| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC T P ROAD DURGAMANDIR ASANSOL BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | ₹3.6 L Quoted ₹3.0 L | L1 | Accepted-AOC AS PER APPROVED TCR |
| 2 | Rejected-Technical | - | - | Rejected-Technical as per NIT |
| 3 | Rejected-Technical | - | - | Rejected-Technical as per NIT |
| Sl No | Description | Qty | Unit | META ELECTRIC L1 |
|---|---|---|---|---|
| 1.00Item description | ||||
| 1.01 | Replacement of old primary conductor | 309 | KG | 876 ₹2,70,684 Lowest |
| 1.02 | Replacement of old secondary conductor | 234 | KG | 876 ₹2,04,984 Lowest |
| 1.03 | Reinsulation of primary conductor | 309 | KG | 45 ₹13,905 Lowest |
| 1.04 | Reinsulation of secondary conductor | 234 | KG | 45 ₹10,530 Lowest |
| 1.05 | Reformation of primary conductor | 309 | KG | 44 ₹13,596 Lowest |
| 1.06 | Reformation of secondary conductor | 234 | KG | 44 ₹10,296 Lowest |
| 1.07 | Less scrap value | 535 | KG | 510 ₹-2,72,850 Lowest |
| 1.08 | Supply and fitting of copper jumpers | 6 | nos. | 3,000 ₹18,000 Lowest |
| 1.09 | Supply and fitting of copper studs | 1 | LS | 6,500 ₹6,500 Lowest |
Tender Value
₹3.6 L
EMD Value
₹4,600
Closing Date
29 Jul 2025, 10:00 amClosed
General Manager,SSA
Office of the General Manager,SSA
Complete repairing and rewinding of 1MVA,11KV/3.3KV EEE make power transformer of Ningha colliery under Satgram-Sripur Area.
2025_ECL_339702_1
ECL/SSA/GM/E M/E-NIT/2025-26/35 Date 14.07.2025
Open Tender
Electrical and Maintenance Works
Fixed-rate
30 days
Ningha Colliery
Please refer Tender documents.
6 documents required · 6 mandatory
₹4,600
12 Dec 2025
19 Jul 2025
30 Jul 2025
19 Jul 2025
29 Jul 2025
19 Jul 2025
19 Jul 2025 - 23 Jul 2025
Amount
Item description
Replacement of old primary conductor
Replacement of old secondary conductor
Reinsulation of primary conductor
Reinsulation of secondary conductor
Reformation of primary conductor
Reformation of secondary conductor
Less scrap value
Supply and fitting of copper jumpers
Supply and fitting of copper studs
Necessary work at tap changer side
Charges for added jobs like detanking,removing of top cores,removing of coils from limbs, removing of old coils on limbs after inspection,supply of insulation like prespond,varnish etc., placing of reformed coils properly over the limbs,refitting of top cores and assembling of unit soldering & connection,baking& dryout, electricity charges etc.
Cooling pipes dismentling and fitting with oxygen ,DA and necessary welding
Tank Cleaning
Transformer oil filtration
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .