Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹81.3 LAdmitted-Finance | L1 | Admitted-Finance |
Tender Value
₹86.6 L
EMD Value
₹1.7 L
Closing Date
30 Jun 2026, 4:00 pmClosed
CHIEF ENGINEER
VARANASI NAGAR NIGAM
MAIDAGIN CHAURAHA KA VIKAS HA KARYA
2026_NNVAR_1147776_2
31_2026_27
Open Tender
Civil Works
Percentage
90 days
VARANASI NAGAR NIGAM
AS PER TD
3 documents required · 3 mandatory
₹8,700
TENDER COST, Account no- 50100642535388
₹1.7 L
14 Jul 2026
22 Jun 2026
30 Jun 2026
22 Jun 2026
30 Jun 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1मैदागिन चौराहे का विकास कार्य। | |||||
| 1.01 | Demolishing Brick work Manually/ by mechanical means Including Stacking of erviceable material and disposal of unseviceable material within 50 metres lead as per direction of Engineer -in-charge.Cement Mortar | 14.11 | Cum | 1,559.67 | ₹22,006.94 |
| 1.02 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix | 7.84 | Cum | 1,842.85 | ₹14,447.94 |
| 1.03 | Demolishing R.C.C. work Manually by mechanical means Including Stacking of Steel bars and disposal of unseviceable material within 50 metres lead as per direction of Engineer-in-charge. | 18.89 | cum | 2,688.47 | ₹50,785.2 |
| 1.04 | Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer-in-charge. | 24.26 | Sqm | 868.49 | ₹21,069.57 |
| 1.05 | Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work. | 1,940.8 | Kg | 6.85 | ₹13,294.48 |
| 1.06 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | 1,808 | Kg | 4.28 | ₹7,738.24 |
| 1.07 | Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-charge. | 13.7 | Sqm | 42.66 | ₹584.44 |
| 1.08 | Taking out existing CC interlocking paverblocks from footpath /centra lverge, including removal of rubbish etc. ,disposal of unserviceable material to the dumping ground ,for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 548.12 | sqm | 99.74 | ₹54,669.49 |
| 1.09 | Excavating, supplying, stacking and filling of local earth (excluding royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 177.32 | Cum | 530.31 | ₹94,034.57 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
31TD-2.pdf
Tender Documents • 7.25 MB
BOQ_2179570.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .