Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.6 LAdmitted-Finance | -1.00% | ₹7.6 L | L1 | Admitted-Finance |
| 2 | L2₹7.7 L+₹15,273.72 (2.02%)Admitted-Finance AT GROUND FLOOR MAIN BAZAAR MEHRE TEHSIL BARSAR DISTT HAMIRPUR H P PIN CODE 174305 | HAMIRPUR | HIMACHAL PRADESH | 174305 | +1.00% | ₹7.7 L+₹15,273.72 (2.02%) | L2 | Admitted-Finance |
| 3 | L3₹7.9 L+₹34,365.87 (4.55%)Admitted-Finance | +3.50% | ₹7.9 L+₹34,365.87 (4.55%) | L3 | Admitted-Finance |
Tender Value
₹7.6 L
EMD Value
₹15,300
Closing Date
19 Aug 2026, 10:30 amClosed
Executive Engineer
HPPWD Division Nadaun
C/O wire crate B/wall at RD 11/660 to 11/685 ).
2026_PWD_141147_5
NIT Letter No. 6328-77 dated 07-08-2026
Open Tender
Civil Works - Roads
Percentage
60 days
Nadaun
Please refer Tender documents.
16 documents required · 16 mandatory
₹350
₹15,300
25 Aug 2026
13 Aug 2026
19 Aug 2026
13 Aug 2026
19 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for all type of road structure such as retaining walls ,breast walls, culverts, drains and parapets etcetera in all type of classification of soil comprising of ordinary soil . ordinary rock, hard rock, chiseling/ wedging out of rock (where blasting is prohibited ) as per drawings and M.O.R.D technical specification clause 305-1 and as per direction of the Engineer-in- Charge including setting out, construction of shoring and bracing removal of stumps and other deleterious materials and disposal of materials upto any leads and lifts including dressing of sides and bottom and back filling in trenches with excavated suitable approved material to the original surface in layers not exceeding 150mm(one hundred fifty millimetre) compacted thickness including shoring and strutting and pumping and bailing out water ( surface and sub soil water) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per the direction of the Engineer-in- Charge including carriage of materials within all leads and lifts and other incidentals . The rates are inclusive octroi , royality , Malkana, toll tax, GST or other taxes imposed by the Government. | - | Per cubic metre | 498.9 | - |
| 2 | Excavation in earth work in hilly area in all heights and depths in all kind of soil by manual/mechanical means including saturated soil comprising of mixed soil, ordinary rock and hard rock all work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side,water pollution, etcetra and to protect stability of hill side track shall be excavated with chiseling and wedging out rock (where blasting is prohibited). all earth work in cutting/excavation including rock excavation shallbe carried,out true tolines,grades,side slopes, width, camber super-elevation and level as shown on the drawings or as directed by the Engineer-in-Charge,in conformit with the requirement of MORD technical specification 2014 (two thousand fourteen) for Rural Road. clause 300, 1603 (three hundred, one thousand six hundred three) of General conditions for contract to achieve designed formation width including hauling and stacking of material useful for construction at suitable sites and safe disposal & dumping to be arranged by the contractor of unsuitable cut materials in specified manner,trimming,filling of unevenness,blindage and finishing of the road to specified dimensions or as directed by the Engineer -in -Charge for smooth riding. The recovery for stones,whether useful or not, for 89.05cum(eighty nine point zero five cubic metre) in all cases,@ rupees 300/- only(Rupees three hundred only) per cubic meter shall be effected on pro- rata basis. Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor, which shall compensated by him in all cases.The rates are inclusive octrol,royality,Malkana, toll tal, or other taxes imposed by Government. | 1 | Per Cubic Metre | 300 | ₹299.7 |
| 3 | Providing and laying of boulder apron laid in wire creates with 4mm (four millimeter dia G.I wire conferring to I.S. 280 and IS-4826 in 100mmx100mm (one hundred millimeter into one hundred millimeter) mash WOVEN diagonally) including 10 percent extra for laps and joints laid with stone boulder weighting not less then 25kg (twenty five kilogram) each as per drawing and technical specification clause 1301. including carriage of material within all leads and lifts and other incidentals . The rates are inclusive of octroi, royality malkana ,toll tax , GST or other taxes imposed by the Government . | - | Per cubic metre | 3,400 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
SBD.pdf
Tender Documents • 5.14 MB
BOQ_209568.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .