Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
1 Jun 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Assistant Commissioner,North Zone,Coimbatore
The Assistant Commissioner, North Zone, Coimbatore Corporation Balasundaram Road,Oppsite Womens Polytechnic
Formation of BT Road at KK Nagar Cross Road in Ward no 13 in North zone.
2023_MAWS_315979_27
E1/Northzone/2023
Open Tender
Civil Works - Roads
Works
90 days
The Assistant Commissioner, North Zone
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹3,000
2 Jun 2023
18 May 2023
2 Jun 2023
18 May 2023
1 Jun 2023
18 May 2023
Amount
Earth work Excavation in all soild with initial lead and lift etc., complete as per direction of departmenttal officers.
Conveying of surplus earth from the site from 0 to 15 km including transport loading unloading etc completed.
Providing and laying well gravel including cost and conveyance of all materials from approved quarries as noted in lead chart to the road side including loading, unloading and stacking the well gravel at road side to departmental gauge for pre-measurement including labour charges for laying spreading leveling to camper etc., complete as per specifications.
Providing Water bound macadam for 75mm consolidated thickness for the bottom layer with grade II metal using 1 m3 of 63mm to 45mm IRC size HBG metal with 0.24 m3 of gravel for screening for 10 m2 of 75mm consolidated thickness, the grading of metal to confirm to table 400-6 of most specification including cost of conveyance of all materials to the worksite and stacking them with the standard departmental gauge labour charges for spreading metal and gravel hand packing metal to chamber watering with all leads for water forming edge bunds etc., and conslidating by power roller and hire charges for all other tools and plants etc., complete as per clause of 404 of ministry of surface transport specification II revision hire charges for machinery power roller 8-10 MT
Providing Water bound macadam for 75mm consolidated thickness for the top layer with grade III metal using 1 m3 of 53mm to 22.4mm IRC size HBG metal with 0.24 m3 of gravel for screening for 10 m2 of 75mm consolidation thickness. The grading of metal to confirm to table 400-6 of most specification including cost of conveyance of all materials to the work site and stacking them with the standard departmental gauge labour charges for spreading metal and gravel hand packing metal to chamber watering with all leads for water forming edge bunds etc., and conslidating by power roller and hire charges for all other tools and plants employed etc., complete as per column 404 of most specification. Hire charges formachinery power roller 8 - 10 T
Providing and laying tack coat over unprimed WBM surface using 4 kg. of bituminous of binder / 10 m2 area including cost of bituminous binder at the site including labour for perparing the surface applying the required quantity of bituminous binder as tack coat manually including hire charges of machinery and labour charges etc., complete
Providing and laying premix carpet 20mm consolidated thickness using IRC size machine broken HG metal 0.18 cum of 13.20mm and 0.09 cum of 11.20mm with 13.14 kg of 80/100 grade Bitumen for premixing for 10 sq.m of premix carpet and 0.09 cum of 6.70mm IRC size HBG metal with 8.82 kg of 80/100 grade bitumen for 10 sq.m for seal coat including cost and conveyance of all materials from approved quarry to work site and stacking them to departmental gauge for pre measurements including cost of bitumen which will be procured by the contractor at his own cost including conveyance of bitumen to work spot, handling charges for the same at both ends including heating the bitumen boiler, heating the aggregates and mixing them with Bitumen in mini hot mix plant for premix carpet rolling by power roller for premix carpets and sealcoat separately including labour charges for spreading the mix for premix carpet application bitumen for seal coat over the premix carpet including labour charges for spreading the seal coat including hire charges and running charges for mini hot mix plant power roller and all other tools and plants employed all indicated charges such as barricading, providing danger lights etc., complete complying with standards specifications as per MOST 509, 513.
Add :- GST @ 18%
R MANICKAM
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .