Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹4.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.5 L+₹283.15 (0.06%)Admitted-Fee/PreQual/Technical/Finance | ₹4.5 L+₹283.15 (0.06%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Muthusamy R L1 | RRB Constructions L2 |
|---|---|---|---|---|---|
| 1.00Construction of Protection Wall and Fencing to Odakkadu Open Well H/O Pappampalayam | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 1.94 | Cum | 260 ₹504.4 Lowest | 261.5 ₹507.31 |
| 3.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 47.6 | Cum | 193 ₹9,186.8 Lowest | 195 ₹9,282 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 2.7 | Cum | 5,751 ₹15,527.7 Lowest | 5,754 ₹15,535.8 |
| 5.00 | Supply and Erecting of Centering for Drain Sides including cost and conveyance of materials and labour charges etc complete. | 106.49 | Sqm | 474.5 ₹50,529.51 Lowest | 475.2 ₹50,604.05 |
| 6.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 44.55 | Cum | 6,511 ₹2,90,065.05 Lowest | 6,511 ₹2,90,065.05 Lowest |
| 7.00 | Cost and Supplying of Cut Stone Pillar of size 0.15 x 0.15 x 2.10m All Labour Charges Etc Completed | 16 | Nos | 165.6 ₹2,649.6 | 165 ₹2,640 Lowest |
| 8.00 | Supplying and fixing Chain Link - 2 x 2 using 10 Gauge Galvanised Iron Wire (of all sizes) including cost and conveyance fixing charges with Cut Stone using 16 gauge GI wire et | 69 | Sqm | 160 ₹11,040 Lowest | 161 ₹11,109 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 68,311 ₹68,311 Lowest | 68,354 ₹68,354 |
Tender Value
₹4.7 L
EMD Value
₹4,650
Closing Date
10 Sept 2026, 3:00 pmClosed
Block Development Officer (B.P) ,Pallipalayam
Block Development Office Pallipalayam
Construction of Protection Wall and Fencing to Odakkadu Open Well H/O Pappampalayam in Pallipalayam Block of Namakkal District under General Fund - 2026-2027 PPM_GF-3
2026_RDTN_699066_1
1938/2026/A2
Open Tender
Civil Works - Water Works
Item Rate
90 days
Pallipalayam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,650
Yes
10 Sept 2026
29 Aug 2026
10 Sept 2026
29 Aug 2026
10 Sept 2026
29 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Protection Wall and Fencing to Odakkadu Open Well H/O Pappampalayam | - | - | - | - |
| - | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 1.94 | Cum | - | - |
| - | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 47.6 | Cum | - | - |
| - | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 2.7 | Cum | - | - |
| - | Supply and Erecting of Centering for Drain Sides including cost and conveyance of materials and labour charges etc complete. | 106.49 | Sqm | - | - |
| - | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 44.55 | Cum | - | - |
| - | Cost and Supplying of Cut Stone Pillar of size 0.15 x 0.15 x 2.10m All Labour Charges Etc Completed | 16 | Nos | - | - |
| - | Supplying and fixing Chain Link - 2 x 2 using 10 Gauge Galvanised Iron Wire (of all sizes) including cost and conveyance fixing charges with Cut Stone using 16 gauge GI wire et | 69 | Sqm | - | - |
| - | GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Technicalbid.pdf
Tender Documents • 1.04 MB
BOQ_840354.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .