling and re-fixing of instrument lines during Mechanical Maintenance, Taking periodical vibration readings and Maintenance of Matrix double acting actuators etc., as directed by the Engineer in charge.
Break down Maintenance
OPERATION
Assisting Operator in CCR for monitoring and recording important parameters and readings
Racking IN or OUT of 6.6 kV VCB LT ACB at Switchgear Room and removing of module fuses etc
Assisting the Main Control Room operators during Start up or Shut down
Assisting Operator in CCR for recording Parameters and readings at GBC IAPA STG GTG BOP CW areas in each shift
Checking for any abnormality in sound leakage etc in each shift
Taking readings in energy meters in switchyard control room switch gear room CW MCC
Assisting operators DG set trial runs GT on line water wash Fire water Deep borewell pump start/stop
Opening or closing of valves in De-aerator and other areas
Checking and taking readings of SF6 Gas pressure checking glow specific gravity of all batteries
MS Contractors (BID ID -1140459)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .