Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹7.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.8 L+₹548.26 (0.07%)Admitted-Fee/PreQual/Technical/Finance | ₹7.8 L+₹548.26 (0.07%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | S SATHISHKUMAR L1 | K SEKAR L2 |
|---|---|---|---|---|---|
| 1.00Construction of Drama Stage Makeup room Rendadi village H/O Rendadi Panchayat Sholinghur Block Ranipet District | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation. | 20.91 | Cum | 241.7 ₹5,053.95 Lowest | 261.78 ₹5,473.82 |
| 3.00 | Filling of Basement with Filling earth Layers not more than 15 cm thick well Rammed watered and Compacted complying with standard specifications | 9.6 | Cum | 45.8 ₹439.68 Lowest | 45.85 ₹440.16 |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 7.01 | Cum | 5,566.1 ₹39,018.36 Lowest | 5,566.11 ₹39,018.43 |
| 5.00 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 21.33 | Cum | 6,161.6 ₹1,31,426.93 Lowest | 6,161.61 ₹1,31,427.14 |
| 6.00 | Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete. | 1.36 | MT | 91,931 ₹1,25,026.16 Lowest | 91,951 ₹1,25,053.36 |
| 7.00 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Below Basement | 33.6 | Sqm | 547 ₹18,379.2 Lowest | 547.5 ₹18,396 |
| 8.00 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Above Basement | 75.08 | Sqm | 1,095 ₹82,212.6 Lowest | 1,095 ₹82,212.6 Lowest |
| 9.00 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | 16.51 | Cum | 9,312.67 ₹1,53,752.18 Lowest | 9,312.67 ₹1,53,752.18 Lowest |
| 10.00 | Plastering with Two Coats of Putty using 3 mm thick including cost and conveyance and all labour charges etc. | 35.27 | Sqm | 184.25 ₹6,498.5 Lowest | 184.25 ₹6,498.5 Lowest |
Tender Value
₹7.8 L
EMD Value
₹8,000
Closing Date
3 Jul 2026, 3:00 pmClosed
BDO BP
Panchayat Union Sholinghur
Construction of Drama Stage Makeup room Rendadi village H/O Rendadi Panchayat Sholinghur Block Ranipet District
2026_RDTN_681467_1
A2/1250/2025
Open Tender
Civil Works
Item Rate
90 days
Sholinghur
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹8,000
Yes
11 Sept 2026
18 Jun 2026
3 Jul 2026
18 Jun 2026
3 Jul 2026
18 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Drama Stage Makeup room Rendadi village H/O Rendadi Panchayat Sholinghur Block Ranipet District | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation. | - | Cum | 263.78 | - |
| 3 | Filling of Basement with Filling earth Layers not more than 15 cm thick well Rammed watered and Compacted complying with standard specifications | 1 | Cum | 45.85 | ₹45.8 |
| 4 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 1 | Cum | 5,566.11 | ₹5,560.54 |
| 5 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 1 | Cum | 6,161.61 | ₹6,155.45 |
| 6 | Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete. | - | MT | 91,951 | - |
| 7 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Below Basement | - | Sqm | 547.5 | - |
| 8 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Above Basement | 1 | Sqm | 1,095 | ₹1,093.91 |
| 9 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | - | Cum | 9,312.67 | - |
| 10 | Plastering with Two Coats of Putty using 3 mm thick including cost and conveyance and all labour charges etc. | - | Sqm | 184.25 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_818979.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .